PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 12 NOVEMBER 2019
BRANCH ACTIVITIES RECENT ACHIEVEMENTS CURRENT PRIORITIES THE NEXT QUARTER
Noosa Trail Network Collaborated with Noosa District Preparation of Invitation for Quote Review of Noosa Trail Network
Landcare with revegetation projects documents for trail maintenance Assets and investigate inclusion into
on the trail network. contract. a potential Capital Work renewal
Installation of closure signage and Work with Noosa Tourism on Noosa program.
vehicle management infrastructure Trail Master Plan and consultant to
review draft.
Strategic Land use Planning
Drafting new Noosa Plan 3 month consultation period Working through submission that did Review submissions post
complete with 946 submissions not result in significant changes consultation and finalise Planning
received Undertaking consultation for Scheme for endorsement by Council
Recommended changes to the New significant changes. Consultation and referral to State for final sign off
Noosa Plan & presented to Council period open until 11th November. and gazettal in early 2020.
for endorsement to consultation -2nd Acknowledge all submissions
round of consultation proposed on received.
“Significant changes”.
Coastal Hazards Adaptation Plan Draft Climate Change Biodiversity Multi-criteria analysis and cost- Complete draft CHAP technical
Assessment (incl. report) completed. benefit analysis (where req’d) for report with consultants for Council
Phase 4 (asset identification) coastal erosion and inundation risks consideration.
completed. underway.
Phase 5 (risk assessment)
complete. Under review by State.
Coastal Communities cost-benefit
analysis under preparation.
Whole of Shire Climate Change Development of document structure Literature review and baseline risk Finalise whole-of-Shire multi-
Adaptation Plan and commencement of literature assessment for broader climate sectoral climate change risk
review and drafting. change plan. assessment with sector experts.
Preparation of community
engagement plan
Business as Usual activities General advice and advocacy Discussion with applicants about key Respond to enquiries and comments
Customer enquiries development sites linked to new arising from new planning scheme
planning scheme.
Page 37 of 44
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.