FIGURE 2: DEVELOPMENT LAYOUT PLAN (SOURCE: ARCOS GROUP)
3.0 Site Access
The site shall be accessed via a new crossover to the new (currently not yet constructed) subdivision
road along the eastern boundary, which shall be built as part OPW/25/0057. The new crossover will be
a ‘General Wide’ arrangement built to Council and IPWEA standards, and can be seen in the concept
civil engineering drawings (refer Appendix A).
3.1 Sight Distances
There are no permanent sight obstructions for vehicles exiting the driveway, nor to the new subdivision
road intersection with existing Dianella Court (to the northeast of the site). Therefore, no sight distance
issues are present.
3.2 Parking
In line with Council’s planning scheme (Table 9.4.1.4) the development proposes to provide the
following mix of resident car parking spaces:
• 25 Covered Spaces
• 6 Vistor Spaces, of which 2 are designated as PWD
• 31 Total Car Parking Spaces
All car parking is to comply with NSC’s Driveway and Parking Code, PSP6 Engineering Design
Standards, and AS2890. Moreover, swepth path diagrams have been completed to demonstrate
adequate access, door clearances, and turnaround space for car parks.
12 May 2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Stormwater Management Plan 12_05_26.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.