Engineering Report (Including Stormwater Management Plan), 62 Lake MacDonald Drive, Cooroy QLD, 4575 Arcos Project: 240444
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Stormwater Management Plan 12_05_26.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of sections 2 to 18 (of 39)
Section 2
Attention: Jess Knott 12 May 2026
Coast2Bay Housing Group Arcos Project: 240444
Report 01 Rev 2
By Email
Engineering Report (Including Stormwater Management Plan)
62 Lake MacDonald Drive, Cooroy
QLD, 4575
Document Control
Version Date Details Prepared Checked Approved
1 25.07.25 For Approval AK AK LS
2 12.05.26 For OPW Approval JH LS LS
Principal Civil Engineer
Lachlan Swann B.Eng (Civ) (Hons), CPEng, RPEQ, NER, MIEAust
[email protected]
Arcos Group
E [email protected]
W arcosgroup.com.au
A 177C Brisbane Road, Mooloolaba, QLD, 4557
Section 3
ABN 51 640 311 842
CONTACT
arcosgroup.com.au
OFFICES
Sunshine Coast | Brisbane | Gold Coast
Contents
1.0 Introduction ................................................................................................................................ 4
2.0 Proposed Development.............................................................................................................. 4
3.0 Site Access ................................................................................................................................ 5
3.1 Sight Distances .......................................................................................................................... 5
3.2 Parking ....................................................................................................................................... 5
3.3 Service Vehicles ......................................................................................................................... 6
3.4 Waste Collection ........................................................................................................................ 6
4.0 Earthworks ................................................................................................................................. 6
Stormwater Management ........................................................................................................................ 7
4.1 Drainage Network & Legal Point of Discharge .......................................................................... 7
4.2 External Catchments .................................................................................................................. 7
4.3 Flooding ..................................................................................................................................... 7
4.4 Stormwater Quality Management .............................................................................................. 7
4.4.1 Construction Phase Stormwater Quality Management ..................................................... 7
4.5 Stormwater Quantity Management ............................................................................................ 7
4.5.1 General .............................................................................................................................. 7
4.5.2 Rational Method ................................................................................................................ 8
4.5.3 Modelling ........................................................................................................................... 8
4.5.4 Existing & Developed Case Summary .............................................................................. 9
4.5.5 Mitigated Case................................................................................................................. 10
4.5.6 OSD Tank Details ............................................................................................................ 11
4.5.7 Reuse Tank Details ......................................................................................................... 11
5.0 Service Provisions .................................................................................................................... 12
5.1 Potable Water & Sewer ............................................................................................................ 12
5.2 Communications & Electrical ................................................................................................... 12
6.0 Conclusion ............................................................................................................................... 12
LIMITATIONS ........................................................................................................................................ 13
Appendix A – Civil Engineering Drawings ............................................................................................. 14
Appendix B – Construction Phase Stormwater Quality Management .................................................. 15
12 May 2026
Section 4
ABN 51 640 311 842
CONTACT
arcosgroup.com.au
OFFICES
Sunshine Coast | Brisbane | Gold Coast
1.0 Introduction
Arcos Unit Group Pty Ltd (Arcos) has been commissioned by Coast2Bay Housing Group to prepare
this Engineering Services Report, including stormwater management strategy, and drawings as a part
of an OPW development application with Noosa Shire Council (NSC).
This report addresses and provides advice around critical civil engineering issues, including (but not
limited to) feasibility of the proposed layout, site works, earthworks, access, service provisions, and
management of stormwater quality, quantity, and flooding.
2.0 Proposed Development
The proposed development calls for 25 new Affordable Rental Premesis (small dwellings) in a multi-
residential format at 62 Lake MacDonald Drive, Cooroy. The site is formally described as Lot 105 on
SP118458, has an area 3,163m2, and is currently zoned as ‘Community Facilities’. The Cooroy Local
Plan Area applies to the site, along with the following overlays:
• Biodiversity, Waterways, and Wetlands Overlay
• Landslide Hazard Overlay
• Extractive Resource Overlay
• Local Government Infrastructure Plan
The site is currently vacant and sits adjacent to a larger subdivision development which is already under
construction (refer NSC Application No. OPW/25/0057) and shall provide a new road frontage for site
access along the eastern bounday, and services (inclduing sewer and stormwater outfalls). The site is
also bound by Lake MacDonald Drive to the west. A locality plan can be seen in Figure 1 below.
The site is naturally sloped towards the new subdivision road (along its eastern boundary), and the built
form of the development follows the natural topography, providing three separate levels, but adhering
to Council’s height limits. A development site layout plan, showing the general arrangement of the site
has been included in Figure 2.
The purpose of the development is to provide high quality, yet affordable social housing to the local
community.
FIGURE 1: SITE LOCALITY (SOURCE: GOOGLE MAPS)
12 May 2026
Section 5
ABN 51 640 311 842
CONTACT
arcosgroup.com.au
OFFICES
Sunshine Coast | Brisbane | Gold Coast
FIGURE 2: DEVELOPMENT LAYOUT PLAN (SOURCE: ARCOS GROUP)
3.0 Site Access
The site shall be accessed via a new crossover to the new (currently not yet constructed) subdivision
road along the eastern boundary, which shall be built as part OPW/25/0057. The new crossover will be
a ‘General Wide’ arrangement built to Council and IPWEA standards, and can be seen in the concept
civil engineering drawings (refer Appendix A).
3.1 Sight Distances
There are no permanent sight obstructions for vehicles exiting the driveway, nor to the new subdivision
road intersection with existing Dianella Court (to the northeast of the site). Therefore, no sight distance
issues are present.
3.2 Parking
In line with Council’s planning scheme (Table 9.4.1.4) the development proposes to provide the
following mix of resident car parking spaces:
• 25 Covered Spaces
• 6 Vistor Spaces, of which 2 are designated as PWD
• 31 Total Car Parking Spaces
All car parking is to comply with NSC’s Driveway and Parking Code, PSP6 Engineering Design
Standards, and AS2890. Moreover, swepth path diagrams have been completed to demonstrate
adequate access, door clearances, and turnaround space for car parks.
12 May 2026
Section 6
ABN 51 640 311 842
CONTACT
arcosgroup.com.au
OFFICES
Sunshine Coast | Brisbane | Gold Coast
3.3 Service Vehicles
The site is designed to accommodate a Waste Collection vehicle (WCV) and checked with a Heavy
Rigid Vehicle (HRV). The site provides access in a forward gear, with a reverse exit onto the adjacent
subdivision road. Due to site constraints, and the nature of undercover parking (i.e. minimum height
clearances) it is not possible to provide a suitable turnaround area for the design and check vehicles.
3.4 Waste Collection
A bin store with 6 x 1,100L bulk storage bins (incorporating a washdown area) is to be provided in the
undercover carpark adjacent to the site access (as shown on the engineering plans, refer Appendix A).
Waste collection is to be provided via a 10.20m WCV, for which access grades from the proposed road
to the site have been considered. Bulk bins are to be manually handed and loaded onto the WCV by
Council’s waste contractor.
4.0 Earthworks
The existing site slopes evenly yet steeply, from a high point of RL113m in the south-west corner, to a
low point of RL104m in the northeast corner. This represents a significant level difference
(approximately 9m) across the site. The resulting development will therefore require significant
earthworks and retaining structures to ensure serviceable, safe, and equitable access to residents and
visitors. These structures and the proposed shaping of the site can be seen in the engineering drawings
in Appendix A.
The car park for the development shall sit underneath the dwellings as an undercroft, and shall be
predominantly cut into the site. The built form responds to the natural landform by terracing across the
existing slope.
The proposed earthworks will not impact existing stormwater, sewer infrastructure or any adjacent lots.
The surrounding subdivision will have already constructed a cutoff drain adjacent to the site’s western
boundary, and a proposed cutoff drain along the high side of any retaining structures will protect the
development from stormwater impacts. No earthworks will encroach on neighbouring properties.
All cutting and filling is to be carried out in accordance with AS3798:2007 Guidelines on Earthworks for
Commercial and Residential Developments. Any site filling will be from site spoil (subject to
Geotechnical Investigation), provided it meets the requirements of AS3798 and is placed with controlled
compaction. Filling extents are to be determined at detail design phase based on detail site survey
when finished surface levels of external pavements are confirmed.
All construction activities, including Erosion and Sediment Control (ESC) methods, would be managed
under the control measures of a Construction Environmental Management Plan (CEMP) for the
development site. The CEMP and ESC plans would be prepared for submission with the future
application for Operational Works Approval.
12 May 2026
Section 7
ABN 51 640 311 842
CONTACT
arcosgroup.com.au
OFFICES
Sunshine Coast | Brisbane | Gold Coast
Stormwater Management
The existing site has been developed in accordance with council’s approved development
OPW/25/0057. This development provides a stormwater outfall and water quality treatment for the site.
The minor storm event is defined as the 10% AEP storm plus climate change, with the major event
being the 1% AEP storm plus climate change.
4.1 Drainage Network & Legal Point of Discharge
Runoff from within the subject site is to be captured by a proposed underground pipe drainage network
and is to be conveyed to a future stormwater pit (provided by the surrounding subdivision), which shall
form the Legal Point of Discharge for the development. The proposed and future surrounding network
(as per OPW/25/0057) is shown in in the civil engineering concept plans, refer Appendi A.
4.2 External Catchments
The site is not impacted by external drainage catchments, as per the approved Operational Works
drawings for the surrounding development (OPW/25/0057). A future cutoff drain shall protect the site
from runoff from the west, and the neighbouring lot to the south predominately grades towards the new
subdivision road. A new cut-off drain along the southern boundary will be provided to redirect any minor
flows from the south, as per the civil engineering concept plans (refer Appendix A).
4.3 Flooding
The site is not impacted by flooding and is not covered by Council’s Flood Hazard Overlay.
4.4 Stormwater Quality Management
Stormwater quality is to be provided by a future bio-retention basin directly north of the subject site. The
bio-retention basin is to be built as a part of the surrounding subdivision works (refer OPW/25/0057)
and has been sized to cater for the fully developed catchment. As such, no additional stormwater quality
is proposed for the development.
4.4.1 Construction Phase Stormwater Quality Management
Stormwater quality management during the construction phase is critical to ensuring water quality
standards are achieved during the full life of the development. Implementing best practice Erosion and
Sediment Control techniques is imperative to managing the runoff quality affected by construction
works. Appendix B outlines best practice measures for stormwater quality during construction.
4.5 Stormwater Quantity Management
4.5.1 General
In accordance with the NSC Planning Scheme, stormwater quantity management is required for the
proposed development. To achieve compliance, an on-site detention (OSD) tank will be provided to
mitigate post-development peak flows.
12 May 2026
Section 8
ABN 51 640 311 842
CONTACT
arcosgroup.com.au
OFFICES
Sunshine Coast | Brisbane | Gold Coast
4.5.2 Rational Method
Stormwater calculations utilising the Rational Method were undertaken to validate the DRAINS
modelling. The following criteria was applied:
− The catchment area of the lot is 0.3161 ha;
− Existing case of 0% fraction impervious (fi), based on detail survey;
− Developed case of 69% fi, based on detailed design drawings;
− Time of concentration of 11 and 5 minutes were adopted for the existing and developed cases;
Rational method calculation was undertaken, peak flow summary for the site is shown in the following
Table 1:
TABLE 1: RATIONAL METHOD PEAK FLOWS
Storm Event Existing Case Developed Case Difference Difference
(AEP) (m3/s) (m3/s) (m3/s) (%)
63% 0.046 0.071 0.024 52.3%
39% 0.062 0.094 0.032 52.1%
18% 0.085 0.131 0.046 53.6%
10% 0.103 0.158 0.055 54.1%
5% 0.122 0.189 0.067 54.7%
2% 0.154 0.242 0.088 56.9%
1% 0.177 0.277 0.101 57.0%
1% (CC) 0.212 0.333 0.121 57.0%
Runoff flows are shown to increase requiring mitigation measures. Detention is considered in the
following sections to mitigate flow increases.
4.5.3 Modelling
Hydrological analysis of the Existing, Developed, and Mitigated cases was modelled using DRAINS.
The parameters adopted were generally based on recommendations by Australian Rainfall & Runoff
(AR&R) and QUDM. The model node parameters are summarised in Table 2.
TABLE 2: MODEL CATCHMENT NODES – SUBJECT SITE
Node Area (ha) Impervious (%) Scenario
Cat Existing 0.3161 0 Existing
Cat Developed 0.3161 69 Developed
Cat Roof 0.1803 100 Mitigated
Cat Road 0.0135 100 Mitigated
Cat Landscape 0.1223 20 Mitigated
Initial Loss (IL) and Continuing Loss (CL) information have been adopted for the DRAINS model, and
the parameters are outlined in Table 3. The site-specific ARR data hub information is also included for
reference; however, the initial loss value is not to be adopted directly for urban development and
therefore reduced according to AR&R 2019 guidance.
12 May 2026
Section 9
ABN 51 640 311 842
CONTACT
arcosgroup.com.au
OFFICES
Sunshine Coast | Brisbane | Gold Coast
TABLE 3: MODEL LOSS PARAMATERS
Surface Type ARR Data Hub ARR Data Hub Adopted IL(mm) Adopted CL
IL (mm) CL (mm/h) (mm/h)
Impervious - - 1 0
Pervious 32 2.6 25 2.6
The DRAINS model layout is for the existing, developed, and mitigated case is shown in Figure 3
FIGURE 3: DRAINS MODEL LAYOUT
4.5.4 Existing & Developed Case Summary
DRAINS modelling was undertaken, peak flow summary of the existing case and developed case for
the site are shown in the following Table 4. The peak discharges were estimated using all storm
ensembles across 5-minute to 360-minute durations.
TABLE 4: DRAINS PEAK FLOWS
Storm Event Existing Case Developed Case Difference Difference
(AEP) (m3/s) (m3/s) (m3/s) (%)
63% 0.041 0.073 0.032 78.0%
39% 0.063 0.091 0.028 44.4%
18% 0.092 0.119 0.027 29.3%
10% 0.110 0.139 0.029 26.4%
5% 0.134 0.171 0.037 27.6%
2% 0.154 0.199 0.045 29.2%
1% 0.174 0.227 0.053 30.5%
1% (CC) 0.218 0.283 0.065 29.8%
12 May 2026
Section 10
ABN 51 640 311 842
CONTACT
arcosgroup.com.au
OFFICES
Sunshine Coast | Brisbane | Gold Coast
The modelled discharges were compared with the Rational Method calculations for the existing and
developed cases to validate the DRAINS model, refer Table 5 and Table 6. The modelled discharges
compare well with the Rational Method calculations.
TABLE 5: EXISTING FLOWS COMPARISON (RATIONAL METHOD VS DRAINS)
Storm Event Rational DRAINS Difference Difference
(AEP) Method (m3/s) (m3/s) (m3/s) (%)
63% 0.046 0.041 -0.005 -11.5%
39% 0.062 0.063 0.001 2.1%
18% 0.085 0.092 0.007 8.0%
10% 0.103 0.110 0.007 7.2%
5% 0.122 0.134 0.012 9.6%
2% 0.154 0.154 0.000 0.0%
1% 0.177 0.174 -0.003 -1.4%
1% (CC) 0.212 0.218 0.006 2.9%
Average (mean) 0.003 2.1%
TABLE 6: DEVELOPED FLOWS COMPARISON (RATIONAL METHOD VS DRAINS)
Storm Event Rational DRAINS Difference Difference
(AEP) Method (m3/s) (m3/s) (m3/s) (%)
63% 0.071 0.073 0.002 3.4%
39% 0.094 0.091 -0.003 -3.0%
18% 0.131 0.119 -0.012 -9.1%
10% 0.158 0.139 -0.019 -12.1%
5% 0.189 0.171 -0.018 -9.6%
2% 0.242 0.199 -0.043 -17.7%
1% 0.277 0.227 -0.050 -18.1%
1% (CC) 0.333 0.283 -0.050 -14.9%
Average (mean) -0.024 -10.1%
4.5.5 Mitigated Case
Peak flows from the developed case are shown to be mitigated using OSD. A summary of the existing
and mitigated peak flows is shown below in Table 7. Roof water is directed to the OSD, prior to the
connection to the existing public network. The landscape surface flows bypass the tank whilst achieving
mitigation.
12 May 2026
Section 11
ABN 51 640 311 842
CONTACT
arcosgroup.com.au
OFFICES
Sunshine Coast | Brisbane | Gold Coast
TABLE 7: DRAINS MITIGATED PEAK FLOWS
Storm Event Existing Case Mitigated Case Difference Difference
(AEP) (m3/s) (m3/s) (m3/s) (%)
63% 0.041 0.039 -0.002 -4.9%
39% 0.063 0.053 -0.010 -15.9%
18% 0.092 0.072 -0.020 -21.7%
10% 0.110 0.080 -0.030 -27.3%
5% 0.134 0.094 -0.040 -29.9%
2% 0.154 0.113 -0.041 -26.6%
1% 0.174 0.156 -0.018 -10.3%
1% (CC) 0.218 0.199 -0.019 -8.7%
Average (mean) -0.023 -18.2%
4.5.6 OSD Tank Details
On-Site Detention (OSD) is proposed with flow controls as shown in Table 8.
TABLE 8: DETENTION TANK DETAILS
Feature Details
Detention Volume (Total) Minimum 76kL
Detention Volume Eight 9.5kL underground concrete tanks.
47.5m2 base x 1.6m high.
Maximum Water Elevation 1.6m (internal height)
Orifice Flow Stainless steel sheet to wall of tank.
70mm diameter orifice, at the base.
105mm diameter orifice, 0.5m above the base.
90mm diameter orifice, 1.0m above the base.
Surcharge 600mm x 600mm surcharge grate, at driveway surface level
4.5.7 Reuse Tank Details
In addition to OSD storage, a minimum rainwater reuse volume of 3,000L is required for each dwelling,
in accordance with the Sustainable Building Desing Code. This will require a 75kL of reuse storage for
the 25 dwellings.
The reuse tank is proposed to be stored within eight 9.5kL underground tanks with a pump to allow the
stormwater to be utilised, refer to Civil Drawings. Only the roof water runoff will be piped to the reuse
tank with all other sources directly flowing to the OSD tank. Flows from the reuse tank will overflow to
the OSD tank through a piped connection and backflow prevention fitting.
12 May 2026
Section 12
ABN 51 640 311 842
CONTACT
arcosgroup.com.au
OFFICES
Sunshine Coast | Brisbane | Gold Coast
5.0 Service Provisions
5.1 Potable Water & Sewer
A new potable water main along with a new sewer main and property service will be provided to the lot
within the future adjacent road reserve by the surrounding subdivision. As such the existing service
shall be utilised by the development.
5.2 Communications & Electrical
Details of electrical supply and communication infrastructure and services proposed for the
development site are outside the scope of this report. However, we understand that supply to the
development can be provided via an extension to the adjacent underground electricity network.
6.0 Conclusion
This Engineering Services Report has been prepared to provide a review and information on the
Engineering requirements to support the application for OPW on the proposed development at 62 Lake
MacDonald Drive, Cooroy (Lot 105 on SP118458). The following requirements have been reviewed
as part of this report:
• Suitable access can be provided off the future subdivision road;
• Minimum site distance can be achieved by the development;
• A total of 31 parking spaces shall be provided;
• The development can be servied by a WCV;
• The site is not impacted by flooding or significant external catchments;
• The surrounding subdivision is providing stormwater quality management;
• On-site detention shall be provided to cater for stormwater quantity management;
• Sewerage reticulation can be connected to the future Unitywater network; and
• Water reticulation can be connected to the future Unitywater network.
In summary, this report shows that the development site can be adequately serviced and provision
made as currently shown and in further detailed design for this development to be in accordance with
Council's code requirements.
12 May 2026
Section 13
ABN 51 640 311 842
CONTACT
arcosgroup.com.au
OFFICES
Sunshine Coast | Brisbane | Gold Coast
LIMITATIONS
Arcos Unit Group Pty Ltd (Arcos) has prepared this document for the project described on the title page
for the client's exclusive use. The document is specific to this particular project and for the purposes as
described within the document. The document cannot be used for any other project on the same site or
other sites or relied upon by a third party. Any party relying upon this document beyond its exclusive
use and purpose as stated above, and without the express written consent of Arcos, does so entirely
at its own risk and without recourse to Arcos for any loss or damage. Arcos has necessarily relied upon
information provided by the client and/or their agents.
The required detailed design for the service infrastructure will be subject to the conditions (if any),
attached to the Development Approval provided by Council and any nominated referral agencies.
The advice given in this document is based upon the assumed conditions and data outlined herein. The
relevance and accuracy of advice given are directly affected by variations in the information supplied
and open source information relied upon.
This document must be kept in its entirety, read in full and understood. Interpretations or conclusions
made by others unless supported by an expressed written statement, interpretation, outcome or stated
within this document cannot be the responsibility of Arcos.
This document or parts of it should not be used as part of a specification or design for a project without
prior review and agreement by Arcos.
12 May 2026
Section 14
ABN 51 640 311 842
CONTACT
arcosgroup.com.au
OFFICES
Sunshine Coast | Brisbane | Gold Coast
Appendix A – Civil Engineering Drawings
12 May 2026
Section 15
PROJECT & PHASE
SOCIAL HOUSING
OPERATIONAL WORKS - CIVIL
CLIENT
COAST2BAY
HOUSING GROUP
SITE ADDRESS / PROPERTY ID
62 LAKE MCDONALD DRIVE,
COOROY, QLD, 4563
DRAWING INDEX
DRAWING No. REV DRAWING TITLE
240444-OPW-C-001 C COVER SHEET, LOCALITY & DRAWING INDEX
DI 240444-OPW-C-011 C GENERAL NOTES & DETAILS
AN
EL 240444-OPW-C-101 C EXISTING FEATURES PLAN
L A
CT 240444-OPW-C-201 C EARTHWORKS PLAN
240444-OPW-C-211 C EARTHWORKS SECTIONS & DETAILS
240444-OPW-C-212 C EARTHWORKS SECTIONS & DETAILS
240444-OPW-C-221 C EROSION & SEDIMENT CONTROL PLAN
SITE LOCATION
DR
240444-OPW-C-231 C
D
EROSION & SEDIMENT CONTROL NOTES & STANDARD DETAILS
AL
ON
240444-OPW-C-251 C RETAINING WALL PLAN
CD
240444-OPW-C-261 C RETAINING WALL LONGITUDINAL SECTIONS
MA
240444-OPW-C-262 C
E
RETAINING WALL LONGITUDINAL SECTIONS
K
LA
240444-OPW-C-263 C RETAINING WALL LONGITUDINAL SECTIONS
240444-OPW-C-281 C RETAINING WALL & FENCING TYPICAL DETAILS
240444-OPW-C-301 C DEVELOPMENT SITE PLAN
240444-OPW-C-302 C SETOUT PLAN
240444-OPW-C-311 C ROADWORKS SETOUT PLAN
240444-OPW-C-321 C ROADWORKS LONGITUDINAL SECTIONS
240444-OPW-C-371 C CONCRETE JOINTING PLAN
IMAGE (NEARMAPS) 240444-OPW-C-372 C CONCRETE JOINTING DETAILS
LOCALITY PLAN 240444-OPW-C-401 C STORMWATER PLAN
SCALE N.T.S 240444-OPW-C-411 C STORMWATER TANK SECTION
240444-OPW-C-431 C STORMWATER LONGITUDINAL SECTIONS
240444-OPW-C-501 C SEWER & WATER NOTES & DETAILS
Filename: C:\PROJECTS\240444 - SOCIAL HOUSING - 62 LAKE MACDONALD DRIVE, COOROY\3.0 CAD\DRAWINGS\OPW\240444-OPW-C-001.DWG
240444-OPW-C-502 C SEWER & WATER PLAN
RP DESCRIPTION
LOT 105 SP118458
SITE AREA = 3,163m²
Last saved by: JACKHARRISON(2026-04-23) Last Plotted: 2026-04-24 9:21 AM
COUNCIL PERMIT No. MCU25/0118
Project No. Status Drawing No. Rev No.
240444 FOR TENDER OPW-C-001 C
Section 16
GENERAL NOTES: ROADWORKS & DRIVEWAY NOTES: REINFORCED CONCRETE NOTES:
1. DRAWINGS TO BE READ IN CONJUNCTION WITH ALL RELEVANT DOCUMENTATION, LOCAL AUTHORITY 1. COMPACT THE EXPOSED SUBGRADE OR LOOSE TOP LEVEL MATERIAL TO A MINIMUM 100% STANDARD MAXIMUM GENERAL
SPECIFICATIONS (OR ARCOS GROUP SPECIFICATIONS IF SUPPLIED). ANY POINT OF CONFLICT IS TO BE DRY DENSITY (MDD) TO AS1289. ANY 'SOFT SPOTS' IDENTIFIED BY THE PROOF ROLLING SHALL BE REMOVED AND CONCRETE SHALL BE IN ACCORDANCE WITH AUSTRALIAN STANDARD SPECIFICATIONS
IDENTIFIED BY THE CONTRACTOR AN WILL BE RESOLVED BY THE SUPERINTENDENT. REPLACED WITH A COMPACTED IMPORTED GENERAL FILL MATERIAL TO THE ABOVE COMPACTION
REQUIREMENTS. · AS 3600 - "SAA CONCRETE STRUCTURES CODE".
2. THE DEVELOPER IS TO NOMINATE THE SUPERINTENDENT AND/OR THE SUPERVISING RPEQ FOR THE WORKS
AND NOTIFY ALL RELEVANT PARTIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. 2. ALL EXPOSED SUBGRADE AREAS SHALL BE COMPACTED IN LAYERS NOT EXCEEDING 150mm COMPACTED IN ADDITION TO THE ABOVE CODE THE FOLLOWING AUSTRALIAN STANDARD SPECIFICATIONS AND CODES OR
THICKNESS. THEIR LATEST REVISION SHALL APPLY:
3. DIMENSIONS IN METRES U.N.O. DO NOT SCALE FROM DRAWINGS. USE PRINTED DIMENSIONS ONLY AND IF IN
DOUBT ASK SUPERINTENDENT FOR CLARIFICATION. 3. GEOTECHNICAL INVESTIGATIONS REQUIRED IN ORDER TO DETERMINE SUBGRADE PROPERTIES & PREPARATION · AS1012 PARTS 1-19 - METHODS FOR THE TESTING OF CONCRETE (METRIC UNITS)
4. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH COUNCIL APPROVAL CONDITIONS, DEVELOPMENT DETAILS. CONTRACTOR TO UNDERTAKE 4-DAY SOAKED CBR ON EXISTING SUBGRADE AND RESULTS TO BE A · AS3583.1,2,3,8 - METHODS OF TEST FOR SUPPLEMENTARY CEMENTITIOUS MATERIALS FOR USE WITH
MINIMUM OF 5%. TESTING TO BE PROVIDED TO SUPERVISING ENGINEER PRIOR TO PROOF ROLL. PORTLAND CEMENT
WARNING
GUIDELINES, ASSOCIATED STANDARD DRAWINGS AND SPECIFICATIONS U.N.O.
4. LEVELS SHOWN ARE FINISHED SURFACE LEVELS INCLUSIVE OF TOPSOIL LAYER OR BUILDING SLAB THICKNESS. BEWARE OF UNDERGROUND SERVICES
5. EXISTING SERVICES AND STRUCTURES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS SUCH THEIR · AS3582.1 - SUPPLEMENTARY CEMENTITIOUS MATERIALS FOR USE WITH PORTLAND CEMENT- FLY ASH
ACCURACY CANNOT BE GUARANTEED. IT IS THE CONTRACTORS RESPONSIBILITY TO ESTABLISH THE LOCATION 5. FINISHED SURFACES TO ALL DISTURBED AREAS ARE TO BE TREATED IN ACCORDANCE WITH LANDSCAPE · AS1141 - METHODS FOR SAMPLING AND TESTING AGGREGATES POSITION OF EXISTING UNDERGROUND SERVICES SHOWN
AND LEVEL OF ALL EXITING SERVICES PRIOR TO COMMENCEMENT OF ANY WORK. DISCREPANCIES SHALL BE DRAWINGS AND/OR TYPICAL SECTIONS.
REPORTED TO THE SUPERINTENDENT. · AS1302 - STEEL REINFORCING BARS FOR CONCRETE IS APPROXIMATE ONLY. EXACT POSITION SHALL BE
6. CONTRACTOR TO OBTAIN ROADWORKS AND FOOTPATH PERMITS FOR ANY PROPOSED WORKS EXTERNAL TO PROVEN ON SITE BY THE CONTRACTOR PRIOR TO
6. ON COMPLETION OF SERVICES INSTALLATION, ALL AREAS SHALL BE RESTORED TO ORIGINAL LEVEL, INCLUDING THE SITE BOUNDARY. · AS1303 - HARD DRAWN STEEL REINFORCING WIRE FOR CONCRETE
COMMENCEMENT OF CONSTRUCTION
KERBS, FOOTPATHS, CONCRETE AREAS, GRAVEL AREAS, GRASSED AREAS AND ROAD PAVEMENTS. 7. SUBSOIL DRAINAGE UNDER KERBS TO BE IN ACCORDANCE WITH IPWEA STD DRG RSD-801 & 802. · AS1304 - HARD DRAWN STEEL WIRE REINFORCING FABRIC FOR CONCRETE
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO COUNCILS INFRASTRUCTURE. 8. ALL TEMPORARY AND FINAL BATTER SLOPES ARE TO BE INSPECTED BY AN APPROVED GEOTECHNICAL · AS3972 - PORTLAND AND BLENDED CEMENTS
SUCH REPAIR OR REINSTATEMENT TO BE CARRIED OUT IMMEDIATELY TO THE SATISFACTION OF LOCAL ENGINEER. · AS1379 - READY-MIXED CONCRETE (METRIC UNITS)
COUNCIL. LOCATION OF SERVICES
9. KERB PROFILES TO BE IN ACCORDANCE WITH IPWEA STD DRG RSD-200. · AS2758 - CONCRETE AGGREGATES PRIOR TO COMMENCEMENT OF NEW WORK THE
8. THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT PLANS, INCLUDING TRAFFIC MANAGEMENT PLAN,
ENVIRONMENTAL MANAGEMENT PLAN AND WORKPLACE HEALTH AND SAFETY PLAN FOR REVIEW AND 10. EXISTING PAVEMENT TRENCHING & REINSTATEMENT TO BE IN ACCORDANCE WITH IPWEA STD DRG RSD-803. · AS1478, AS1479 - CODE OF PRACTICE FOR USE OF CHEMICAL ADMIXTURES IN CONCRETE CONTRACTOR SHALL CONFIRM LOCATIONS, LEVELS AND
APPROVAL OF PRINCIPAL AND SUPERINTENDENT, PRIOR TO CONSTRUCTION. · AS3610 - FORMWORK FOR CONCRETE DETAILS OF EXISTING CONNECTION POINTS AND SERVICE
EARTHWORKS NOTES: CROSSINGS BY POT HOLING. IF A VARIATION OCCURS
9. ALL MATERIALS SPECIFIED ARE TO BE UTILISED, UNLESS WRITTEN APPROVAL FROM THE SUPERINTENDENT, SUPPLY
SUPERVISING RPEQ OR APPROVING AUTHORITY. 1. ALL EXCAVATION AND FILLING SHALL BE CONSTRUCTED IN ACCORDANCE WITH AS3798 AND IN ACCORDANCE CONTACT THE ENGINEER PRIOR TO CONSTRUCTION.
WITH THE CURRENT LOCAL AUTHORITY AND ARCOS SPECIFICATIONS. 1. ALL CONCRETE IS TO BE SUPPLIED BY A LICENSED READY MIXED CONCRETE MANUFACTURER. NO ON SITE
10. THE CONTRACTOR IS TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL WORKPLACE HEALTH AND SAFETY BATCHING IS ACCEPTABLE.
REQUIREMENTS. 2. ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND FULLY OPERATIONAL BEFORE
11. WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE IN CLOSE PROXIMITY TO NEIGHBOURING LOT COMMENCING UP-SLOPE EARTHWORKS. 2. MANUFACTURERS MUST HAVE AN APPROVED AND CERTIFIED QUALITY ASSURANCE PROGRAM IN PLACE PROTECTION OF SERVICES
AND BE APPROVED BY THE ENGINEER PRIOR TO SUPPLY OF ANY CONCRETE.
BOUNDARIES OR INFRASTRUCTURE, THE CONTRACTOR IS TO ALLOW IN SCOPE OF WORKS TO PROVIDE ALL 3. THE CONTRACTOR SHALL REMOVE ALL STRUCTURES, DEBRIS AND FENCES FROM THE SITE TO THE THE CONTRACTOR SHALL CONTACT THE RELEVANT
MEASURES NECESSARY TO ENSURE THE INTEGRITY OF EXISTING BOUNDARIES AND INFRASTRUCTURE. THIS 3. ALL MATERIALS, STORAGE, BATCHING, ETC TO CONFORM TO THE REQUIREMENTS OF THE RELEVANT AUTHORITIES AND ARRANGE FOR RELOCATION AND / OR
SATISFACTION OF THE SUPERINTENDENT. AUSTRALIAN STANDARDS.
MAY INCLUDE THE USE OF LOW VIBRATION EQUIPMENT, TRENCH SHORING ETC AS REQUIRED. PROTECTION OF EXISTING SERVICES AS REQUIRED TO SUIT
4. EXISTING SURFACE IS TO BE CLEAR OF ORGANIC MATERIAL PRIOR TO THE START OF FILLING.
12. THE CONTRACTOR SHALL NOTIFY ALL RELEVANT AUTHORITIES AND ENSURE REQUIRED CONDITIONS HAVE BEEN 4. ALL CONCRETE TO BE NORMAL-CLASS IN ACCORDANCE WITH AS3600 UNLESS NOTED OTHERWISE. SURROUNDING NEW WORK, CONSTRUCTION LOADINGS AND
5. FILL IS TO BE OF GOOD QUALITY AND FREE OF UNSUITABLE MATERIAL. TO SUIT FINAL FINISHED SURFACE LEVELS AND GRADES.
MET PRIOR TO COMMENCEMENT. THE CONTRACTOR SHALL NOTIFY ARCOS GROUP PRIOR TO COMMENCING 5. ALL CONCRETE SHALL HAVE A SHRINKAGE STRAIN NOT EXCEEDING 600 MICROSTRAIN.
WORKS AND RECEIVE WRITTEN CONFIRMATION THAT THE WORKS CAN COMMENCE. 6. FILL TO BE PLACED IN MAXIMUM 200mm LIFTS, UNLESS APPROVED OTHERWISE BY A SUITABLY QUALIFIED
6. ALL CONCRETE IS SPECIFIED BY 28 DAY COMPRESSIVE STRENGTH U.N.O.
13. CONTRACTOR SHALL PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL CONSTRUCTED WORKS IN ACCORDANCE CONSULTANT, AND COMPACTED TO SPECIFICATION.
7. ALL REINFORCEMENT TO BE SUPPLIED BY A REGISTERED MANUFACTURER WITH AN APPROVED AND
WITH COUNCIL REQUIREMENTS UNLESS OTHERWISE ADVISED BY ARCOS GROUP. 7. NOTWITHSTANDING THE LIMITS OF CUTTING AND FILLING SHOWN ON THE DRAWINGS, THE ACTUAL LIMITS CERTIFIED QUALITY SETTING OUT
14. THE CONSTRUCTION PRE-START MEETING IS AN OPPORTUNITY FOR ALL PARTIES TO DISCUSS CRITICAL ISSUES, SHALL BE DETERMINED ON SITE BY THE SUPERINTENDENT DURING CONSTRUCTION. SIMILARLY, THE FINISHED
8. ASSURANCE PROGRAM IN PLACE. ALL REINFORCEMENT IS TO COMPLY WITH THE REQUIREMENTS OF DESIGN FINISHED SURFACE LEVELS OF STRUCTURES ARE FOR
SUCH AS: SURFACE LEVELS MAY BE ADJUSTED BY THE WRITTEN DIRECTION OF THE SUPERINTENDENT DURING THE CONTRACTOR'S GUIDANCE ONLY. ACTUAL FINISHED LEVELS
AS1302, AS1303 AND AS1304 AS APPLICABLE.
● KEY OBJECTIVES OF THE EROSION AND SEDIMENT CONTROL PLAN; CONSTRUCTION AFTER AMENDED DRAWINGS HAVE BEEN APPROVED BY COUNCIL. SHALL BE SET OUT AS DIRECTED ON-SITE IN KEEPING WITH THE
9. ALL REINFORCEMENT IS TO BE DELIVERED TO SITE FREE FROM OIL, GREASE OR OTHER SURFACE
8. ALL AREAS SUBJECT TO EARTHWORKS ARE TO BE FREE DRAINING WITH A MINIMUM SLOPE OF 1:100 (1%). REQUIREMENTS AND SPECIFICATIONS OF THE LOCAL AUTHORITY
● REQUIRED WATER QUALITY OBJECTIVES; COATINGS WHICH MAY IMPAIR BOND TO CONCRETE.
AND ACTUAL FINISHED GROUND LEVELS.
9. ALL DRAINAGE STRUCTURES ARE TO BE PRESERVED FROM THE EFFECTS OF STRUCTURAL LOADING 10. ALL REINFORCEMENT TO BE 500 MPA MINIMUM YIELD U.N.O.
● PERFORMANCE MONITORING AND INSPECTION PROCEDURES; GENERATED BY THE EARTHWORKS.
● IDENTIFICATION OF THE RESPONSIBLE SITE OFFICERS; FORMWORK
10. ANY AREA DISTURBED OUTSIDE OF THE WORKS AREA SHOWN SHALL BE REHABILITATED TO A MINIMUM OF THE
PRE-CONSTRUCTION CONDITIONS, AT THE CONTRACTORS EXPENSE. 1. ALL CONCRETE OTHER THAN CAST AGAINST GROUND, SHALL BE PLACED AGAINST TIMBER, PLYWOOD OR
● IDENTIFICATION OF CRITICAL ENVIRONMENTAL CONCERNS;
STEEL FORMS. INSPECTIONS & HOLD POINTS:
· REPORTING PROCEDURES FOR NON-COMPLIANCE ACTIVITIES AND EVENTS. 11. EARTHWORKS BATTERS ARE TO BE TREATED AS FOLLOWS:
2. ALL FORMWORK SHALL COMPLY WITH THE REQUIREMENTS OF AS15O9 AND AS151O. · PRE-START MEETING
· 1:4 OR FLATTER TO BE GRASS SEEDED U.N.O
3. REFER ARCHITECT'S DRAWINGS FOR REQUIRED FORMWORK CLASS WHERE APPLICABLE. CLASS B · SET OUT
· STEEPER THAN 1:4 TO BE MULCHED & PLANTED IN ACCORDANCE WITH THE LANDSCAPE PLANS FORMWORK SHALL BE ADOPTED U.N.O. · SUBGRADE PROOF-ROLLS
ENVIRONMENTAL MANAGEMENT NOTES: 13. TREE REMOVAL WORKS TO BE UNDERTAKEN BY A SUITABLY QUALIFIED AND INSURED CONTRACTOR. TIMBER IS 4. ALL TEMPORARY FORMWORK, FALSEWORK, PROPPING, BRACING, TO BE DESIGNED AND CERTIFIED BY A · CONCRETE PRE-POURS
1. THE CONTRACTOR IS RESPONSIBLE FOR ALL ENVIRONMENTAL PROTECTION MEASURES BEING IMPLEMENTED TO BE REMOVED, REUSED OR RECYCLES IN AN APPROPRIATE AND A SUSTAINABLE MANNER WHERE POSSIBLE. REGISTERED PROFESSIONAL ENGINEER (RPEQ) PRIOR TO ERECTION.
· STORMWATER
ON SITE PRIOR AND DURING CONSTRUCTION. 5. ALL REINFORCEMENT TO BE SUPPORTED OFF FORMS WITH PLASTIC OR PLASTIC TIPPED WIRE CHAIRS TO
STORMWATER DRAINAGE NOTES: PROVIDE THE SPECIFIED COVER. ALL CONCRETE CAST AGAINST GROUND TO BE UNDERLAIN BY
· BIO BASIN MATERIALS & DRAINAGE
2. NO VEGETATION BEYOND THE EXTENT OF EARTHWORKS OR THAT SHOWN ON THE PLANS IS TO BE UNDERTAKEN
WITHOUT PRIOR CONSENT FROM THE SUPERINTENDENT. 1. ALL STORMWATER DRAINAGE HAS BEEN DESIGNED AND IS TO BE CONSTRUCTED IN ACCORDANCE WITH WATERPROOF MEMBRANE. · PAVEMENT PRE SEAL
AS3500, LOCAL COUNCIL AUTHORITY REQUIREMENTS, IPWEA AND QUDM. · FINAL INSPECTION
3. ALL VEGETATION BEING RETAINED ON SITE MUST BE IDENTIFIED AND PROTECTED FROM DAMAGE. TRANSPORT
2. EXCAVATION, BEDDING AND BACKFILLING OF STORMWATER DRAINAGE PIPES TO BE IN ACCORDANCE WITH · ON MAINTENANCE
4. EROSION AND SEDIMENT CONTROL IS THE RESPONSIBILITY OG THE CONTRACTOR AND MUST BE IMPLEMENTED IPWEA STD DRG DSD-201 & 202. 1. ALL CONCRETE IS TO BE TRANSPORTED TO SITE IN AGITATOR TRUCKS. CONCRETE NOT PLACED WITHIN
PRIOR TO CONSTRUCTION COMMENCING AND DURING CONSTRUCTION. ONE HOUR AFTER BATCHING MAY BE REJECTED AT THE ENGINEER'S DISCRETION
3. ALL MANHOLES TO BE MIN 1050mm DIAMETER IN ACCORDANCE WITH IPWEA STD DRG DSD-101.
5. ALL DISTURBED AREAS SHALL BE LEFT IN A STABLE CONDITION. THIS WILL INVOLVE SEEDING OR TURFING WITH PLACEMENT, COMPACTION AND FINISHING
APPROPRIATE GRASS SPECIES. ANY DISTURBED SLOPES SHALL BE COVERED WITH A SUITABLE FORM OF 4. ALL GRATES & MANHOLE COVERS LOCATED WITHIN ROADWAY TO BE SOLID DUCTILE CAST IRON CLASS 'D',
AND WHERE NOT LOCATED WITHIN ROADWAY TO BE CLASS 'B' U.N.O, IN ACCORDANCE WITH IPWEA STD 1. CONCRETE TO BE PLACED IN FORMS BY HORIZONTAL 'CHUTING' NO MORE THAN 3m³, CONCRETE PUMPING
EROSION CONTROL. OR KIBBLING. UNDER NO CIRCUMSTANCES SHALL CONCRETE BE INDUCED TO FLOW HORIZONTALLY BY
DRG DSD-103 & DSD-104.
6. PIPELINES ADJACENT TO SIGNIFICANT TREES MUST BE INSTALLED BY BORING OR DIRECTIONAL DRILLING USE OF VIBRATORS.
UNLESS OTHERWISE AGREED WITH THE SUPERINTENDENT. 5. ALL FIELD INLETS TO BE IN ACCORDANCE WITH IPWEA STD DRG DSD-401.
2. ALL CONCRETE SHALL BE PLACED CONTINUOUSLY BETWEEN CONSTRUCTION JOINTS AS DETAILED, IN
7. TOPSOIL AND SUBSOIL MUST BE STOCKPILED SEPARATELY AND NOT LOCATED UNDER TREE CANOPIES. 6. ALL GULLY PITS TO BE KERB IN LINE (K.I.L) U.N.O IN ACCORDANCE WITH IPWEA STD DRG DSD-402. SUCH A MANNER AS TO AVOID 'COLD JOINTS'. CONSTRUCTION JOINTS SHALL BE LOCATED AS DETAILED ON
7. ALL GULLY PITS TO BE LIP IN LIINE (L.I.L) U.N.O IN ACCORDANCE WITH IPWEA STD DRG DSD-403. DRAWINGS OR AS INSTRUCTED IN WRITING BY THE ENGINEER.
8. ALL STOCKPILES MUST HAVE APPROPRIATE SEDIMENT CONTROLS IN ACCORDANCE WITH THE ENVIRONMENTAL
MANAGEMENT PLAN. 8. ALL ANTI-PONDING GULLY PITS TO BE KERB IN LINE (K.I.L) U.N.O IN ACCORDANCE WITH IPWEA STD DRG 3. ALL CONCRETE IS TO BE COMPACTED UPON PLACEMENT USING 5OMM DIAMETER VIBRATORS.
9. NO SOIL CAN BE STOCKPILED WITHIN 5M OF ANY CREEK OR WATER COURSE. DSD-404. 4. SLABS AND BEAMS ARE TO HAVE A FILM OF APPROVED ALPHATIC ALCOHOL APPLIED TO THE SURFACE,
9. ALL REINFORCED CONCRETE PIPES ARE TO BE INSTALLED USING TYPE 'HS2' SUPPORT U.N.O AS DEFINED DIRECTLY AFTER SCREEDING, PRIOR TO FLOATING, REGARDLESS OF WEATHER CONDITIONS.
10. ANY SOIL DISTURBED ON SITE IS TO BE REUSED ON SITE. ANY UNSUITABLE MATERIAL NOT REUSED MUST BE
DISPOSED OF AT A REGULATED WASTE DISPOSAL FACILITY. IN AS3725 - LOADS ON BURIED CONCRETE PIPES. IF ALTERNATIVE BEDDING METHODS ARE TO BE USED 5. ADDITIONAL PROTECTIVE MEASURES SUCH AS CHILLED MIX WATER, SHADING PLACEMENT AREAS, WIND
THE PIPE CLASS MUST BE REVIEWED. BREAKS, ETC MAY BE REQUIRED BY THE ENGINEER IF PLACING CONCRETE DURING UNUSUALLY HOT, DRY
10. ALL PIPES ABOVE 300Ø RCP TO BE RRJ CLASS 3 U.N.O. PIPES 300Ø AND BELOW TO BE UPVC U.N.O. OR WINDY CONDITIONS.
HDPE/PP MAY BE USED AS AN RCP ALTERNATIVE FOR INTERNAL AND COUNCIL STORMWATER WHERE 6. ALL CONCRETE SLABS SHALL BE STEEL TROWEL FINISHED U.N.O.
RETAINING WALL NOTES: APPROVED BY THE SUPERVISING ENGINEER AND COUNCIL WHERE REQUIRED.
7. BROOM FINISHING, WHERE SPECIFIED, SHALL BE CARRIED OUT AFTER STEEL TROWEL FINISHING.
1. RETAINING WALLS LESS THAN 1m IN HEIGHT TO BE IN ACCORDANCE WITH MANUFACTURER 11. STORMWATER PIPE CLASSES HAVE BEEN DESIGNED FOR SERVICE LOADS ONLY, THE CONTRACTOR SHALL
SPECIFICATIONS. ALL WALLS OVER 1m IN HEIGHT, SUBJECT TO LOADING OR ADJACENT EXISTING ASSESS ANTICIPATED CONSTRUCTION LOADS AND UPGRADE THE PIPE CLASSES, IF NECESSARY, IN 8. ALL CONCRETE TO BE ORDERED AND PLACED AT 8OMM SLUMP U.N.O.
STRUCTURES TO BE DESIGNED BY STRUCTURAL RPEQ AND REFERENCE IS MADE TO OTHERS. ACCORDANCE WITH AS3725, AT THE CONTRACTORS COST. 9. NO WATER TO BE ADDED ON SITE UNLESS APPROVED BY THE ENGINEER.
2. SUPPORTED MATERIAL IS TO BE NATURAL INSITU SOIL OR WELL COMPACTED FILL, CAPABLE OF STANDING 12. UNLESS DIRECTED OTHERWISE STORMWATER STRUCTURES INCLUDING HEADWALLS ARE TO HAVE TESTING
UNSUPPORTED DURING CONSTRUCTION OF THE WALL AG-PIPE DRAINAGE STUBS (WITH END CAP) TO DEWATER DRAINAGE TRENCH. 1. ALL CONCRETE TESTING IS TO BE CARRIED OUT BY A NATA REGISTERED LABORATORY, IN STRICT
3. FILL MATERIAL BEHIND WALL SHALL BE COMPACTED IN LAYERS NOT EXCEEDING 200mm DEPTH 13. THE CONTRACTOR IS TO CONSIDER CONSTRUCTION LOADING ON EXISTING AND NEW STORMWATER PIPES ACCORDANCE WITH THE REQUIREMENTS OF AS1012.
COMPACTED TO 95% MDD (AS1289) AND TO EXTEND A MINIMUM OF 2m BEYOND THE FRONT FACE OF WALL AND STRUCTURES. 2. THE FOLLOWING TESTING SCHEDULE IS TO BE ADOPTED IN ADDITION TO THE REQUIREMENTS OF THE
BEFORE BEING TRIMMED BACK ENSURING SOLID COMPACTION. MANUFACTURER'S QUALITY ASSURANCE PROGRAM:
14. ALL PIPE PENETRATIONS WILL BE NEATLY MORTARED ON THE INSIDE FACE OF MANHOLES/PITS.
4. 20mm SCREENINGS BACKFILL MATERIAL IS TO BE GRANULAR, FREE DRAINING AND IN A MEDIUM DENSE · A MINIMUM OF ONE TEST (3 CYLINDERS) TO BE TAKEN FROM EACH ELEMENT CAST ON ANY GIVEN DAY
15. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL TRENCH EXCAVATION AND CONSTRUCTION
CONDITION. (EG. COLUMNS, FOOTINGS, ETC)
IS IN ACCORDANCE WITH CURRENT CONSTRUCTION SAFETY ACT AND WORKPLACE HEALTH AND SAFETY
5. FOUNDATION TO BE CHECKED BY AN EXPERIENCED GEOTECHNICAL ENGINEER TO CONFIRM BEARING LEGISLATION. · A MINIMUM OF ONE TEST (3 CYLINDERS) TO BE TAKEN FROM EACH CONCRETE STRENGTH GRADE
CAPACITY PRIOR TO PLACEMENT OF BLINDING LAYER/FIRST LAYER OF ROCK WALL. CAST ON ANY GIVEN DAY.
16. THE CONTRACTOR IS TO TAKE ALL POSSIBLE MEASURES TO ENSURE PROPER COMPACTION TO
6. ALL ROCK TO BE SOUND AND NOT DISPOSED TO DETRIMENTAL WEATHERING. BACKFILLING OF TRENCHES AND STRUCTURES. · A MINIMUM OF ONE TEST (3 CYLINDERS) TO BE TAKEN FROM EACH 5OM³ OR PART THEREOF CAST ON
7. EROSION AND SEEPAGE SHALL BE CONTROLLED TO ELIMINATE CONCENTRATED FLOWS OVER OR 17. THE CONTRACTOR SHALL DEMONSTRATE NO DAMAGE TO EXISTING STORMWATER INFRASTRUCTURE HAS A GIVEN DAY FOR EACH STRENGTH GRADE.
THROUGH THE COMPLETED WORK. OCCURRED DURING THE CONSTRUCTION OF THESE WORKS. 3. ALL SAMPLES ARE TO BE TAKEN FROM THE AGITATOR, ON SITE. IF WATER IS ADDED ON SITE, WITH THE
8. AG DRAIN TO DISCHARGE TO CONNECT TO STORMWATER AT MAX 30m CENTRES OR DIRECTED TO LAWFUL 18. UPON COMPLETION, ALL STORMWATER DRAINAGE INFRASTRUCTURE WILL BE CLEAR OF DEBRIS AND ENGINEER'S PERMISSION, SAMPLES FOR TESTING SHALL BE TAKEN AFTER THE ADDITION OF WATER.
POINT OF DISCHARGE TO SATISFACTION OF COUNCIL ENGINEERS OTHER BLOCKAGES. THE CONTRACTOR IS TO PROVIDE A CCTV SURVEY OF ALL NEWLY CONSTRUCTED CURING
9. THE CONTRACTOR IS RESPONSIBLE FOR THE ADEQUACY OFF ALL TEMPORARY WORKS INCLUDING STORMWATER ASSETS FOR APPROVAL BY THE ENGINEER AND/OR LOCAL AUTHORITY.
Filename: C:\PROJECTS\240444 - SOCIAL HOUSING - 62 LAKE MACDONALD DRIVE, COOROY\3.0 CAD\DRAWINGS\OPW\240444-OPW-C-011.DWG
1. ALL CONCRETE IS TO BE CURED BY AN APPROVED METHOD FOR A MINIMUM OF 28 DAYS AFTER FINISHING.
PROPPING AND BRACING. WHERE NECESSARY THE CONTRACTOR SHALL ENGAGE THE SERVICES OF A 19. ALL DEFECTS IDENTIFIED BY THE CCTV SURVEY WILL BE REPAIRED TO A SATISFACTORY STANDARD BY CURING METHOD IS TO BE APPROVED BY THE ENGINEER PRIOR TO CONCRETE PLACEMENT AND SHALL
STRUCTURAL ENGINEER TO DESIGN AND CERTIFY TEMPORARY WORKS. TEMPORARY PROPPING DURING THE CONTRACTOR. PAYMENT FOR THESE REPAIRS WILL BE THE SOLE RESPONSIBILITY OF THE GENERALLY CONSIST OF ONE OR A COMBINATION OF THE FOLLOWING METHODS:
BACKFILLING PROCEDURES MAY BE REQUIRED. CONTRACTOR, UNLESS IT CAN BE DEMONSTRATED THAT THE IDENTIFIED DAMAGE WAS PRE-EXISTING AND
THE RESPONSIBILITY OF OTHER PARTIES. · CONTINUOUS WATER PONDING.
10. THIS DESIGN DOES NOT CONSIDER GLOBAL STABILITY AND IT IS THE RESPONSIBLE OF THE CONTRACTOR
TO PROVIDE STABILITY REPORT AND MEASURES AGAINST SITE SLIPPAGE. 20. RESIDENTIAL DRAINAGE CONNECTIONS TO KERB AND CHANNEL IN ACCORDANCE WITH IPWEA STD DRG · COMPLETE ENCASEMENT IN A WATERPROOF FILM (EG. POLYTHENE).
RSD-201. · APPLICATION OF AN APPROVED CURING COMPOUND.
SIGNAGE & LINEMARKING NOTES:
1. ALL LINEMARKING, SIGNAGE AND R.R.P.M's SHALL BE IN ACCORDANCE WITH AS1742 "MANUAL OF UNIFORM
TRAFFIC CONTROL DEVICES" (MUTCD).
2. ALL CARPARK LINEMARKING TO BE IN ACCORDANCE WITH THE DIMENSIONAL/SPECIFICATION
REQUIREMENTS OF AS2890. PEOPLE WITH DISABILITY (PWD) CARPARK LINEMARKING TO AS2890.6 (YELLOW
CHEVRON AND OUTLINE, YELLOW BOLLARD, BLUE SYMBOL)
3. ALL LINEMARKING ON AC PAVEMENTS SHALL BE WHITE, TYPE 1 ROAD MARKING PAINT 80-100mm WIDE
Last Plotted: 2026-04-24 9:21 AM
U.N.O, REFER MRTS45.
4. ALL LINEMARKING ON CONCRETE PAVEMENTS SHALL BE GOLDEN YELLOW COLOUR NO. Y14 AS 2700 AND
80-100mm WIDE U.N.O.
5. ALL REDUNDANT PAVEMENT MARKING SHALL BE REMOVED VIA ABRASIVE BLASTING IN ACCORDANCE WITH
THE REQUIREMENTS REFER MRTS45.
6. ALL WHEEL STOP SETOUT TO BE IN ACCORDANCE WITH AS2890.1
Last saved by: JACKHARRISON(2026-04-16)
7. ALL SIGN INSTALLATION & LOCATION TO BE IN ACCORDANCE WITH IPWEA STD DRG RSD-701 & 702.
8. ALL SIGNS TO BE REFLECTORISED AND CLASS 1 TO AS1743 U.N.O
9. SIGNS ARE TO BE INSTALLED WITH THE FOLLOWING CLEARANCES TO EDGE SIGN:
· NO KERB = 600mm BEHIND GUIDE POSTS
· BARRIER KERB = 300mm FROM FACE OF KERB
· MOUNTABLE KERB = 500mm FROM FACE OF KERB
10. A FLEXIBLE STRIKER BAR SHALL BE PROVIDED IN CONJUNCTION WITH SIGNAGE WHERE CLEARANCE LESS
THAN 2.3m OCCURS.
North Point Scale Horiz. Datum Client Consultant Project Drawing
LOCAL Drawn JH Project No. Drawing No. Rev No.
COAST2BAY SOCIAL HOUSING GENERAL NOTES & DETAILS
Design JH
HOUSING GROUP OPERATIONAL WORKS - CIVIL
C MINOR UPDATE TO SET 24.04.26 LS
Vert. Datum
AHD
62 LAKE MCDONALD DRIVE, Check LS
240444 OPW-C-011 C
B FOR TENDER 16.04.26 LS RL Datum CIVIL | STRUCTURAL | GEOTECHNICAL COOROY, QLD, 4563 Approved Approved Date Signed Sheet
A FOR APPROVAL
Rev Revision Description
09.04.26 LS
Date Approved
COPYRIGHT © All rights reserved.
This work is copyright and cannot be reproduced
or copied in any form without the prior consent
SUNSHINE COAST | BRISBANE | GOLD COAST
www.arcosgroup.com.au | ABN 51 640 311 842
LACHLAN SWANN
RPEQ 21223
16.04.26 Status FOR TENDER
Size A1
Section 17
EXISTING PVC-U WATER MAIN EXISTING LEGEND
ASSET ID 2028984 EXISTING PVC-U SEWER GRAVITY MAIN SUBJECT PROPERTY BOUNDARY
ASSET ID 2539028
US IL 98.64 4.00 MAJOR CONTOUR
DS IL 98.47 MINOR CONTOUR
SEWER MAIN
WATER MAIN
EXISTING IRON, DUCTILE WATER MAIN U/G TELECOMMS
ASSET ID 2028981 O/H ELECTRICITY
EXISTING AC WATER MAIN STORMWATER
ASSET ID 5017929 FENCE
EXISTING GUILLY PIT TO BE REMOVED
103 103
ALD DRIVE EXISTING
ACDO10N
EXISTING GUILLY PIT
TRANSFORMER
LAKE M
3
DIANELLA CIRCUIT
EXISTING CONCRETE NOTES:
PATH
1. FOR GENERAL NOTES REFER DRG C-011.
103 DEMOLITION
DEMOLISH OR RELOCATE OFF SITE ALL EXISTING BUILDINGS
AND/OR STRUCTURES ON SITE AND DISCONNECT AND
104 EXISTING BIO BASIN WHERE REQUIRED CAP ALL ASSOCIATED SERVICES IN
10
ACCORDANCE WITH A PLUMBING AND DRAINAGE
4
104 APPLICATION PRIOR TO DEMOLITION COMMENCING.
EXISTING
106 STORMWATER PIT
5
10
CLEARING
THE CONTRACTOR SHALL REMOVE ALL EXISTING
10
VEGETATION WITHIN THE SITE IN ACCORDANCE WITH
6
EXISTING PVC-U SEWER GRAVITY MAIN THE APPROVED TREE RETENTION PLAN IF SPECIFIED.
EXISTING TREES TO ASSET ID 2539029
EXISTING SWALE 105 BE REMOVED US IL 98.90
DS IL 98.65
3
10
107 106
108
EXISTING PVC-U SEWER GRAVITY MAIN
104 ASSET ID 2539047
US IL 101.88
DS IL 101.02
EXISTING STORMWATER PIT
109 SL 104.52
108
107
IL 103.15
10
2
5
SP348613
EXISTING SEWER STUB
IL 102.40
10
4
10 105
6
EXISTING SEWER MANHOLE
10
109 8 SL 104.73
IL 102.16
111
EXISTING PVC-U SEWER GRAVITY MAIN
106 ASSET ID 2539048
US IL 105.43
110
DS IL 101.98
10
7
11
112
1
10
9
113
107
Filename: C:\PROJECTS\240444 - SOCIAL HOUSING - 62 LAKE MACDONALD DRIVE, COOROY\3.0 CAD\DRAWINGS\OPW\240444-OPW-C-101.DWG
EXISTING CROSSOVER TO BE
10
REMOVED AND RECONSTRUCTED 28
8
IN ADEQUATE LOCATION
SP176968
11
1
11
2
114
11
0
EXISTING SEWER PIPE
US IL 111.63
Last Plotted: 2026-04-24 9:21 AM
114
DS IL 106.06
108
11
5
ACCESS RESERVE
Last saved by: JACKHARRISON(2026-04-16)
11
3
11
6
109
North Point Scale Horiz. Datum Client Consultant Project Drawing
LOCAL Drawn JH Project No. Drawing No. Rev No.
COAST2BAY SOCIAL HOUSING EXISTING FEATURES
Design JH
HOUSING GROUP OPERATIONAL WORKS - CIVIL PLAN
C MINOR UPDATE TO SET 24.04.26 LS
0m
A1 1:200
5 10
Vert. Datum
AHD
62 LAKE MCDONALD DRIVE, Check LS
240444 OPW-C-101 C
B FOR TENDER 16.04.26 LS RL Datum CIVIL | STRUCTURAL | GEOTECHNICAL COOROY, QLD, 4563 Approved Approved Date Signed Sheet
A FOR APPROVAL
Rev Revision Description
09.04.26 LS
Date Approved
COPYRIGHT © All rights reserved.
This work is copyright and cannot be reproduced
or copied in any form without the prior consent
SUNSHINE COAST | BRISBANE | GOLD COAST
www.arcosgroup.com.au | ABN 51 640 311 842
LACHLAN SWANN
RPEQ 21223
16.04.26 Status FOR TENDER
Size A1
Section 18
103 EXISTING LEGEND
104 SUBJECT PROPERTY BOUNDARY
4.00 MAJOR CONTOUR
TW 103.80
104 MINOR CONTOUR
BW 103.68
10
SEWER MAIN
4
WATER MAIN
104
STORMWATER
104
10
104
4
TW 104.60
105
5
BW 104.01
10
TW 104.76
TW 105.80 BW 104.36
BW 105.26 TW 104.60
TW 105.85 BW 104.39
BW 105.61
10
TW 105.80
6
BW 104.85
EX IL 108.81 TW 105.80 105
BW 104.80
TW 105.85 PROPOSED LEGEND
3
BW 105.35
10
50.00 MAJOR CONTOUR 1.0m INTERVAL
MINOR CONTOUR 0.25m INTERVAL
TW 105.80 RETAINING WALL - CONCRETE SLEEPER
BW 105.42 TW 105.40
BW 104.13 RETAINING WALL - GROUTED ROCK
RETAINING WALL - BLOCK
RETAINING WALL - LANDSCAPE
107 106
CUT 0 - 0.5m
C
CUT 0.5 - 1.0m
212
PROPOSED DWELLINGS TW 105.80 TW 105.44
FFL 105.95m BW 105.42 BW 104.53 CUT 1.0 - 1.5m
PUMP ROOM 104
BEL 105.75m
FFL 105.78m
BEL 105.58m CUT 1.5 - 2.0m
CUT 2.0 - 2.5m
TW 108.77 CUT 2.5 - 3.0m
BW 105.77 BH01
CUT 3.0 - 3.5m
108
107
10
2
5
CUT 3.5 - 4.0m
SP348613
CUT 4.0 - 4.5m
TW 108.77 CUT 4.5 - 5.0m
BW 105.97 BH02
TW 109.04
10
FILL 0 - 0.5m
5
BW 108.85
10 FILL 0.5 - 1.0m
6
EX IL 110.48
FILL 1.0 - 1.5m
10
8
109
FILL 1.5 - 2.0m
FILL 2.0 - 2.5m
FILL 2.5 - 3.0m
PROPOSED CARPARK
FFL 105.73m
BEL 105.46m
EARTHWORKS QUANTITIES
TW 110.68 TOP SOIL STRIP: 474m3
TW 109.80 106 EARTHWORKS CUT: -4388m3
BW 109.95
BW 108.85 EARTHWORKS FILL: 528m3
110 BALANCE: -3,860m3
NOTES:
10
7
1. ALL VOLUMES INDICATED ARE SOLID VOLUMES.
TW 107.20 2. ASSUMED TOP SOIL STRIP 150mm THICK.
BW 105.67 3. EARTHWORKS QUANTITIES BASED ON COMPARISON BETWEEN
11
D SUBGRADE SURFACE AND STRIPPED SURVEY SURFACE.
1
212
10
Filename: C:\PROJECTS\240444 - SOCIAL HOUSING - 62 LAKE MACDONALD DRIVE, COOROY\3.0 CAD\DRAWINGS\OPW\240444-OPW-C-200.DWG
NOTES:
9
BH03 PROPOSED DWELLINGS
FFL 108.95m 1. FOR GENERAL & EARTHWORKS NOTES REFER DRG C-011.
TW 108.95 TW 108.95
BEL 108.75m 2. FOR EROSION & SEDIMENT CONTROL NOTES & DETAILS REFER DRG C-231.
BW 105.97 BW 105.72 3. RETAINING WALLS TO BE DESIGNED BY OTHERS/STRUCTURAL ENGINEER.
TW 109.80
BW 108.85
107
107
10
TW 112.52
8
BW 109.95 TW 109.80
TW 109.80
BW 108.85
BW 108.85
Last Plotted: 2026-04-24 9:22 AM
ACCESS RAMP TO HAVE
WALLS BUILT IN WITH FORM
11
1
EX IL 112.47 11
2
Last saved by: JACKHARRISON(2026-04-24)
111
110
109
108
113 TW 112.78
A
BW 109.94 TW 109.99 B
211 BW 109.95
211
11
0
North Point Scale Horiz. Datum Client Consultant Project Drawing
LOCAL Drawn JH Project No. Drawing No. Rev No.
COAST2BAY SOCIAL HOUSING EARTHWORKS
Design JH
HOUSING GROUP OPERATIONAL WORKS - CIVIL PLAN
C MINOR UPDATE TO SET 24.04.26 LS
0m
A1 1:125
3.125 6.25
Vert. Datum
AHD
62 LAKE MCDONALD DRIVE, Check LS
240444 OPW-C-201 C
B FOR TENDER 16.04.26 LS RL Datum CIVIL | STRUCTURAL | GEOTECHNICAL COOROY, QLD, 4563 Approved Approved Date Signed Sheet
A FOR APPROVAL
Rev Revision Description
09.04.26 LS
Date Approved
COPYRIGHT © All rights reserved.
This work is copyright and cannot be reproduced
or copied in any form without the prior consent
SUNSHINE COAST | BRISBANE | GOLD COAST
www.arcosgroup.com.au | ABN 51 640 311 842
LACHLAN SWANN
RPEQ 21223
16.04.26 Status FOR TENDER