Decision Notice - 010.2009.00001474.001 [As Published] · 172009.1474
2009/1474
Plan No, Plan / Document Name – Prepared by Date
9/2087/1b -3 Part Site Plan, Elevation and Foundation 30 November
Plan – Adrian Pooley and Associates 2009
Relevant Period
2. The Preliminary Approval lapses if the use has not happened by 21 December 2011, unless
an application to extend the relevant period is approved by Council.
Security
3. Security in the form of a cash bond or trading bank guarantee to the sum of $1500 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for building works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
General
4. Buildings and structures (including swimming pools, sheds, tennis courts, or outbuildings)
shall not be constructed under overhead electricity transmission lines, or within any
easements.
5. The development shall be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood due to the creation of excessive noise, lighting
nuisance, or other emissions.
6. External colours and finishes of the building shall comprise of muted/environmental tones
that blend with the natural environment.
Building Height
7. The building height shall not exceed 8.0 metres above the natural ground level, finished
ground level and 2 storey.
Landscaping
8. The Cupaniopsis anacardioides (Tuckeroo), Banksia integrifolia (Banksia), and Pandanus
tectorius (Pandanus) in the road reserve adjacent the south west corner shall be retained.
9. Vegetation particularly the Cupaniopsis anacardioides (Tuckeroo), Banksia integrifolia
(Banksia) and Pandanus tectorius (Pandanus) adjacent the south west corner shall be
protected from interference resulting from clearing or construction activities by:
9.1. Clearly marking vegetation to be retained with flagging tape;
9.2. Installing protective fencing around the drip line of the vegetation;
9.3. Low impact construction techniques are used around vegetation to minimise
interference with the vegetation.
10. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:
10.1. Processing through a woodchipper or shredder. The resulting mulch is to be
stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high
with a minimum of 10 metres between edges of heaps.
10.2. Disposal for firewood.
10.3. Disposal for landscaping purposes.
Page 2 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2009.00001474.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 56 KB (small file)
- File type
No other editions are linked here.