Council archive · source document
08/0425 - Op Works - Landscaping [As Published] · 142008.425
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008 IPA, schettuie &. part 1, table 5. item 1: 1P Regulation, schedule 2, table 2, tent: 1B Peaulation-sapedtie +-tabie-6- item SeatIONT SECT Wile Rivers Act 2808, section 434 ‘ENVIRONMENTALLY RELEVANT ACTIVITY: WILD RIVER ARE 13 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity? RX] No-Gotoors (] Yes iPA, 735A AVITHIN THE LIMITS OFA PORT ui Si i ge 1.4 Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1994? DX] No - Goto. 01.5 L] Yes IP Regulation, schedule 2, lable 2, items 16 and 16 IDECLARED FISH HABITAT AREA ©: ssa 15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994? [X] No - Gotoars (Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule 8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Advice Agency. IP Regulation, schedule 2. table 2, item 26 ‘COMMUNITY INFRASTRUCTURE sari Gea 16 Is any part of the premises designated for community infrastructure? DX] No - Gotoan.7 CI Yes IP Raguiation. schedule 2. table 3, item 7 an WASTE WATER MANAGEMENT isd: ~ cxtfr Gai hss 17 Does the proposal involve the establishment or expansion of a waste water disposal system? EX] No -éndof section? [[] Yes !P Reguiation, schedule 2. table 3. item § 41 ls any of the proposed operational work assessable under a planning scheme? O No - Go to Q4.2 & Yes - (Complete Form 1, Part E) Answer Qs4.1.1 - 4.1.7 below. 4.1.1 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road? &] No macs If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998, schedule 5 and does it exceed the threshold? X] No - Goto.04.1.2 oO Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency. IP Regulation, schedule 2, table 3, tem 3; IP Regulation. schedule 2, table 3, item 1(} id-river areal Water ACT 2006,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0425 - Op Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.