Council archive · source document
Minor Change Report 51989 294 03 (As Published) · 51989.294.03
202618/DA2.03 A Proposed Level 1 Plan, prepared by 2/03/2026
Blackwood
202618/DA2.04 A Proposed Roof Plan, prepared by 2/03/2026
Blackwood
202618/DA3.07 A North Elevation Proposed, prepared by 2/03/2026
Blackwood
202618/DA3.08 A East Elevation Proposed, prepared by 2/03/2026
Blackwood
202618/DA3.09 A South Elevation Proposed, prepared by 2/03/2026
Blackwood
202618/DA3.10 A West Elevation Proposed, prepared by 2/03/2026
Blackwood
202618/DA3.11 A Section A Proposed, prepared by 2/03/2026
Blackwood
202618/DA3.12 A Section B Proposed, prepared by 2/03/2026
Blackwood
202618/DA3.13 A Section C, prepared by Blackwood 2/03/2026
202618/DA6.01 A Powdery Room Joinery Plan, prepared by 20/03/2026
Blackwood
Partial Demolition of Existing Building
Codes of Development
33. Unless specifically conditioned otherwise, all works must comply with the relevant acceptable
solutions as contained in the Waste Management Code and Water Quality and Drainage
Code of the Noosa Plan 2020.
Works
34. Demolition must be undertaken in a manner that causes no detrimental effect upon the
amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions
in accordance with the nuisance provisions of the Environmental Protection Act 1994.
Waste Management
35. Adequate area must be provided on-site for the collection and separate storage of recyclable,
non-recyclable, vegetative and hazardous materials in their specific waste streams during
removal or demolition works.
36. All waste materials must be removed from the site to avoid causing unhealthy conditions,
with the site left clean, tidy and free from any debris.
37. Where a development permit has not been issued for the future use of the site, hard surfaced
areas including concrete slabs must be removed and disturbed areas must be revegetated
in accordance with PSP2 Landscaping of the Noosa Plan 2020. Alternatively, the site must
be turfed within 20 business days of completing the removal or demolition work.
Page 13 of 14
Document Set ID: 24768059
Version: 11, Version Date: 20/05/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Report 51989 294 03 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.