Original source · versioned page text
RFI - Appendix G SWMP by MPN Consulting
16 December 2021 Stormwater treatment will be implemented to remove sediments, nutrients, gross pollutants and hydrocarbons in accordance with the requirements of Noosa Council and the State Planning Policy. Stormwater discharged from site is proposed to be consistent with the existing Emporium showroom discharge. This development sits within a lot that has been allowed for in previous stormwater calculations, therefore no detention is proposed for this development. The proposed conceptual stormwater drainage layout is depicted on MPN Plan 8293-CP.1.01 attached in Appendix 3. 5.4.2 Stormwater Quantity Management Strategy The proposed development site will connect into the existing drainage system for the Noosa Civic Shopping Centre. The sites minor flows will run through the existing pipe system whilst the major overflows will overland flow down the internal roads prior to discharging to the Creek to the South of the site. There will be no impacts to external properties as a result of the development flows through the internal site system. The proposed development site has existing stormwater infrastructure which will be utilised for the expansion. Excellence with Economy in Engineering 9 l:\paige work\8293\16-12-21 stormwater management plan_issue d.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.