Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Appendix M - Operational Waste Management Plan · MCU21/0146

of 38

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
1           Introduction
1.1.        Background
TTM Consulting has been engaged by Stockwell Development Group PT to prepare an OWMP to support the
proposed residential development located at 17-19 Hofmann Drive, Noosaville. It is understood that a
development application will be lodged with Noosa Council.

1.2.        Scope
The content of this OWMP is intended to provide information in reverse order to the typical movement of
waste streams from disposal to collection. The reverse order provides context for refuse collection, storage
and transfer. Information on refuse disposal and collection points is given for each use within the
development. The items covered within the OWMP are described in Table 1.1. The key information for
Council approval can be found in Section 2.

Table 1.1: Scope Items

 Item                                   Description
 Refuse streams                         Identification of refuse streams and anticipated refuse volumes likely to be produced
 Refuse separation                      Recommendations for appropriate segregation methods for each refuse stream
 Refuse collections                     Assessment of refuse collection vehicle (RCV) access and manoeuvring
 Refuse storage                         Detailed analysis of refuse storage facilities and design
 Refuse transfer                        Assessment of refuse transfer between refuse storage and collections areas
 Refuse disposal                        Recommendations for refuse disposal within the development
 Refuse management equipment            Identification of recommended and optional refuse management systems and equipment
                                        Recommendations for operational efficiency and ongoing management, including refuse
 Refuse management operations
                                        minimisation, tenant education and safety
 Building design                        Recommendations for design of refuse management facilities

Detailed information including refuse calculations, site plans and drawings, recommended refuse
management equipment and system specifications, common refuse signage as well as a list of terms and
abbreviations are provided in the appendices.

The recommendations in this OWMP relate to the operational phase of the development. Additional
requirements for refuse management during or after demolition or construction phases are not included and
require a dedicated plan.

The provisions outlined in this OWMP are considered appropriate for this type of development. It is noted
that the refuse rooms are suitably sized to accommodate the refuse generated and number of bins proposed
based on standard storage and collection methods. The refuse rooms will also accommodate all options for
alternate equipment and disposal methods.




Site: 17-19 Hofmann Drive, Noosaville                                                                                           6
Reference: 21BRW0009

Used in these records

About this file

File size
2.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix M - Operational Waste Management Plan.pdf · 2.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.