RFI - Appendix G SWMP by MPN Consulting
16 December 2021
Table of Contents
EXECUTIVE SUMMARY 2
1 PURPOSE 5
2 INTRODUCTION 5
2.1 Project Description 5
3 SITE CHARACTERISTICS 6
3.1 Site location 6
3.2 Topography and Existing Site Drainage 7
4 SITE DATA 7
5 STORMWATER 8
5.1 Flooding 8
5.2 Site Based Stormwater Management Plan 8
5.3 Operational Phase 8
5.4 Proposed Stormwater Quality Treatment Devices 15
5.5 Construction Phase (Sediment and Erosion Control) 16
6 CONCLUSION 18
7 LIMITATIONS OF REPORT 18
Excellence with Economy in Engineering 3
l:\paige work\8293\16-12-21 stormwater management plan_issue d.docx