Skip to the record
Every meeting, every word.

Council archive · source document

08/0425 - Op Works - Landscaping [As Published] · 142008.425

of 17

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

         
   
    
  

(Cashier: Pleas@@@Metum to Admin Officer, Development)

 

 

DEVELOPMENT FEES & CONTRIBUTIONS |
t
|
\

 

Road / Drainage Field Inspection
Legal Document Examination
Sealing Fee - Survey Plans, Legat Documents
Sale of Documents, Policy Lists, Misc

Bonding Admin Fee (Contributions, uncompleted works)
Closed Circuit TV Inspection

Pre-lodgement Meeting Fee

(CONTRIBUTIONS 8050 PE SES See

 

 

 

CALCULATIONS:
Lot Calculation

 

 

 

 
 

Plan Examination Calculation.

  
   
   
  
   
  
     
    

Developer Contribution - Landscaping

Developer Contribution - Road Other than PSP [| |
Developer Contribution - Drainage Other than PSP | tsiS@Y . {

Developer Contribution ~-Pathway Other than PSP
Developer Contrib. — tn Lieu Off St Parking (PSP13 Car parking)

[Developer Contibon = Oher Pars and Communty |_|
[icS= ConmuniyLand Wotcurentyacivey
fies PubieTranspot CY
[ToS= Sewerage PSPRua) SSCS
Ld

) -

 

 

 

ICS - Sewerage (PSP Coastal)
ICS - Sewerage - South Peregian (PSP Maroochy)

ICS - Water Supply (PSP) :

   
      

|___ 661 APPLICATION DETAILS G28 tht ES zs
4 Payee Name: O + L. OcUELPMODTS PN LTO
Address! cpne bts picceS +~ASSoc.

Po Box 6380
MALOOCuYgate CLO LSSK

Development Location: 2C Eadie cake e@e9
Noose we
|RECEIPT:TYPE | File Numbers or Reference:

51 (Cat 9) lly. 200%. 0425.)
Total of Fees Paid (Including Bonds) $- Date application properly made: “7/3 /0%

Receipt No: Hob / Receipt Date: 11/3 oS

 
 

 

‘ICS — Sport and Recreation Land (PSP Parks)

 

 

 

 

 

    
    
    

 

  

P:Land DevelopmentFEES & CONTRIBUTIONS/DEVELOPMENT FEES.doc

 
Full text of the other 16 pages

Page 2

 

ht

ken hicks

AND ASSOCIATES

4 March 2008
Our Ref: 060253T

The Chief Executive Officer
Noosa Council

PO Box 141

TEWANTIN QLD 4556

ATTENTION: Land Development

Dear Sir
LODGEMENT OF DEVELOPMENT APPLICATION
DEVELOPMENT APPLICATION FOR OPERATIONAL WORKS - LANDSCAPING

26 EENIE CREEK ROAD NOOSAVILLE
LOT 1 ON SP182880

Please find enclosed a development application for Operational Works — Landscaping subsequent to Lot
Reconfiguration approval 2006/1594 in respect to land described as Lot 1 on SP182880.

In support of the application, please find attached the following:
e IDAS Form 1 Parts A & E and Assessment Checklist;

e Four copies of Landscape Plans by Landgraphics; and
e Cheque for application fee of $600.

Should Council have any questions with respect to the above, please do not hesitate to contact me
direct.

Yours faithfully
KEN HICKS & ASSOCIATES

 

Scott Sobey
DIRECTOR

07 MAR 2008

a4
as \ Stine CuUNCIL

 

 

TOWN PLANNERS | CONSULTING SURVEYORS | URBAN DESIGNERS | PROJECT MANAGERS
Ken Hicks & Associates Pty Ltd | [email protected] | A.C.N. 010 278 823 | A.B.N. 74 308 405 611

Suite 7 Dalton Centre, 1 Newspaper Place 18/42 King Street 61-73 Sturt Street
PO Box 6380, MAROOCHYDORE BC, Qid 4558 PO Box 1712, CABOOLTURE, Qld 4510 PO Box 5027, TOWNSVILLE, Qid 4810
P 0754432844 =F 0754437146 P 0754595318 F 0754955317 P 0747213066 = F 07 47213088

Page 3

Part A; Version 3.1-3 March-2008

   
  

INTEGRATED PLANNING ACT 1997

 

Form 1 Development Application

Part A

Common details

OTE: Answer all questions unless directed to go to a particular question. Refer to the end of the form for advice on how to complete this form.

 

‘Applicant details (The Applicant is the person responsible for making the application and need not be the owner of the land. The Applicant is responsible for ensuring the
jinformation provided on the IDAS Application Form is correct. This information is refed upon by the Assessment Manager and any referral agencies when assessing and
Ideciding this application, By lodging this application, the Applicant incurs the obligations and responsibilities prescribed by the IPA, Any development permit or preliminary

id

 

 

 

 

 

Cornpany/organisation name (if applicable) ls & L Developments Pty Ltd A.C.N. 089 625 347

 

(Individual applicant/Contact person (if there is more than one applicant, provide additional applicant details on an attachment to this form)

Postal address Ice Ken Hicks & Associates, PO Box 6380, MAROOCHYDORE BC QLD 4558

 

 

 

 

 

Contact telephone number —|(07) 5443 2844 Mobile phone number 0400 775 835

Facsimile number (07) 5443 7146 e-mail address [email protected]

 

 

 

 

 

 

Details of the premises . the fend on which the development is proposed - refer to the advice at the end of the form) ]
1. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given to identify the premises)
Table A If the application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then go to Q2.

 

[ : ___ Name of each local govemment area in which the mobile and temporary ERA is proposed to operate

[1
OR
Table B Street address for the premises (tick applicable box/es below and insert property description in the table. Identify each lot in a separate row.)

 

 

 

 

(i) (CJ Street address / lot on plan for the premises (Appropriate for most applications including building applications); OF

(i) &) Street address /lot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water e.g. jaty,
pontoon etc) (Note: Loton plan details may be obtained from title documents, a ‘Rate’ notice, or from the local government.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

_ = Street Address Lot on pe ee Local government area (ep. Logan 7
No. | No. Street Name and official suburtVocality name | Post Coda | Lot No. Plan Number | Caims)
| 4 26 Eenie Creek Road, Noosaville 4566 1 SP182880 Noosaville
AND/ OR
TableC Coordinates and/or a map of the premises (Appropriate for development in remote areas, over part of a lot, in water (e.g. channel dredging in Moreton
Bay) etc.)
- inne > - — —-
(Note: place each set of coordinates in a separate row) Zone Datum Local government area
Easting Northing Latitude | Longitude | Reference } {if applicable)
1 (1 pepass
C weses
( Otter -

 

 

 

 

 

 

 

 

 

 

2. _ Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the following characteristics, however some applications may involve one of more of these characteristics - complete only if epplicable)

Page 4

INTEGRATED PLANNING ACT 1997 Part’A; Version:3:173 March 2008
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, lake, cana)
ar. Name of water body, watercourse or aquifer (if known)
[i

Table E Complete if the : premises are on Strategic Port Land under the Transport infrastructure Act 1994
“Lotony plan descr tion for strategic portfand i Port Authority for the fot |
[1

Table F Complete if the premises are in tidal water

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

| ~ Name of local government for the fidal area (if applicable) - E Name of port authority for the tidal area (if appicabie) |
[1
3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may include land both above and below water)
| ~~ Total area of premises ____._|
21.64 ()m? [XJ hectares (Tick applicable unit)
Existing use of the premises} i ]

 

4. — Current use/s of the premises: (6.9. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)

 

| 1 | Child Care Centre & Training Centre

 

5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc.}?
O No Yes - Ensure the type, focation and dimensions of each easement are included in plans, submitted with the application

[Proposal details Sy —_S. ]
6. _ Brief description of the proposal (e.g. 6 unit apartment building, 30 fot residential subdivision, a bore, aquaculture)

 

 

Operational! Works - landscaping associated with lot reconfiguration

 

 

 

7. Does the poposal include new buildings or operational work (including any services) on the premises?
Oo No Xl Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application

 

[Resource entitlement (if appicabie} _- further information is provided in the advice secton at the end of the form

 

8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land {leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)

XK No - Goto Q9 oO Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
allocation or entitlement must be submitted with the application. You do not need to answer Q9 - go fo the next section.

 

(Owner's consent (iepptcable) _. futher information is provided in the advice section at the end of the form }

9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner on a separate row, or on an attachment to this form if applicable.

 

 

 

 

 

 

= . ——— pe
Premises Owner's name/s Details of the premises owned Date consent
Table H and postal Address (street adress or fot onptan description) prpet senate" | was obtained
S & L Developments Pty Ltd
1 A.C.N. 089 625 347 Lot 1 on SP182880 04/03/2008
Scott Juniper
S$ & L Developments Pty Ltd
2 A.C.N. 089 625 347 Lot 1 on SP182880 ¥ 04/03/2008
Lee Meiklejohn

 

 

 

 

 

 

 

 

 

* Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be pt Kawa to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, $127 of the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the [PA website .

Page 5

Part A, Version 3:1, 3 Maret 2008

INTEGRATED PLANNING ACT 1997

{Attachments and supporting information (Complete Table ! - Usa a separate row for each type of attachment or information, including information required
{lndor this Part) Please ensure all documentation submitted wit this form, inctuding other Perts of Farm 1, ar owners consent, etc, are securely attached to this Pert ofthe Form.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Description of attachment or information - | = tie (i , Y Method of delivery to
eppicable) jethod of delivery
Table | fog Pat CofForn 1, ee eee (ag. Generel Authority, James StrostTrafic Report Date assessment manager
[1 Part E of Form 4 Operational work and/or building | 04-Mar-2008 | over the counter
work
[Portable Long Service Leave (PLSL) levy (Appicable for certain building and construction work valued over $80,000 only) |

 

10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: ( Tick box if applicable)

(J the application seeks a preliminary approval only;

(J the application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of

regrowth, thinning vegetation or controlling weeds or pests);
(D all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or

C1 the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 -
Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number stated). The receipted form must be
@ Sighted by the assessment manager before a development permit can be given.

11. Is payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)?

[1 No - EndofParta
BX) Yes - Answer Q12 below

12. Has the PLSL levy been paid?

® No - (NOTE: An application can be lodged prior to payment of the applicable PLSL levy. However, the levy must be paid and the receipted form sighted by
the Assessment Manager before a development permit may be given for this application. To pay the levy you will need to complete and submit a

Notification and Payment Form to QLeave.)
oO Yes - Complete Table J and submit, with the application, the ‘yellow’ (Local Government's (Council) / Private Certifier's) copy of the receipted QLeave Form

OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A Receiving officer's Reference
Fee ($) Date received name numbers
1 NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER’ |
To: Council. }have been engaged as the private certifier for the building work referred to in this application.
ima TT ee _ ae an ENE EE
engag ment __ Name BSA Certification number Building classifications _

 

 

 

 

 

 

QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)

 

 

= Dats receipied =
Description of the work QLeave Project Number |Amount paid ($)| Date paid | f™ Sehted by Nae oir wos
manager _
1

 

 

 

 

 

 

 

Privacy Statement
The information collected on Form 1 will be used by the Department of infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.

Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Freedom of information Act 1992} or as
required by Parliament. This information may be stored in a DIP database. The information collected will be relained as required by the Public Records Act 2002.

 

 

 

 

Advice for completing Part A

Page 6

     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

,?
INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008
wm wa NS 5 :
Building &/or operational works assessable
i against a planning scheme
Nature of the works
1, Nature of work that requires assessment against a planning scheme:
(J) Building work - Complete Table A [X] Operational work - Complete Table B
Table B
(i) Whatis the nature of the operational work?
e@ L) Roadworks (] Stormwater [_] Water infrastructure [_] Sewerage infrastructure
[X} Landscaping DD Earthworks ] Drainage Works LJ Signage
(1) Clearing vegetation under the planning scheme [_] Other - Specify below
(ii) What type of approval is being sought? (NOTE: if you have indicated muttiple operational works in question (i) above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)
Development Permit (] Preliminary approval L] Both (Specify betow)
(ii) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
(1) No X] Yes - Specify the number of lots being created
5
(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)
()No  &X] Yes - Complete Table B(a)
Table B(a) Bev SHG: Ust of approval references £:") * Date approved |“, Date approval tapses (if known) {=
@ 1 Reconfiguration of a Lot 2006/1594 28-Nov-2007
2. Whatis the dollar value of this operational work? (ie. the total value including GST, materials and labour) | $ unkown - --

 

 

   

 

 

 

 

. Confirmation of .
© Yodgément

 

 

Plans, andspecifications if applicable, showing the nature and location of the proposed works (including the

 

 

 

 

 

 

 

 

 

extent of any cut and fill) Confirmed anes
OFFICE USE ONLY
Date Received Reference Numbers

 

 

 

Page 7

x
INTEGRATED PLANNING ACT 1097 IDAS Assessment Checklist, Version 21.1, 3 March 2008

ane 1 Nee ial Sole Corie

IDAS-

Assessment Checklist

a”
sed on fand ina in ant urban development ; area or for bui ing, work
ee

 

 

Answering the following questions will assist you in determining which sections of the checklist must be completed for your application.

 

For all IDAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section # of this
checklist

Does the application seek approval to materially change use of the premises? Ces |No
ifyes - complete Section 2 of this checklist

 

 

Does the application seek approval to reconfigure a lot? Ces |52No
ifyes - complete Section 3 of this checklist and Part F of DAS Application Form 1. Assessment is by the focal government.

Does the application seek approval to carry out operational work?
if yas - complete Section 4 of this checklist BdYes |LNo

 

 

Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994?

(Yes |KJNo
@ if yes - complete Section 5 of this checklist

 

Have you received a referral agency response under section 3.3.2.of the IPA, in relation to this development application?
if yes - complete Section 6 of this checklist. OYes |XNo

 

Does the application seek approval to carry out building work requiring assessment against a local government planning

scheme? + OCYes |KJNo
if yes - complete Part E of IDAS Application Form 1. Assessment i is by the local government.

Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?

If yes - go to Appendix 4 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1. ClYes |EXNo
Assessment is by a building certifier

SECTION 1 &

[HERITAGE :

 

 

 

 

 

 

 

 

 

1.4 ls any part of the proposal intended to be carried out on a registered place under the Queensland Heritage Act 1992?
[X] No-cotoor.2 [[] Yes

IPA, schedule 8, part 1, table 8. item 2: IP Regulation, schedule 2, table 2, tem 18; IPA, section 1.3.8 (Definitions for torms used in development}

 

[REMOVING QUARRY MATERIAL; WILD RIVER AREA

 

1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
No-Goioa13 [[] Yes

Page 8

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008

IPA, schettuie &. part 1, table 5. item 1: 1P Regulation, schedule 2, table 2, tent: 1B Peaulation-sapedtie +-tabie-6- item
SeatIONT SECT Wile Rivers Act 2808, section 434

  
 
 
  

 

 

‘ENVIRONMENTALLY RELEVANT ACTIVITY: WILD RIVER ARE

13 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?

RX] No-Gotoors (] Yes
iPA,

 

735A

 
  

 

 

 

AVITHIN THE LIMITS OFA PORT ui Si i ge
1.4 Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
DX] No - Goto. 01.5
L] Yes
IP Regulation, schedule 2, lable 2, items 16 and 16

 

IDECLARED FISH HABITAT AREA ©: ssa

15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
[X] No - Gotoars

(Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.

IP Regulation, schedule 2. table 2, item 26
‘COMMUNITY INFRASTRUCTURE sari Gea
16 Is any part of the premises designated for community infrastructure?
DX] No - Gotoan.7

CI Yes

IP Raguiation. schedule 2. table 3, item 7

 

an

WASTE WATER MANAGEMENT isd: ~ cxtfr Gai hss

 

17 Does the proposal involve the establishment or expansion of a waste water disposal system?
EX] No -éndof section? [[] Yes

!P Reguiation, schedule 2. table 3. item §

 

 

41 ls any of the proposed operational work assessable under a planning scheme?
O No - Go to Q4.2 & Yes - (Complete Form 1, Part E) Answer Qs4.1.1 - 4.1.7 below.

 

4.1.1 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?

&] No
macs
If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?
X] No - Goto.04.1.2
oO Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
IP Regulation, schedule 2, table 3, tem 3; IP Regulation. schedule 2, table 3, item 1(}

 
  

 

 

 
 

id-river areal Water ACT 2006,

Page 9

Xs
~
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008

 

4.1.2 Is any of the operational work proposed in a local government area listed*.' in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils

J No -Goto041.3 Yes

41 urukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vate, Momington, Noosa, Pine Rivers,
Redeliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday

|

If yes, is the natural ground level of any point where work is being carried out less than 20m AHD?

[J No

—X] Yes
If yes, does the proposed operational work involve the following?
{i) Excavating more than 1,000m? of soil or sediment at or below 5m AHD EX] No O Yes
(ii) Filling the premises with 1,000m: or more of material with an average depth of No 0 Yes

0.5m on land, soil or sediment at or below 5m AHD

If yes to either or both (i) or (ii) above - This application must to be referred to the Department of Natural Resources and Water (NRW)
as Advice Agency

   

e IP Reguiation, schedule 2. table 3, tem 4; State Plan

EASEMENTS AND SUBSTATIONS ==

1g Policy 292: Planning and Mar

      

4.4.3 Is any of the proposed operational work for filling or excavation?
RR] No -Gotoa4.14
L] Yes

IP Reguiaiion, schedule 2. table 3 itent 10fai: IP Requiation, schedule 2, fable 2 item 10683

4.1.4 s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?

[DJ No -Gotoo415 [7] Yes
IP Regulation, sshedule 2, iable 3. fem 17
[PUBLIC PASSENGER TRANSPORT...

4.1.5 Is any of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?

DX] No- Goto 04.1.6 (] Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
e@ IP Regulation, schedule 2, table 3, ten: 14

 

 

 

 

 

IRAILWAY § SAFETY AND EFFICIENCY - .
4.1.6 Is any of the proposed operational work listed in schedule 130 of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?

DX] No- Go to. 04.1.7 (7 Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
“iP Regulation, schedive 2, table 2. item 15

 

KOALA CONSERVATION

 

4.1.7 Is any part of the premises in a koala conservation area or koala sustainability area?
No -Gotoa42 ((] Yes

IP Regulation, scheduig 2, table 3. item 19

 

 

[code tothat: we of ne

Page 10

245
INTEGRATED PLANNING ACT 1997
ASSOCIATED WITH RECONE

 
   
    

 

 

“ sie ut . na 2A ca

42 \s any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
LJ No -Gotoo43 Yes

 

 

If yes, is any part of the premises in a wild river area declared under the Wild Rivers Act 2005?

X No - (Complete Form 1, Part E) The operational work associated with reconfiguring is assessed by the local government.
L] Yes

IPA, schedule 8, part 1, table 4, item 2; IP Regulation, schedule 1, par @. table 5, tem tfc}
Wild Rivers code (Note; the cad does not currently contain applicable provisions for residential, indugtiel or cominercial development inside a designated urban
area)

    

VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA.

     

 

me

43 Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?

No -Gotog44 [_] Yes
IPA, schedule @ part 1, table 4, tems 14-1G; IP Regulation, schedule 2. table 2. item 5 (vegetation clearing); IP Regulation, schedule 2, table 2, item 24 (koala

conservation): [P Regulation, schedule 1, part 3, table 4. ilem (vegetation clearing/wild river area}: Vegetation Mana ction 224 {vegetation
clearingéwid river area); Wild Rivars Act 2005. sections 31F and 434

e@ iTAKING OR INTERFERING WITH WATER; WILD RIVER AREA . *

 

 
 

      

 

  

   

44 |s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake orspring (other than using a water truck to pump water; and other than under the
Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
&X] No -Gotoass [] Yes - Answer (a) and (b) below
eheadule 1. pant 3, tal Baril IA: We
45

|s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?

X No Goto 04.6 oO Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW). if NRWis not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA, schedule 8, part 1, table 4, item 3/b); 1 Regulation. schedule 2, table 2, tein 8; IP Regutatior hedule 1, p

Witd Rivers code (Note: the code dees not currently contain applicable provisions for taking or ink ng with ¢

 
 

le 4, item 3

")

  
   

  
   

   

   
  
 

   

   

     

   

46 |s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
XJ No -Gotoas7 [[] Yes - Answer (a) and (b) below
@ fi is ij Ia 2, tahilo 3 tabi fon QEGA (wikd river
Wild
47 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
BJ No -Gotoozs [7] Yes . -
~ IPA! schedule &. part 1, i fii} IP Regulation, schedule 2 tio
Water 000. section 966A {wild river area}(Nofe: no current Wild Bi
Wild River code (Nate: the cae dogs not currently contain applicable pr
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck fo pump water)?
EX] No -Gotoo49 [-] Yes - Answer both (a) and (b) below
Ip H HAG ie 2 lable 2 Sin GA, Water Act 200), cee
FIVEE te
49 Is the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Act 2000 [J No O Yes
(li) To increase the storage capacity of a referable dam by more than 10% No CO) Yes

if yes to either or both (i) or (ii) above - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and

Water (NRW), If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.

IPA, schedule 8, part 1, table 4, tem 4: IP Reguiation, schedule 2, table 2, item 10

Page 11

    
  

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008

TIDAL WORK; WILD RIVER-ARE
4.10 Is any of the proposed operational work tidal work, other than excluded work defined under the IPA?

DX] No -Gotoa411 [[] Yes - Answer (a) and (b) below

rs schedule 8, part 1, table 4. item 5; iP Regulation. schedule 2. table 2. items 12. 14 and 17; IP Regulation. schedule 1, part 3, lable 4, lems 4A and $
Coastal Protection and Management Act 1995, section 184A (wild river area}

      

 

‘COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA,

 

4.11 Is any of the operational work proposed to be carried out within a coastal management district?
[DX] No -Gotooa12 [] Yes

IPA, schedule 8, part 1, table 4. iteni 5; iP Regulation, schedule 2, table 2, items 12 and 14; IP Regulation,
Coastal Protection and Management Act 1995 Act 1995, section 104A (wild river areal: Wild Rivers Act 2005.

WATERWAY BARRIER WORKS: WILD RIVER AREA”

 

hedule 7, oart 3, table 4, tems 4A and &
ction 43a

    

 

412 Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
KX) No -Gotoas13 [] Yes

IPA, schedulo & part t, lable
Regulation, s: ¢

     

2. 1P

 

 

4.13 Is any of the operational w work proposed t to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?

BX] No - Goto 04.14

(1 Yes

IPA, schedule #. part 1, table 4. item 7: IPA
Hegulation, soheduls 1, pari 3, labie 4. ite

 

edule 8. part 2, talile 4. i
Pivers Act 2005. sealions

 
 

fi 1995s

  
 

cole}, IP Reguistion, schedule & lable 2, iteni 25; 1

 

 

|REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER:AREA * 8c

 

4.14 Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
DX] No -Gotoas15 [7] Yes

IPA, schedtel 4. table 4. item & PPA
Reguialion, st

      
     

Paguiation 1995 st 130 £
xn teaj: Wid Rivers Act

  

 

WILD RIVER AREA i)...

4.15 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
No -Gotoa416 [[] Yes

IPA, schedule 8 part 1, table 4. item 10; iP Regulation. schedule 2, table 2, item 37; Wild Rivers Acl 2065, sectiv

   

3A

 

ISTATE-CONTROLLED ROAD

  

4.16 \s any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
IX] No -Endofsection¢ [—] Yes

iP Regulation. schedule 2. table 2, item 2 - ~

 

Disclaimer:

While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable legislation to your circumstances.

To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or
omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your
teliance on this process and the information contained on this form.

 

 

 

Page 12

 

 

ADJOINING
RETAIL
DEVELOPMENT

 

 
  

Landscape Specification

Proposed & Lot Reconfiguration, Eenie Creek Road, Noosaville

From the office of Landgraphics Landscape Architects - Maroochydore for
S&L Developments:

EXTENT OF WORKS
Contractor should take full account of documentation of Civil Engineering, Hydraulic and Electrical
Engineering Works. Landscape works are to include the following:

- Excavation and drainage to planting areas

= Topsoil supply and installation

- Edging to street tree planting as required

| - Shaping of garden beds

= Containerised plant material - supply and installation
= Garden mulch - Supply and installation

EXCAVATION AND DRAINAGE

Break up and remove any excess concrete slurry from construction works to achieve required planting
depths. Excavate site soll to a depth of 100mm. Break up remaining subgrade to @ depth of 100mm. Drainage
is to be incorporated to ail planting areas that are enclosed by hard edging and not otherwise drained.

TOPSOIL - SUPPLY AND INCORPORATION

Planting areas are to be progressively filed with premium grade blended organic garden soil mix to a
minimum of 100mm depth. Soil to be an approved organic soil mix. Soil supplier, as well as intended mix is to
be nominated. Soil is to be mounded to facilitate good drainage to hardstand areas (max 1:3 grade) and is to
finish 50mm below edging after settlement. Organic additive such as ‘Dynamic Lifter is to be incorporated
throughout the soil mix at the recommended rate. A slow release fertiliser ‘Osmocote’ or equivalent is also to
be incorporated with individual plantings in accordance with the manufacturers recommendations. To improve
the water holding capacity of the dry & well drained soils on site, the adding of a moisture holding product
such as “Hydrocell” or “Rainsaver" is recommended following manufacturers guidelines

EDGING TO STREET TREE / PLANTING AREAS.
Edging to perimeter planting and abutting turf areas, to be extruded concrete edging. Line of edging to be set
‘out and approved on site prior to construction. Refer LAQ2 - LAOS for locations.

 

5 | ot Reconfiguration

E-enie Creek Road, Noosaville
LANDSCAPE OPERATIONAL WORKS

   
 
   
 
   
   
 
  
 
 

atc

WORKS
(084 ENVIRONMENTAL DRAINAGE

ean se penieaaeeaantnd

P2593

LOTS

 

SHAPING OF GARDEN AREAS
Planting areas are to be finished in a gently mounded fashion to facilitate drainage of excess water and to

‘show planting to best advantage. Contractor is to seek confirmation of finished levels prior to final plantings
‘and application of mulch.

CONTAINERISED PLANT MATERIAL

Plant material is to be approved by prior to planting. Planting is to be carried out in a manner
consistent with good horticultural practice, All 300 pot and larger plant material is to be guyed and staked as
per Detail - Advanced Container Planting. Smaller plant stock is to be staked #8 necessary. Stakes shall not
pass through the rootball of plant at time of planting or any time thereafter.

Stock may be rejected if plants are:-

'8) Undersized proportional to specified container size or is the root system if underdeveloped

b) Oversized proportional to specified container size or severely root bound.

¢) Unbalanced or uncharacteristic of normal or specified growth pattem for the species.

4d) Not suitably acclimatised for the specific environment

¢) Diseased, infested with pests or suffering from other form of significant stress.

GARDEN MULCH

Organic Mulch: Muich shall be weed free clean forest mulch or 2” inch hoop pine bark product to predominant
depth of 100mm. Mulch is to be graded to avoid placement against green plant stems and overflow from
purpose formed edges, kerbs and pathways.

TURF - SUPPLY AND LAY

1a) "A" grade couch minimum sod depth 25mm

b) Turf to be laid within 24 hours of being cut

) Allow for ground preparation and deposition of 50mm imported garden loam topsoil with water saving
product added. Refer point - 2 Topsoil. Organic fertiliser such as “dynamic lifter” to be spread beneath turf at
manufacturers recommended rate

) Turf to be closed butted and rolled in accordance with accepted practice to ensure a smooth even surface
‘¢) Water in well and monitor for stress.

CONCRETE - SUPPLY AND INSTALLATION

To pedestrian pavement as shown on drawings, supply and install 125mm depth 25mPa coloured concrete
Installation to follow industry best practices including ground preparation, compaction, minimal slump
allowances and minimum joint distances. Refer LAOS for details.

MAINTENANCE
‘@) Monitor plant performance and stress constantly and take appropriate remedial action. Soil moisture levels
are critical during early establishment

b) Mow turf every 2 weeks

c) Prune and shape all shrubs and trees as required

) Remove all stake s at 90 day inspection

€) Fertilise ail garden beds at 3 months

) Contractor shall maintain an up to date written log book to record inspection observations and actions

* Planting Establishment and Maintenance in accordance with Noosa Planning Scheme Policy 3 -
Landscaping Plants & Guidelines (February 2006)

 

FURTHER INFORMATION

Please refer to all documentation by James
Warren & Assoc Pty Ltd Environmental
Consuttants for further information relating to the
existing and proposed environmental measures
for this development

 

 

 

 

   

LANDGR

a “a
APHICS
LANDSCAPE ARCHITECTS
oot nee tae
ite eda el emroae

“ecneon |
Pm oh sae
COT pte = pat Se oo nay enn
SS

me

SLOT RECONFIGURATION

S & L Developments
7 ope Manages

Ken Hicks & Associates

 

 

 

 

 

 

Page 13

 

 

 

 

 

___ extent of works : a

 
  
  
  
      
     
  
       
 
 
  

12 =
2.5m? FEATURE PAVING Trees as
specified

Proposed Plant Selection
f Loop Rd & Kene St. Median Strips”

 

 

 

| Botanical Name Common Name Size | LOCATION as specified
cur -
SxCUP par 440 pot Turfed Areas
‘oblongifolia Dwarf Banksia 200 pot as specified
’* Banksia robur ‘Swamp Banksia 200

 

4 Banksia spinulosa Gok Cancactcks 200 pot
Dianella caerulea ily 140 .
Hardenbergia violacea Purple Coral Pea tact Planting Zone A
Hibbertia scandens Twining Guinea Flower 140 pot as scheduled

‘ccm leareiamnee Sl

Lomandra hystrix Mat Rush 140 pot -

| Melastoma affine Biue Tongue 200 pot Planting Zone B
* Honeyeater food species | 88 scheduled

ALL SPECIES SCHEDULED ARE TO BE INCLUDED.

 

 

 

 

"| Median Planting
PLANTING AREAS AS NOTED
REFER SHEETS LA02-LA05 FOR -] @8 scheduled

eC Te EXTENT OF MEDIAN STRIPS 7
densities to be in accordance {| 2.5m Concrete
with NSC Landscaping Plants & | | | Path as specified
Guidlines for butter planting: | =a
PLANTINGDISTANCES

2.5m? FEATURE PAVING
REFER LAO6 FOR DETAILS

 

 

 

IMPORTANT NOTE |

 

r

|

| REFER SHEET LAO6 FOR
PLANTING ZONES A&B
AREAS & SCHEDULES |

 

 

 

 

e REFER LAOS FOR DETALS ~~ LOT 1
Part Planting Plan - Loop Road , / Ree | ; . : y = - LANDGRAPHIC

Po . r : LANDSCAPE ARCHITECTS.

 

 

a. oak
re pe EAT an
The Noosa Plan - Streetscape Works ae : veel
$23.1 ‘A minimum of 1 street tree is provided for : Sen . pe ee |
every 8m of frontage cae rit . ee
$23.2 Lawn and low planting only are within * = |
500mm of the back of kerb to allow for any |
2.5m" FEATURE PAVING 5 LOT REG
necessary access from parked vehicles REFER LA06 FOR DETAILS Z a Eenie ON FIGURATION
S & L Developments
ig
Ken Hicks & Associates
es

LANDSCAPE

 

 

 

 

 

 

 

 

Page 14

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Vv 04080 SOV) | cozi 1sD7
= | = | =e | mer
wail .
eo] = 4 '
2) NVid Lvd Me ragnae hotomme ne pun ume] TEES

— AdVOSGNV1 Moog a eat
— annie 40} pepinaid $i 9a) Joes | JO WNWIUI y vers
ore SpON\ adeasia2nG - ve es00N 24 |
| sueuidojeneg 12S
_——— uo1qD2S404u| 49943 OUD’ eo\| doo] - ue | Suque e
| NOUVENOIINODSY LOT 1yDBS4D4U| 3243S oudy{ /peoy doo] - ue; | Suguey | peJ
| Patong
[noe tena n a T $1130 YOs 90V7 343Y
| oe

                        

S1WW130 YOs 90V1 43435 —)
Vv 3NOZ ONUNYIG ONIAVd SuNLVad AUS Z

 

 

 

 

 

wbsz01 xoudde
ditLS NVIG3N

 

 

 

 

\

NUED LA 02\\\ \\

\\

S
y
= \
}

 

 

 

DIHd VUHaNVT
. 2

  

 

 

 

 

 

ONIAYd SuNLvad Aug z

 

BOWNIVUG TWLNSINNOWIANS - FSO

‘SRM BMI dds NVIG3N

 

 

 

 

V 3NOZ ONLLNV Id F

 

 

 

 

 

8 3NOZ ONIN Id

 

 

 

 

 

 

‘STIVL30 OS 90V7 Had3e
ONIAYd SUNLV3S AUS e

 

            

 

V 3NOZ ONILNVId f 7 ‘ ee =
q aINGSHOS

 

 

ONILNV Id SdIdLS NVIGSW
4O4 Z0W1 LSSHS Y343y

|
SFINGSHOS 8 SVSYNV
@ 8 V SANOZ ONILNVId
4YOJ 90V1 LSSHS Y¥343y

i LON LNVLYOdWI

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 15

 

 

[ Vv so40%0 | OV) | cozi 1s07

a

 

 

 

 

= a : : 3244 ousy - ue) | Buyquey | pe |

              
                   

 

 

‘STIV130 YOs 90V1 NasIay
ONIAYd SUNLV3S AUS z

F (eS NVid Lav |
ed

| SEyEOSSY *B SOI UE}
jist ats:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

sjusuidojaneq 18S : ae ; W 3NOZ ONILNVId
a = 31nG3HOS }
‘ONAeSOON |
| NOUWINSLNOOSY 1078 ONLLNVId SdILS NVIGSW |
mee YO4 Z0V7 L33SHS Y343y } |
| ean |
means S31NG3HOS 8 SV3YNV
| SEES @ 8 V SSNOZ ONILNVId |
| REESE ne YO 90V7 L33HS 43434
| st9auimowy aevosawyy <= uoani | |
— OINd VAD ANY] oe Ses | wae |
ae Pe 2 posts
| (Fs 8 3NOZ ONILNVId - 5 I
( sepiyen pared Woy ssecce (uesse0eu } :
\ Aue 40} MOYE 0} G30} JO YOBQ O44) JO WLLIOOS wank 1 oer
\ ‘UNM axe Ajuo BunuB!d Mo] pue UME wees my x S1IVL30 NOs 90V7
eBeqU0yj jo we Ksene y & xe \ * eh ONIAVd SUNLWAd Aus z
z 40} pepyroud s} ean Jeans | jo WNWIUN y vers ‘ 1c r oa ak \ es
ao
Spo odersioRG - uel soon a4 |. w
wbsgz} xadde 6
didlS NVIOZIN a

 

 

 

 

 

 

 

 

 

@ 3NOZ ONILNYTd

 

 

 

 

 

didls NVIOZW
© 389 WOO XZ

STWV130 YOs 90V1 43438

ONIAVd SUNLVad AUS Z

 

 

 

 

v © penuluoco

 

 

 

 

 

__ siivi3a Yos 9ov7 Wasa ij
ONIAYd SUNLW3 aUS'z am ‘olamsnasientamaticden

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 16

 

 

+

Ai

 

 

                       

Shrubs and
| Groundcovers
= Sas if

 

“=| Turfed Areas
as specified

| Planting Zone A
"| as scheduled

Planting Zone B
as scheduled

    

/__2.5m* FEATURE PAVING
_ 7) REFER LA06 FOR DETAILS

=] Median Planting |
| as scheduled |

| 2.5m Concrete
Path as specified

 

 

 

           

iff
PLANTING ZONE B ewe a,
YX
A/\ \ 2x ALP exc

\\3x TRI lau

LOT 4

 

 

 

© _2.5m* FEATURE PAVING
REFER LAO6 FOR DETAILS The Noosa Plan - Streetscape Works

2x ALP exe. $23.1 A minimum of 1 street tree is provided for e = —
every 8m of frontage
$23.2 Lawn and low planting only are within LANDGRAPHIC

canes) Fasc) Guess ttec pokedveniaae” fag aa

2x ALI pe Cg SENS ewes
x ~iseecens

2

IMPORTANT NOTE | Saar
|
|

 

 

 

>< 3x CUP par

§ LOT RECONFIGURATION
Eenie Creek Road, Noosaville

   

REFER SHEET LA06 FOR
PLANTING ZONES A&B
AREAS & SCHEDULES

 

 

| REFER SHEET LA02 FOR
a \ 3x CUP ana MEDIAN STRIPS PLANTING

REFER Looe FOR DETAILS (ete LANDSCAPE

  

 

 

 

Part Planting Flan - Loop Road A] / oo

 

 

 

 

 

 

 

 

 

 

Page 17

 

Proposed Plant Selection Proposed Plant Selection
(as indicated on sheets | Ao2 - |_Aos) _lanting Zone (Ne

 

 

 

 

 

 

 

 

 

 

 

 

 

 

| Code Botanical Name Common Name Size No. | = ————— Wiseleen side'6t Lacy RSME Rose Siest epenic:Szsee Ys
L — = — — — lene e e
Beeches vipate ‘Twiggy Baeckea 140 pot | wo i ne 2 boundaries) \ a 00min. = 2.5m = 25m + pean
Backhousia m) Grey Myrtle 200m! Tr 1 : rl
TREES ; Banksiartur = Swamp Garksia 200 po | Sout and Eastom side of Rene Steet & South West poe y Aw ON
ALP exc phitonia excelsa Red Ash 45 litre 76 | * Banksia spinulosa Golden Candlesticks — 200 pot foetwoon fropen enain ae Soot ) i | : Ch ey :
| BRA dis Brachychiton discolor Lacebark Tree 45 litre a | | Conte rates fas aed Ree Ly Veo aL “a | - Concrete Edge — e ) |
janella caerulea fOTAL AREA approx. 10198qm 4 of al ab
| COM bar Commersonia bartramia Brown Kurrajong 45 litre 30 | Eleeocarpus reticulatus Blueberry Ash 25 litre Pienting densities to be In aovordance | { L
CUP ana Cupaniopsis anacardioides — Tuckeroo 45 litre a | fa violecaa’ Purple Cordd Pea! 40 pot with NSC Landscaping Plants & be ol af |
|* CUP par Cupaniopsis parvifolia Small-Leaved Tuckeroo 45 litre 9 | Hovea acutifolia Hovea 200 pot Guidlines for buffer planting: SSS 5559 = SSS SS
LIV dec Livistona decipens Weeping Cabbage Palm 45 litre | Melastoma affine Blue Tongue 200 pot Shrubs - 1m spacing cor Ket Ny
SYN glo Syncarpia glomulifera Turpentine 465 litre 6 | | Lomandra hystrix Mat Rush 140 pot_| — Groundcovers - 0.5m spacing
|* TRI lau Tristaniopsis laurina Water Gum 45 litre 45 | |” * Elaeocarpus reticulatus to be planted every 16-20m | .
| XAN lat le etait Forest Grass Tree 300mm (trunk ht.) 5 —————S_ =—= ————— TREE GROUPING
a S = SINGLE TREE
; _ “ALL SPECIES SCHEDULED ARE T TORE INCHED
Honeyeater food species RATIO OF PLANTING TO BE:
SHRUBS & TUFTING PLANTS 7 ee ~ Giosey Black Cockatoo food species [TREES = 20% | TYPICAL STREET TREE & CONCRETE EDGE DETAIL 1:50@A1
| Divcee Dianella caerulea Flax Lily 140 pot 150 | | GROUNDCOVER = 10% |
| LOMcon —_Lomandra confertifolia Matting Lomandra 140 pot 589 foes osed Plant Selection ne es J
| LOMhys — Lomandra hystrix Mat Rush 140 pot 2 Zonal
|_ MEL att Melastoma affine Blue Tongue 200 pot 80 Planting Zone a eer
5 ]
#Confirm all advanced s stock selections with LandGraphics prior to ste delivery [ Botanical Name _CommonName Size | LOCATION iS aa
. a = — m= = = Eastem side of Road, North section
IAAI THR OCR 1 9ER: AT Cle TUT OF 0, at GRIN = Allocasuarina littoral Black She-Oak 25 tre | pepebainds | dyevondia
Austromyrtus dulcis Midyim 140 pot | (adjacent to adjoining retail development)
* Banksia robur ‘Swamp Banksia 200 pot | Road, South
PLANT SPECIES NOTES |* Banksia spinuiosa Golden Candlesticks 200 pot castom aie Eee , section
; intersection approx. 337sqm
Brachychiton bidwillii Little Kurrajong 200 pot | ( to ekelihig rota develoorners)
Callistemon pachyphallus Swamp Callistemon 200 pot een
| General Natural Landsc cape Character is Commersonia bartramia Brown Kurrajong 25 lire | Westem end of Rene Street
Woodland / Open Forest Areas Dianella caerulea Flax Lily |40 pot North side of road approx. 422sqm
2 Elaeocarpus reticulatus Blueberry Ash 25 litre ‘South side of road approx. 325sqm
SPECIES SELECTED FROM Hardenbergia violacea Purple Coral Pea 140 pot
| TABLE 7.1 | z a ” emon Scented Tea Tree 200 pot TOTAL AREA approx. 1473eqm
TABLE 7.2 - SECONDARY CHARACTER - TREES AND LARGE SHRUBS | Leptospermum polygalifolium Wild May 200 pot with NSC Landscaping Plants &
TABLE 7.3 - SECONDARY CHARACTER - SMALL / MEDIUM SHRUBS, VINES AND | Lomandra hystrix Mat Rush 140 pot Guidlines for buffer planting:
GROUNDCOVERS | Melaleuca braceata Ravohution Green 200 pot | — Trees - 2m spacing
| it revolutum 200
SPECIES SELECTION: In accordance with Noosa Shire Council Development Permit for IT imosponm 200 pot_| Shrubs tm spacing

 

 

Lot Reconfiguration - § Lots 2006/1594, Condition 35 the above species and any other 7 Grounsoovare sien secre
i REFET TO SHEETS LA02 - LAOS FOR EXTENT OF PLANTING ZONES

 

species’ i, @ sret tees, carpark shade trees and feature planings ar to be naive |
Species endemic to the site. All species listed above have been cross referenced with the |
osaas Nabva Plorks wotene

 

Paveme nt Specification

Feature Coloured Concrete (CCS Mexico in Grey Cement) General Areas Concrete (CCS Paperbark in Grey Cement)

 
 
  

EXTRUDED CONCRETE EDGE DETAIL 1:10@a1 PLANTING DETAILS - ADVANCED STOCK 1:25@A1

 

 

NOTE
commeeuen joes tobe at min 4.0m centres PAVEMENT DETAILS

     

 

 

 

THIS IS A SUPLEMENTARY DETAIL Cut every ne
AND DOES NOT SUPERCEDE ANY second mesh § LOT RECONFIGURATION
EXISTING CIVIL ENGINEERING strand Tool finish Contraction Eenie Creek Noosaville
PEDESTRIAN FOOTPATH DESIGN Se eT Se
jm cer
aie - _ — | coma Reinforced 125mm thick 25 MPa S & L Developments
FINI IXTURE TYPE | COLOUR/ CODE FINISH LOCATION light exposed finished coloured concrete path ce eae ceed
= : z 5 = - a. a CONTRACTION JOINT 1:20@1
FEATURE COLOURED CCS MEXICO (in grey cement) Non-slip finish indicated | CCS (Concrete Colour oat) renvoroemnent exated
CONCRETE BANDING / with VEGETATION aan Systems) - Nicole Long en re one er
# VEGETATION IMPRINT IMPRINTING AS SHOWN 07 3287 6444

 

GENERAL AREA | CCS PAPERBARK (in grey cement) | Non-slip light exposed finish r CCS (Concrete Colour
LIGHT COLOURED with 10mm MARY RIVER AGG. OR is Systems) - Nicole Long

 

 

 

 

 

 

 

 

 

 

 

 

PAVEMENT SIMILIAR APPROVED 07 3287 6444 Se ea 20mm Deep Expansion Joints at
a - F | where 7 : recipies
CONCRETE GARDEN EDGE COS PAPERBARK OR 100mm x 100mm poh ee by qualified local contractor ——— canes concrete
on
## The feature coloured concrete banding with insitu created vegetation imprints in 2500mm PEDESTRIAN PAVEMENT DETAIL PLAN & SECTION 1:20@1 EXPANSION JOINT ;.20@1
‘square panels forms part of landscape character.
imprints should include vegetation endemic to the area such as Livistona australis, Livistona

 

 

Used in these records

About this file

File size
5.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0425 - Op Works - Landscaping [As Published].pdf · 5.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.