Council archive · source document
RFI - Attachment E - Acid Sulfate Soil Management Plan · MCU25/0053
Plans and drawings: the text below has words only, no drawings.
1 REPORT SCOPE 4
2 PROJECT DESCRIPTION 4
3 SUBSURFACE CONDITIONS 4
CONTENTS 4 LABORATORY TEST RESULTS 4
5 SUMMARY 5
5.1 Soils 5
5.2 Groundwater 5
5.3 Acid Sulfate Soil Management Plan 5
5.3.1 Background 6
5.3.2 Recommended Management of Acid Sulfate Soils & Groundwater 6
5.3.3 REFERENCES 9
6 LIMITATIONS 10
TABLE
Table 1: Acid Sulfate Soil Management for Proposed Site Earthworks ...........................................................................6
3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment E - Acid Sulfate Soil Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 823 KB (small file)
- File type
No other editions are linked here.