Meeting minutes
ORDINARY MEETING | 16 JULY 2026
b. Inclusion of facilities and parking for both powered boats and unpowered
craft at the site including provision of an accessible, all abilities launching
facility;
c. Sufficient setback from the Doonella Bridge to preserve integrity of future
traffic lanes for future upgrade work and any replacement, as well as for
improved riparian foreshore and amenity outcomes for Lake Doonella
mouth;
d. Exclusion of boat trailer traffic from Hilton Esplanade with a dedicated
entry and exit from Hilton Terrace for the facility;
e. Provision for the shared pathway through and adjacent to the site which
is part of the TMR-endorsed high-priority regional route for pedestrians
and cyclists;
f. Consideration of CPTED (Crime Prevention through Environmental
Design) to ensure safety for users and reduction of site crimes such as
vandalism;
g. Resolution of environmental and climate change impacts including
hydrological impact of any filling in the Noosa River and Lake Doonella
mouth, habitat loss from marine plant removals, sediment flows and
impacts of frequent tidal inundation;
h. Suitable living foreshore riparian buffer to facilitate erosion resilience,
improved water quality, biodiversity and natural amenity along the extent
of the interface with the River; and
i. Consideration of amenity, recreation and landscaping presentation
befitting a key entry area into Noosa and in line with the Noosa Design
Principles;
D. Seek clarity on funding arrangements for the entire works, noting that MSQ fund
both on-water and on-shore components of the project; and
E. Request the matter be reported back to Council for further consideration of the
proposal, following MSQ’s community and stakeholder engagement and review of
consultation findings.
Amendment No. 1
Moved: Cr Amelia Lorentson
Seconded: Cr Nicola Wilson
That Item C be deleted (and renumber the subsequent items):
C. Advise MSQ of the following design parameters that Council seeks for MSQ to
include in its ongoing design work:
a. Provision for periodic large commercial vessel and item launch and retrieval under
shared use design arrangement;
b. Inclusion of facilities and parking for both powered boats and unpowered craft at
the site including provision of an accessible, all abilities launching facility;
c. Sufficient setback from the Doonella Bridge to preserve integrity of future traffic
lanes for future upgrade work and any replacement, as well as for improved
riparian foreshore and amenity outcomes for Lake Doonella mouth;
d. Exclusion of boat trailer traffic from Hilton Esplanade with a dedicated entry and
exit from Hilton Terrace for the facility;
e. Provision for the shared pathway through and adjacent to the site which is part of
the TMR-endorsed high-priority regional route for pedestrians and cyclists;
f. Consideration of CPTED (Crime Prevention through Environmental Design) to
ensure safety for users and reduction of site crimes such as vandalism;
g. Resolution of environmental and climate change impacts including hydrological
impact of any filling in the Noosa River and Lake Doonella mouth, habitat loss from
marine plant removals, sediment flows and impacts of frequent tidal inundation;
Page 14 of 18