Skip to the record
Beware of cheap imitations.

Original source · versioned page text

DA Form 1 - 22 Key Court - OPW24.0137

of 13

Page text shows just the words. Original shows the document exactly as it was published.

  11) Dividing land into parts by agreement – how many parts are being created and what is the intended use of the
      parts?
   Intended use of parts created             Residential              Commercial              Industrial               Other, please specify:


   Number of parts created

   12) Boundary realignment
   12.1) What are the current and proposed areas for each lot comprising the premises?
                                Current lot                                                                Proposed lot
                                                   2
   Lot on plan description              Area (m )                             Lot on plan description               Area (m2)



   12.2) What is the reason for the boundary realignment?



   13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
   (attach schedule if there are more than two easements)
   Existing or               Width (m)        Length (m)        Purpose of the easement? (e.g.                     Identify the land/lot(s)
   proposed?                                                    pedestrian access)                                 benefitted by the easement




Division 3 – Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
   14.1) What is the nature of the operational work?
   ☐ Road work                                              ☐ Stormwater                          ☐ Water infrastructure
   ☐ Drainage work                                          ☐ Earthworks                          ☐ Sewage infrastructure
   ☐ Landscaping                                            ☐ Signage                             ☐ Clearing vegetation
   ☒ Other – please specify:                 New Driveway Crossover
   14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
   ☐ Yes – specify number of new lots:
   ☒ No
   14.3) What is the monetary value of the proposed operational work? (include GST, materials and labour)
   $10,000

PART 4 – ASSESSMENT MANAGER DETAILS

   15) Identify the assessment manager(s) who will be assessing this development application
   Noosa Council Operational Works
   16) Has the local government agreed to apply a superseded planning scheme for this development application?
   ☐ Yes – a copy of the decision notice is attached to this development application
   ☐ The local government is taken to have agreed to the superseded planning scheme request – relevant documents
      attached
   ☐ No




                                                                                                                                              Page 5
                                                                                                           DA Form 1 – Development application details
                                                                                                                     Version 1.4— 15 December 2023
Log in to download the original file

DA Form 1 - 22 Key Court - OPW24.0137.pdf · 338 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.