Council archive · source document
RFI - Attachment E - Acid Sulfate Soil Management Plan · MCU25/0053
Plans and drawings: the text below has words only, no drawings.
QLD DEHP, 2013. ‘Queensland Water Quality Guideline Version 3, 2013’. Queensland Department of Environment and Heritage Protection, Brisbane, QLD Qld Government, 2024. ‘Queensland Acid Sulfate Soil Technical Manual – Soil Management Guidelines Ver 5.1’. Department of Resources and Department of Environment, Science and Innovation, Queensland. 6 LIMITATIONS PTG Consulting has prepared this report (or services) for this project in accordance with PTG's proposal and acceptance received from the Client. These limitations apply whether the report was created under PTG’s own terms and conditions or otherwise. This report is provided for the exclusive use of SCG Consulting Engineers for the Acid Sulfate Soil investigation scope of works and proposed residential development at 7 Noosa Parade, Noosa Heads. The report should not be used by or relied upon for other projects or purposes on the same or other site or by a third party. Any party so relying upon this report beyond its exclusive use and purpose as stated above, and without the express written consent of PTG, does so entirely at its own risk and without recourse to PTG for any loss or damage. In preparing this report, PTG has necessarily relied upon information provided by the client and/or their agents. PTG's advice is based on information gained from limited subsurface excavations and sampling supplemented by knowledge of local geology and experience. The accuracy of the advice provided by PTG in this report may be affected by undetected variations in ground conditions across the site between and beyond the sampling and/or testing locations. For this reason our reports include an interpretation of conditions between the test points. There are unknowns or variations in ground conditions between test locations that cannot be inferred or predicted. Such variations may occur after PTG's field testing has been completed. The precision and reliability of interpretive assessment between discrete points is dependent on the uniformity of the subsurface strata, as well as the frequency, detail, and method of sampling or testing. Geotechnical information represents an opinion and is based extensively on judgment of both data and interpretive assessments or observation. This report and its associated documentation are provided explicitly based on PTG’s opinion of the site at the time of inspection, and cannot be extended beyond this. Any recommendations or design suggestions will need to be verified on site during project implementation or construction. Inspection and verification on site may be conducted by a suitably qualified geotechnical consultant or engineer, and where subsurface conditions or interpretations differ from those provided in this document or otherwise anticipated, PTG must be notified and be provided with an opportunity to review the recommendations. The report has been prepared by qualified personnel, and is based on the information obtained from field and laboratory testing, and has been undertaken to current engineering standards of interpretation and analysis. The information and interpretation may not be relevant if the development proposal is changed. If this happens then PTG Engineering will be pleased to review the report and the sufficiency of the investigation work. Every care is taken with the report as it relates to interpretation of subsurface conditions, and the discussion and recommendations or suggestions relating to the geotechnical aspects of the scope of works. However, PTG Engineering cannot always anticipate or assume responsibility for: » Unexpected variations in ground conditions. » Changes in policy or interpretations of policy by statutory authorities. » The actions of contractors responding to commercial pressures. The contents of this report do not constitute formal design components, as required by Health and Safety Legislation and Regulations, to be included in a Safety Report specifying the hazards likely to be encountered during construction and the controls required to mitigate risk. This design process requires risk assessment to be undertaken, with such assessment being dependent upon factors relating to the likelihood of occurrence and consequences of damage to property and to life. This, in turn, requires project data and analysis presently beyond the knowledge and project role respectively of PTG. This report must be read in conjunction with all of the attached documents and should be kept in its entirety without separation of individual pages or sections. PTG cannot be held responsible for interpretations or conclusions made by others unless they are supported by an expressed statement, interpretation, outcome, or conclusion stated in this report. 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment E - Acid Sulfate Soil Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 823 KB (small file)
- File type
No other editions are linked here.