Soils (continued): recommended that density testing of the soil is carried out to provide a better estimate of the in-
situ soil density.
» As an alternative to lime treatment of excavated soils, the excavated soils may be transported
offsite untreated, where disposed of at a suitably licenced landfill facility which is able to accept
untreated Acid Sulfate Soil. The Acid Sulfate Soil may still require lime treatment once placed at
the landfill facility, to be checked with the site owner.
» If onsite materials won from cuts below RL 5 m AHD are to be used as fill, these soils will be
required to be lime treated and validated to ensure that the soil acidity has been neutralised prior
to placement as fill.
» Note that higher Acid Sulfate Soil contents and soil lime treatment rates may be encountered
within the untested soils between the small diameter boreholes tested. This must be understood
by the contractor before excavations are carried out.
» If soil is to be disturbed below the depths tested, or outside the areas tested as indicated in this
report, further soil testing will be required prior to earthworks to confirm treatment requirements.
» Soils excavated below RL 5 m AHD are to be adequately treated with lime at the recommended
rates on a lime pad constructed either at the site or offsite so as to achieve neutralisation. All
materials to be treated must be thoroughly mixed in thin layers typically less than 300 mm
thickness with a rotary hoe or similar device. The lime pad is to be prepared by compacting a clay
layer typically 300 mm thick, then constructing earth bunds around the perimeter using soils
known to be free of Acid Sulfate Soils. Finally, a ‘lime guard layer’ is to be placed at a rate of
5 kg/m2/300 mm layer of stockpile. The treatment area must be located away from surface water
flow paths. Refer to Figure 1 found later in this ASSMP to observe an example treatment pad
section.
» The contractor responsible for soil lime treatment needs to ensure the soils are adequately and
properly treated with lime to ensure neutralisation.
» Once the soils are treated with lime, audit/validation testing must be carried out to ensure that
the soils have been neutralised. Acid Sulfate Soils which are not neutralised during the first round
of soil lime mixing will require a second round of treatment by adding lime to the soils at rates
based on the results of the validation testing. Refer to the ‘Validation Testing’ section of this
ASSMP for further information. Validation testing must be carried out prior to removal of the soils
from the site, or replacement at the site.
» Provide earth bunds constructed using materials known to be free of Acid Sulfate Soil at locations
surrounding the earthworks/development area so as to reduce the potential of surface water
running off the site.
» 0.5 kg of lime/m2 will be applied to the base of all excavated areas to ensure ‘hotspots’ or isolated
areas not tested are neutralised.
» A lime spray will be used on excavation faces using a nominal lime:water ratio.
» 500 kg of agricultural lime must be kept on site at all times in case of emergency treatment.
» The pH of any water collected within bunds or sumps is to be monitored. A pH value of between
6 and 8 is to be maintained before release or reuse onsite. Note that the results of the pre-
excavation groundwater pH testing may indicate a pH value outside this range which may be
deemed as a ‘natural’ value based on the assessment of a suitably qualified and competent
groundwater consultant. Further water criteria may apply based on Noosa Shire Council
requirements and this should be checked.
» It is noted that construction materials may need to be suitably protected from the acidic soil
environment. A suitably qualified and competent corrosion engineer should be contacted for
further advice.
Groundwater: Although groundwater was not encountered in the boreholes drilled as part of the PTG Geotechnical
Investigation Report, information is provided regarding groundwater monitoring as a precaution.
Depending on the earthworks duration and timeline, earthworks may be carried out during wet
weather periods and groundwater may rise and develop further within the soil profile. The
groundwater level may also be affected by the water level in Noosa River adjacent to the site.
Groundwater monitoring is recommended to check that the earthworks do not adversely affect
groundwater.
Where guideline values are provided, on site performance criteria for groundwater monitoring should
be based on the QLD DEHP Guidelines. For any parameter values not covered in the QLD DEHP
7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment E - Acid Sulfate Soil Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 823 KB (small file)
- File type
No other editions are linked here.