Original source · versioned page text
CHANGE - key development parameters 28.04.2026
Criteria Community Facilities zone MDR zone Original Proposal Revised Proposal Comments Site Details 3,119m² (noting a new 600m2 lot to be subdivided) Height 8m and 2 storeys 8m and 2 storeys Types A & B building = 7m and single storeys Types C & D buildings = 8m and 2 storeys Existing House = No Change Building A (North 7 Units) = 8.3m & 2 storeys Building B (SW 4 Units) = 8.2m & 2 storeys Building C & D (East 8 Units ) = 8.65m & 2 storeys Slight encroachments within middle of the roof pitches and along southern extent of roof for Building C accounting for the topography. Site Cover 50% 45% (small dwellings) 39% (964m²) 48% (1,208m2) Complies with Site Cover for Community Facilities zone Plot ratio Individual buildings no more than 1,000m² each 0.5:1 (small dwellings) 0.38:1 (936m2) 0.41:1 (1,279m²) Complies with GFA for MDR Private Open Space Small dwellings – 20m²/9m² >20m2 / 9m² 9m2 Buildings above ground meet the minimum 9m2 size Setbacks Frontage – 6m Side – 3m Type A building – 6m frontage & 1.5m side boundary Type B Building Type C & D building Type A building – 6m frontage and 1.5m & 4m side boundary Type B – 1.5m side boundary Type C & D building – 6m frontage and 1.87m / 2m sides Existing House = No Change Building A (North 7 Units) = 6m frontage Maple St = 1.5m side North Building B (SW 4 Units) = 2.5m side South Building C & D (East 8 Units ) = 5.4m frontage Myall St = 2.5m side South & North Setback along northern boundary allows for landscaping and adjoins carpark. Setback to southern boundary allows for deep landscaping and a stepped treatment to adjoining property, so only appears as two storeys. Wall length <30m <15m <9m <15m with building breakup Articulated building facades in separate buildings Roof Form Width of parapet wall <50% of front 5 degree pitch & eaves No parapets >5 degree pitch and eaves around all buildings Pitched roofs and eaves are compliant with Cooroy style Landscaping 15% of site area (374m²) 2m landscaped garden to frontage Front 6m landscaping with pools and visitor carparking setback 2m 35% (874m2) landscaping with 60% (349m2) of this to be soft landscaping 894m²(36%) 680m² (77% soft) 1,010m² (32%) 555m² (63% soft) New landscaping complies with MDR landscaping calculations Carparking and access 1 space for 1 and 2 bedroom small dwelling and 1 space per 4 dwellings visitor 11 spaces plus 3 visitor = 14 total 14 spaces provided plus 1 SRV loading 19 spaces plus MRV loading area Parking provided at a rate of 1 space per unit + additional street bays Earthworks Cut or fill less than 1.5m 1.6m fill 2.2m backfill around Building C & D Earthworks is under the building and internal to site. [word/header1.xml] 45 Maple St, Cooroy Key Development Parameters Review Table (28/04/2026)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (CHANGE - key development parameters 28.04.2026.docx)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.