                                                                                          2009/1474




          Plan No,              Plan / Document Name – Prepared by                Date

          9/2087/1b -3          Part Site Plan, Elevation and Foundation          30 November
                                Plan – Adrian Pooley and Associates               2009

Relevant Period
2.     The Preliminary Approval lapses if the use has not happened by 21 December 2011, unless
       an application to extend the relevant period is approved by Council.
Security
3.     Security in the form of a cash bond or trading bank guarantee to the sum of $1500 must be
       submitted, to secure performance of all conditions of this approval, prior to the issue of a
       Development Permit for building works. The cash bond or trading bank guarantee will be
       returned on performance of the conditions of approval less any costs incurred by Council in
       respect of enforcing performance of this permit.
General
4.     Buildings and structures (including swimming pools, sheds, tennis courts, or outbuildings)
       shall not be constructed under overhead electricity transmission lines, or within any
       easements.
5.     The development shall be undertaken and operated in a manner that causes no detrimental
       effect upon the amenity of the neighbourhood due to the creation of excessive noise, lighting
       nuisance, or other emissions.
6.     External colours and finishes of the building shall comprise of muted/environmental tones
       that blend with the natural environment.
Building Height
7.     The building height shall not exceed 8.0 metres above the natural ground level, finished
       ground level and 2 storey.
Landscaping
8.     The Cupaniopsis anacardioides (Tuckeroo), Banksia integrifolia (Banksia), and Pandanus
       tectorius (Pandanus) in the road reserve adjacent the south west corner shall be retained.
9.     Vegetation particularly the Cupaniopsis anacardioides (Tuckeroo), Banksia integrifolia
       (Banksia) and Pandanus tectorius (Pandanus) adjacent the south west corner shall be
       protected from interference resulting from clearing or construction activities by:
       9.1.      Clearly marking vegetation to be retained with flagging tape;
       9.2.      Installing protective fencing around the drip line of the vegetation;
       9.3.      Low impact construction techniques are used around vegetation to minimise
                 interference with the vegetation.
10.    Cleared vegetation is to be suitably processed by one of the following methods and removed
       from the site:
       10.1.     Processing through a woodchipper or shredder. The resulting mulch is to be
                 stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high
                 with a minimum of 10 metres between edges of heaps.
       10.2.     Disposal for firewood.
       10.3.     Disposal for landscaping purposes.



                                                                                         Page 2 of 7

Used in these records

About this file

File size
56 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2009.00001474.001 [As Published].pdf · 56 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.