Decision Notice Minor Change - 51987.3004.01 [As Published]
33. The applicant shall acknowledge in his construction techniques the existing 9 tonne load limit
applied to Park Road. This may only be varied by specific approval of the Shire Engineer.
34. The Developer shall comply with all directions given by the Shire Engineer concerning traffic
control matters and avoidance of traffic problems.
35. Council is to be indemnified, prior to the commencement of works, against any claims for
compensation from owners of properties above the subject site, in relation to any damages
the may occur to these properties, as a result of the works proposed.
36. The applicant’s geotechnical engineers shall submit to council prior to commencement of
works, a report to demonstrate the security of private properties located on the hillside above
the subject site against the slope failure within the subject property and, if necessary, design
appropriate stabilising measures. Security should be examined in respect of a slip occurring
on a 3 metres below the steep face and extending linearally to intersect the ground surface
above the steep face. The report shall also address the contingency plans that shall be
adopted in the event of a major sand slip occurring within the subject property.
Additional conditions – 7 March 2023
Retaining wall and stair replacement (21/02/2023)
Approved Plans and Report
37. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below.
Plan No. Rev. Plan/Document Name Date
01 A Landscape Plan by Arbor Active Jan 2023
01 A Landscape Plan by Arbor Active Jan 2023
22146697 Version 1 Tree Management Report by Arbor Active 14/09/2022
A001 1 Site Plan, prepared by Kings Lane Architects 28.07.2022
A100 1 Proposed Floor Plan, prepared by Kings Lane Architects 28.07.2022
A500 1 Construction Details, prepared by Kings Lane Architects 28.07.2022
A800 1 Fittings & Finishes, prepared by Kings Lane Architects 28.07.2022
Landscaping Works
38. The development site must be landscaped. All works must be constructed and work
procedure undertaken, in accordance with:
a. The approved plans/documents and conditions detailed in Condition 37 of this Decision
Notice.
b. All relevant Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines.
39. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
40. Landscape works must be supervised, undertaken and certified by qualified persons*. All
works must be completed in accordance with this Decision Notice.
(* Refer to Advisory Note)
Page 5 of 9
Document Set ID: 22338187
Version: 4, Version Date: 13/03/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice Minor Change - 51987.3004.01 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 208 KB (small file)
- File type
No other editions are linked here.