Appendix M - Operational Waste Management Plan · MCU21/0146

of 38

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
3.2.2.      Signage
All receptacles, bins and other refuse management equipment will have adequate signage. Standard signage
will be provided in and around waste collection and storage areas (see Appendix D).

Table 3.4: Signage Checklist
 Objectives                                                          Checked   Remarks
 Ensuring compliance of signage with government local council                  Use signage provided by Council’s if available
 regulations.
 Ensuring that labelling on bins, refuse room etc. is appropriate
 and clear and easy to read and updated if required.

3.2.3.      Cleaning and Maintenance
Regular cleaning and maintenance of all refuse management facilities is important to maintain a safe and
hygienic environment for residents, visitors, staff and contractors.

Table 3.5: Cleaning and Maintenance Checklist
 Objectives                                                          Checked   Remarks
 General cleaning of all refuse holding and transfer areas                     Frequency depends on refuse generation and
 including                                                                     building operation.
  • Refuse rooms, bins and storage areas
  • Refuse transfer areas including lifts and staircases
  • Any other refuse management equipment
 Coordination of specialised cleaning contractors as required.
 Maintenance and servicing of refuse management equipment                      Frequency depends on equipment and building
 as per schedule.                                                              operation.
 Coordination of specialised equipment contractors as required.

3.2.4.      Refuse Minimisation
Refuse minimisation is an important part of any site operation. At a minimum, the following should be
implemented. Additional refuse minimisation options can be found in Appendix C.

Refuse minimisation requires regular reviewing to ensure operational sustainability of refuse volumes,
equipment and economic feasibility. It is recommended that refuse weights and movements are noted and
reviewed. An external review is usually conducted 12 to 18 months after the implementation of the plan.

Table 3.6: Refuse Minimisation Checklist
 Objectives                                                             Checked    Remarks
 Regular review of material quantities to avoid over-ordering.
 Consideration of secondary and recycled materials where possible.
 Encouraging refuse minimisation through education and signage
 (see below).
 Reduce refuse through continuous monitoring and review (see
 below).




Site: 17-19 Hofmann Drive, Noosaville                                                                                           13
Reference: 21BRW0009

Used in these records

About this file

File size
2.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix M - Operational Waste Management Plan.pdf · 2.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.