ABN 21 613397934 CQA Laboratory                                      P.O. Box 1225, Nambour Qld 4560
                                                                           6 Mill Lane Nambour




Civil Quality Assurance Pty Ltd T/A CQA              For all Geotechnical Engineering and Civil Testing
Ph      0429674334                                             Servicing Australasia


            Slope Stability Assessment
      193 Sankeys Road, Federal, Queensland




Client: Lachlan Robins
Testing Authority: Civil Quality Assurance Pty Ltd
Certification Authority: Lake Mac Geo Pty Ltd
Date: 17 July 2023
Full text of the other 30 pages

Page 2

Contents
1    INTRODUCTION .............................................................................................. 1
2    SITE DESCRIPTION AND PROPOSED WORKS .......................................... 2
3    GEOLOGY ......................................................................................................... 5
4    FIELDWORK..................................................................................................... 6
5    ENCOUNTERED GROUND CONDITIONS ................................................... 7
6    FIELD AND LABORATORY TESTING ......................................................... 8
7    ASSESSMENT OF STABILITY....................................................................... 9
8    GEOTECHNICAL CONSTRAINTS TO DEVELOPMENT ......................... 10
9    SLOPE RISK ASSESSMENT ......................................................................... 12
10 CONCLUSIONS AND RECOMENDATIONS .............................................. 13


APPENDIX A – LOCATION PLAN
APPENDIX B – BOREHOLE LOGS AND TEST RESULTS
APPENDIX C – SITE PHOTOGRAPHS
APPENDIX D – PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK
             MANAGEMENT 2007




193 Sankeys Rd Slope Stability Certification
                                                                                                     July 2023
                                                           i

Page 3

  1     INTRODUCTION
  Civil Quality Assurance Pty Ltd (CQA) have been commissioned by Lachlan Robins to
  undertake a slope stability assessment and to provide recommendations for a proposed
  residential development at 193 Sankeys Road, Federal, Qld, 4568 (the Site).
  The property is described as Lot 6 on RP216727.
  The aim of the Report was to assess the geotechnical considerations of altering a slope to
  provide a level pad for construction of a residence.
  The report has been prepared by Phil Band of Lake Mac Geo RPEQ 23841.




193 Sankeys Rd Slope Stability Certification
                                                                                   July 2023
                                                1

Page 4

  2     SITE DESCRIPTION AND PROPOSED WORKS
  The Property is situated on the west side of Sankeys Road 1.5m north east of Federal CBD as
  shown in Figure 1 below:




                                          Figure 1 – Site Location
  The site is currently a partially cleared and uncleared bushland. The Site is partially cleared
  with mature and semi-mature trees.
  Rural residential properties surround the site on all sides. Site photographs are presented as
  Appendix C.
  It is proposed to construct a single residence in the location indicated in Figure 1. The
  proposed building is 8.5m by 16.5m, and elevated off the ground by up to 2.5m with a deck.
  The existing slope is 21 and appears stable with no signs of creep, tension cracks, bulging or
  other indicators of failure, nearby trees are vertical or near vertical.
  As part of these works it is proposed to cut into the slope to provide a level building pad, this
  will require creation of a slope at an angle of 80 to a height of approximately 2.6 high.
  Figure 2 and 3 Illustrates the proposed house and slope. Long term the 80 slope will be
  supported with a concrete block retaining wall.




193 Sankeys Rd Slope Stability Certification
                                                                                     July 2023
                                                    2

Page 5

                              Figure 2 – Proposed Works – Cross Section




193 Sankeys Rd Slope Stability Certification
                                                                          July 2023
                                                 3

Page 6

\ EXISTING ACCESS ROAD
WITHIN. EASEMENT

 

-> ~ Dwelling /
N /

 

/ —— Apain Gite aor

 

Figure 3 — Proposed Works — Plan

 

193 Sankeys Rd Slope Stability Certification
July 2023

Page 7

  3     GEOLOGY
  Reference to Queensland Geological Survey Mapping shown in Figure 4 below and taken
  from https://georesglobe.information.qld.gov.au indicates the site is underlain by the Kin Kin
  Beds comprising Strongly cleaved and commonly kinked mudstone with thin siltstone
  laminae; minor volcanilithic sandstone of middle Triassic age.
  .




                                         Figure 4 - Geological Map
  It is considered likely that the mudstone will have weathered to residual soils for up to 1m
  depth. These generally comprise silty and/or sandy clays.




193 Sankeys Rd Slope Stability Certification
                                                                                    July 2023
                                                    5

Page 8

  4        FIELDWORK
  The Fieldwork was undertaken by CQA and comprised:
       •    A Walkover Survey including:
                o Assessment of soil and rock outcropping
                o Surface drainage conditions
                o Topography
                o Four Hand Augured boreholes
                o Two Dynamic Cone Penetrometer Tests (DCP)
                o Erosion observations.
                o Vegetation coverage/conditions.
                o Three Permeameter tests.
  Photographs from the site inspection are included as Appendix C.




193 Sankeys Rd Slope Stability Certification
                                                                     July 2023
                                                6

Page 9

  5     ENCOUNTERED GROUND CONDITIONS
  The two boreholes drilled at the shed location contained in Appendix B generally revealed the
  following ground profile:


              Borehole            Silty CLAY    Shale Stone         DCP Refusal
           Log of Visible            0.0-0.3m   0.3-1.5m+                 -
              Cutting
                   2                 0.0-0.3m   0.3-0.5m+                0.8
                   3                 0.0-0.4m   0.4- 0.5m+               0.8
                   4                 0.0-0.5m   0.5-0.6m+                 -


  Silty CLAY, medium to high plasticity, brown, some fine gravel/sand and some organics
  present moist, soft to firm (CI-CH)
  SHALE STONE, fractured, light red/brown, quartz present, moist, weak.


  Groundwater was not encountered.




193 Sankeys Rd Slope Stability Certification
                                                                                 July 2023
                                                7

Page 10

  6     FIELD AND LABORATORY TESTING

  Field Permeameter testing was undertaken in three test pits on the site and all tests returned
  values of 25mm/hr. A 150mm diameter permeameter embedded 600mm into the ground with
  a 250mm depth of water was used.
  A sample of the clay was tested for liquid limit and liner shrinkage and returned values of
  38.5% and 14.5% respectively. 34,5% of the sample was retained on a 0.425mm sieve.
  Report Sheets are included in Appendix B.




193 Sankeys Rd Slope Stability Certification
                                                                                   July 2023
                                                8

Page 11

  7     ASSESSMENT OF STABILITY
  Reference to Noosa Shire Council Planning, “Landslide Hazard Overlay Mapping” shows the
  the lot is within Moderate and High Hazard Areas with he proposed residence location being
  in a Moderate Hazard Area,
  An extract from Council’s “Landslide Hazard Overlay Mapping” is shown in Figure 3 below.


                                    Site




                        Figure 3 - Council Landslide Hazard Overlay Map


  At the time of the inspection the existing 21 slope exhibited no evidence of failure, rotation
  or sliding or cracking. No areas of groundwater seepage were observed. Surface erosion was
  observed to be minimal.
  The proposed Slope is to be modified provide a level building pad.
  The existing slope will be cut back by approximately 8m at an angle of 80 to a maximum
  height of 2.6m; any clay at the crest of the cutting will be cut back to 4h to 1v and will be
  topsoiled and seeded to protect from erosion. Long term the slope will be




193 Sankeys Rd Slope Stability Certification
                                                                                     July 2023
                                                 9

Page 12

  8        GEOTECHNICAL CONSTRAINTS TO DEVELOPMENT
  The following comments apply to construction on all the site.

  Slope Stability
  The site shows no signs of slope instability and will be cut into rock; however the new slope
  will be considerably steeper than the existing and could be considered medium risk until the
  retaining wall is constructed; once the wall has been constructed the slope can be considered
  low risk; however, the development should not amend or alter other slopes without specific
  geotechnical advice.
  The following recommendations shall be adhered to:
       •    Any site earthworks carried out must comply with A.S. 3798, “Guidelines on
            Earthworks for Commercial and Residential Development”.
       •    Any soil fill should be placed and compacted to “Level 1 Requirements” set out in
            A.S.3798. to comply with Controlled Fill as stated in A.S.2870, “Residential Slabs
            and Footings”.
       •    Excavate all of the clay above the rock in the platform area.
       •    Provide a drainage diversion to the crest of the slope to direct surface water away
            from the crest of the cutting.
       •    Ensure that all of the site is level.
       •    Place fill which is at least CBR 15 or above with less than 15% passing the .075mm
            sieve.
       •    Direct all water away from the site with surface drains.
       •    Dams, ponds, swimming pools, or any auxiliary services such as soakaways or septic
            tanks plants are to be placed away from the site but not below it by at least 50m.
       •    Any fill material encountered shall be excavated and re-used if suitable and if
            unsuitable either modified to be suitable, removed from site or used as landscape fill.
       •    Cut and fill areas may be battered at an angle of up to 1V to 3H or shall be retained
            using engineer approved retaining methods. Steeper slopes may be achievable with
            specific geotechnical advice. Prior to filling any topsoil, grass, roots or other organic
            matter shall be removed from the construction area.
       •    Slopes steeper than 1V to 7H shall be benched to avoid introducing preferential
            failure surfaces.

  Surface Drainage
  All structure roof drainage shall be collected and piped to approved legal points of stormwater
  discharge.
  The ground surrounding the structure shall be shaped so that surface runoff flows away from
  all structures. Drainage should be provided to minimise variations in moisture content in soils
  surrounding and below sites and prevent concentrated run‐off causing erosion.
  During construction, measures will be required to prevent erosion, undercutting and over
  saturating soil areas that may lead to slope instability. The basic principles of managing
  stormwater on any development site are:

193 Sankeys Rd Slope Stability Certification
                                                                                        July 2023
                                                    10

Page 13

      •    Control the flow volume
      •    Control the flow path
      •    Reduce run off velocity
  Many techniques are available to achieve these objectives. The following list provides some
  common methods for Stormwater Management.
      •    Vegetation Retention / Re‐Establishment: Plants provide a means of retarding
           surface flow as well as acting as a natural filter. Where possible, natural vegetation
           should be left undisturbed. Establishing vegetation cover in potential problem areas
           (steep slopes, gullies etc.) will also assist in reducing erosion.
      •    Surface Drains / Grassed Swales: Well grassed diversion drains provided above
           exposed surfaces redirect water around erosion prone areas. These should be used in
           conjunction with level spreading devices to disperse fast moving, concentrated surface
           flows.
      •    Level Spreaders: A level spreader typically consists of a coarse gravel filled trench
           running parallel to the natural surface contours. This redistributes surface water and
           allows concentrated flows to spread over a large area and decreasing the velocity.
  Surface Erosion
  Soils lost from land surfaces as a result of surface water run off not only removes valuable
  topsoil from the area, but also result in siltation of downstream waterways when the sediments
  settle. Loss of soil is usually the result of leaving bare surfaces exposed to the elements, or
  from concentrated surface flows scouring the natural surface. Temporary measures can be
  taken to control and contain sediment removal during construction such as:
      •    Covering Stockpiles: Stockpiles of soil can be covered with plastic sheeting and re‐
           spread when construction is completed.
      •    Sediment Control Fencing: Hay bales or Hessian sacks supported between pickets
           and placed across the paths of surface water can catch sediments for future re‐
           spreading. Specialised sediment fencing is available for broad scale hillside scouring
           protection.
      •    Sediment Basin: A suitably sized earth basin may be constructed during the
           development to capture turbid stormwater runoff, where the sediment is allowed to
           settle before the cleaner water is pumped to a legal point of discharge. The sediment
           should be regularly emptied during drier periods.
  In general, it is recommended that all development on hillside areas should follow Good
  Hillside Construction Practice recommended in the information sheets presented in Australian
  Geomechanics Society “Practice Note Guidelines for Landslide Risk Management”,
  Australian Geomechanics Vol 42 No. 1 March 2007. An extract is attached as Appendix E.




193 Sankeys Rd Slope Stability Certification
                                                                                      July 2023
                                                  11

Page 14

  9     SLOPE RISK ASSESSMENT
  “Risk is defined in the Australian Geomechanics Society publications as a measure of the
  probability and severity of an adverse effect to health, property or environment. Risk is often
  estimated by the product of numerical probability and consequences; however, a more general
  interpretation involves a comparison of the probability and consequences in a non‐product
  form. To carry out a full risk assessment of the site would require a full understanding of the
  type of structure proposed and the associated earthworks along with the likely consequences
  should failure occur.
  The site was assessed in terms of “Landslip Risk Management Concepts and Guidelines”
  published by The Australian Geomechanics Society.

                                      RISK LEVEL IMPLICATIONS

         RISK LEVEL                                       EXAMPLE IMPLICATIONS
      VH  VERY HIGH RISK                  Extensive detailed investigation and research, planning and
                                          implementation of treatment options essential to reduce risk
                                          to acceptable levels; may be too expensive and not practical
       H          HIGH RISK                 Detailed investigation, planning and implementation of
                                         treatment options required to reduce risk to acceptable levels

       M      MODERATE RISK            Tolerable, provided treatment plan is implemented to maintain or
                                                  reduce risks. May be accepted. May require
                                               investigation and planning of treatment options.
       L           LOW RISK              Usually accepted. Treatment requirements and responsibility
                                                   to be defined to maintain or reduce risk.
      VL       VERY LOW RISK                 Acceptable. Manage by normal slope maintenance
                                                                  procedures.


  It is our opinion, based on Appendix C of Australian Geomechanics Society, “Practice Note
  Guidelines for Landslide Risk Management 2007”, that if development is managed in
  accordance with the recommendations in this report and the geotechnical development
  constraints presented are strictly followed, the site can be developed with a MODERATE
  RISK of damage to persons or property prior to construction of the retaining wall and a LOW
  RISK of damage to persons property once the retaining wall has been constructed.




193 Sankeys Rd Slope Stability Certification
                                                                                             July 2023
                                                      12

Page 15

     10 CONCLUSIONS AND RECOMENDATIONS
     Site stability as assessed on the basis of visual inspection and sub‐surface investigation. No
     evidence of previous movement, seepage or soil creep was observed in the area.
     We consider the site can be developed with a MODERATE RISK of damage to persons or
     property prior to construction of the retaining wall and a LOW RISK of damage to persons
     property once the retaining wall has been constructed in accordance with “Landslip Risk
     Management Concepts and Guidelines” published by The Australian Geomechanics Society
     and recommended building and construction methods as set out in this report.
     Weekly visual inspections of the slope are recommended during construction with additional
     inspections after heavy rain. If any signs of movement i.e. cracking, bulging, spalling etc are
     observed CQA shall be informed immediately and all work in the area suspended until a
     geotechnical inspection can be carried out.
     An inspection and removal of any loose rocks shall be undertaken prior to any workers
     accessing the toe of the slope for construction of the retaining wall or waste collection area.
     All construction should be in accordance with good hillside practice as illustrated in Figure J1
     of Australian Geomechanics Society Sub‐Committee recommendations for Landslide Risk
     Management attached as Appendix D.


     Report Prepared by:




     Phil Band BEng MSc MIEAust CPEng NER AGS RPEQ 23841




193 Sankeys Rd Slope Stability Certification
                                                                                    July 2023

                                               13

Page 16

LIMITATIONS
Civil Quality Assurance (CQA) has prepared this report for the express and exclusive use
by the client. The report should not be used or relied upon for other projects or purposes on
the same or and other sites or by a third party. Any persons or party so relying upon this
report beyond the exclusive use and purpose stated above, and without the express written
consent of CQA, does so entirely at their own risk and without recourse to CQA for any
loss or damage. In preparing this report CQA has necessarily relied upon information
provided by the client and their associated agents.
The results provided in the report are indicative of the sub-surface conditions on the site
only at the specific sampling and/or test locations and only to the depths investigated and
at the time the investigation/work was carried out. Sub-surface conditions can change
abruptly due to variable geological processes and the result of human influences. Such
changes may occur after CQA has completed field testing.
CQA advice is based upon the conditions encountered during the investigation. The
accuracy of the advice provided by CQA in this report may be affected by undetected
variations in ground conditions across the site between and beyond the sampling and or
testing locations. The advice may also be limited by budget constraints imposed by others
or by site accessibility. Tests and sampling results relate only to the items tested or
sampled. Results applied to the samples received/tested and any abnormalities may
contribute to the report being compromised.
The assessment of atypical safety hazards arising from this this advice is restricted to the
geotechnical components set out in the report and based on known project conditions and
stated design advice and assumptions. While some recommendations for safety controls
may be provided, detailed safety in design assessment is outside the current scope of this
report and requires additional project data and assessment.
This report must be read in conjunction with all of the attached and should be kept in its
entirety without separation of individual pages or sections. CQA can not be held
responsible for interpretations or conclusions made by others unless they are supported by
the express statement, interpretation, outcome or conclusion stated in the report.
The report or sections from this report, shall not be used as part of a specification for a
project, without review and agreement of CQA. This is because this report has been written
as advice and opinion rather than detailed instructions for construction.




193 Sankeys Rd Slope Stability Certification
                                                                              July 2023

                                               14

Page 17

Appendix A — Location Plan

 

193 Sankeys Rd Slope Stability Certification
July 2023

Page 18

  

SS,
a
tae
%
os
3s NN ss
s EXISTING ACCESS ROAD

     

_ . WITHIN EASEMENT

    
    
 

 
 
 

 

Proposed 9°
Residential! R »

Dwelling» PaO)

8.5:

 

LOT6 4 |
RP216727 .

 

LeLghed4
gq wa

i LEGEND
—— Property Boundor
2“ a -- ce ing
ZY
Mojor Contour
Minor Contour
Waterway ~ Stream Order X

———~ Riparian Buffer Area

 

SITE LAYOUT
09 1 2 3 4m
‘eerie!
Scale 1:100 ot AS

 

Project

 

 

 

‘rowing Tie Frajet Norber
PROPOSED RESIDENCE

 

 

SITE PLAN 2022026
_A) Indecom | tot « rezi6727
a

‘rowing Number

02_of XX
; 193 SANKEYS ROAD, FEDERAL
camel ae ee a Solutions

 

 

 

 

 

 

Drawing Stats
ese] Bote | Description

a PRELIMINARY
LACHLAN ROBINS RELIMINAI

 

 

 

 

 

 

 

@_indecom Solutions Pty Lid

 

Page 19

   Appendix B – Borehole Logs and Test
                 Results




193 Sankeys Rd Slope Stability Certification
                                               July 2023
   `

Page 20

Civil Quality Assurance T/A _ ABN 21 613397934

  

Civil Quality Assurance Pty Ltd
PH 0429 674334

Project:__ 193 Sankeys Rd
Federal
Client: __ Lachlan Robins

P.O. Box 1225, Nambour Qld 4560

For all Civil Testing
Servicing South East Queensland

Requested By:__L.Robins
Date Tested:__30-6-23
Report No.:__ A191

Drilling Method: Log of cutting Bore Hole No.:1

Depth Description Comment

Mm

00 Silty CLAY, medium to high plasticity, brown, some fine gravel/sand and some organics present,
moist, soft to firm (CI-CH)

300 SHALE STONE, fractured, light red/brown, quartz present, moist, weak

1500 Hole Terminated

Tests and sampling results relate only to the items tested or sampled. results applies to the sample received/( abnormalities may contribute to the report being

compromised) Reports shall not be reproduced except in full

6 Mill Lane Nambour
CQA Laboratory
ABN 21 61339 7934

Form R26 July 2021

Approved Person:

C. Templeton

Date: 10-7-23

Page 21

Civil Quality Assurance T/A _ ABN 21 613397934

   

Civil Quality Assurance Pty Ltd
PH 0429 674334

Project:__193 Sankeys Rd
Federal
Client: __ Lachlan Robins

P.O. Box 1225, Nambour Qld 4560

For all Civil Testing
Servicing South East Queensland

Requested By:__L.Robins
Date Tested:__30-6-23
Report No.:__A191

Drilling Method: Hand Augured bore hole Bore Hole No.:2
Depth Description Comment
Mm

00 Silty CLAY, medium to high plasticity, brown, some fine gravel/sand and organics present,

300

500

moist, soft to firm (CI-CH)

SHALE STONE, fractured, light red/brown, quartz present, moist, weak

Hole Terminated in shale stone

‘Tests and sampling results relate only to the items tested or sampled. results applies to the sample received/( abnormalities may contribute to the report being
compromised) Reports shall not be reproduced except in full

6 Mill Lane Nambour

CQA Laboratory

ABN 21 61339 7934
Form R26 July 2021

jes
Approved Person: ec of
C. Templeton

Date: 10-7-23

Page 22

Civil Quality Assurance T/A _ ABN 21 613397934 P.O. Box 1225, Nambour Qld 4560

  

 

 

 

Civil Quality Assurance Pty Ltd For all Civil Testing
PH 0429 674334 Servicing South East Queensland
Project:__193 Sankeys Rd Requested By:__L.Robins

Federal Date Tested:__30-6-23
Client: __ Lachlan Robins Report No.:__A191
Drilling Method: Hand Augured bore hole Bore Hole No.:3
Depth Description Comment
Mm
00 Silty CLAY, medium to high plasticity, brown, some fine gravel/sand and organics present,

moist, soft to firm (CI-CH)

400 SHALE STONE, fractured, light red/brown, quartz present, moist, weak
500 Hole Terminated in shale stone

Tests and sampling results relate only to the items tested or sampled. results applies to the sample received/( abnormalities may contribute to the report being

compromised) Reports shall not be reproduced except in full > FT
Approved Person: Gurl

6 Mill Lane Nambour C. Templeton

CQA Laboratory

ABN 21 61339 7934 Date: 10-7-23

Form R26 July 2021

Page 23

Civil Quality Assurance T/A ABN 21 613397934 P.O. Box 1225, Nambour Qld 4560

   

 

 

Civil Quality Assurance Pty Ltd

 

 

 

For all Civil Testing
PH 0429 674334 Servicing South East Queensland
Project:__193 Sankeys Rd Requested By:__L.Robins
Federal Date Tested:__30-6-23
Client: __Lachlan Robins Report No.:__A191
Drilling Method: Hand Augured bore hole Bore Hole No.:4
Depth Description Comment
Mm
00 Silty CLAY, medium to high plasticity, brown, some fine gravel/sand and organics present,
moist, soft to firm (CI-CH)
500 SHALE STONE, fractured, light red/brown, quartz present, moist, weak
600 Hole Terminated in shale stone

Tests and sampling results relate only to the items tested or sampled. results applies to the sample received/( abnormalities may contribute to the report being

compromised) Reports shall not be reproduced except in full
: Approved Person: Ce /
6 Mill Lane Nambour C. Templeton
CQA Laboratory
ABN 21 61339 7934 Date: 10-7-23

Form R26 July 2021

Page 24

ABN 21 613397934 CQA Laboratory P.O. Box 1225, Nambour QlId 4560

   

6 Mill Lane Nambour
Civil Quality Assurance Pty itd T/A For all Geotechnical Engineering and Civil Testing
Ph 0429674334 Servicing South East Queensland

Tests and sampling results relate only to the items tested or sampled. results applies to the sample received/( abnormalities may contribute to the report being
compromised) Reports shall not be reproduced except in full

 

 

 

 

 

 

Test Report
CQA Laboratory Accredited for compliance with ISO/IEC 17025 - testing
Project:- 193 Sankeys Rd Requested By: L. Robins
Federal Date Tested: 30-6-23
Client: Lachlan Robins Report No.: A191
Laboratory Test Procedure: AS1289 3.6.1 soil classification tests-determination of the particle size distribution of a soil-standard method of

analysis by sieving, AS1289 3.9.2 Soil classification tests- determination of the cone liquid limit of soil-one point
method, AS1289 3.4.1 Soil classification tests-determination of the linear shrinkage of a soil-standard method.

 

Sample Method: AS1289.1.2.1 (6) hand augured bore hole sample method
Date Sampled: 30-6-23

Sample/ Material Description: BH2 200-500

Material Source: see attached Bore hole

Nominal Size(mm): <0.425mm

Liquid Limit (%): 38.5

Linear Shrinkage (%): 14.5

Percentage of material retained on
0.425mm sieve (%): 34.5

Tests and sampling results relate only to the items tested or sampled. results applies to the sample received/( abnormalities may contribute to the report being
compromised) Reports shall not be reproduced except in full

NATA Accredited facility No.: 20084 —_

COA Laboratory Signatory, C_./ Ca
ABN 21 613397934

6 Mill Lane Nambour C. Templeton
Form R1 July 2021 Date Reported: 10-7-23

Page 25

ABN 21 613397934 CQA Laboratory P.O. Box 1225, Nambour Qld 4560
6 Mill Lane Nambour

 

Civil Quality Assurance Pty Ltd T/A For all Geotechnical Engineering and Civil Testing
Ph 0429674334 Servicing Queensland

Test Report
CQA Laboratory Accredited for compliance with ISO/IEC 17025 - testin:

Dynamic Cone Penetrometer AS1289 6.3.2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Project:- 193 Sankeys Rd Requested By:L. Robins
Federal Date Tested: 30-6-23
Client: Lachlan Robins Report No.: A191
Laboratory Test Procedure: AS1289 6.3.2
Reduced ground level at test site(mm): 00
Moisture Condition: moist
Sample/ Material Description: See attached
Water Table(mm): na
Depth below surface at commencement of Penetration(mm): 0.0
Depth Location of test
(mm) Blows/100mm
Location | Pl at Approx. P2 at Approx. Approx. Approx. Approx.
KPA KPA KPA KPA KPA
BH2 equivalent BH3 equivalent equivalent equivalent equivalent
00 00 00
100 3 75 3 75
200 3 75 3 75
300 4 100 3 75
400 5 125 4 100
500 8 200 6 150
600 12 300 10 250
700 12 300 10 250
800 12 300 12 300
900 a =
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900
2000

 

 

 

 

 

 

 

 

 

 

 

 

 

Tests and sampling results relate only to the items tested or sampled. results applies to the sample received/( abnormalities may contribute to the report
being compromised) Reports shall not be reproduced except in full. KPa have been developed in

=
CQA Laboratory ABN 21 613397934 Approved Person: Cof

6 Mill Lane Nambour C. Templeton

Form R5 July 2021 Date Reported: 10-7-23

Page 26

ABN 21 613397934
Ph. 0429674334

Project:_193 Sankeys Rd
Federal
Client: _Lachlan Robins

 

P.O. Box 1225, Nambour Qld 4560

For all Civil Testing
Servicing South East Queensland

TEST REPORT

Requested By:_L. Robins
Date Tested: _30-6-23
Report No. A191

 

Field Test Procedure: AS/NZ 1547:2000

Sample method: Hand Auger Bore Hole

Hole Number: TP1 TP2 TP3
Radius of all holes(mm): 100 100 100
Depth of Holes(mm): 600 600 600
Impermeable Layer: n/a n/a n/a
Depth of water in Hole(mm): 250 250 250
Site Vegetation: Heavily treed with small shrubs
Soil Moisture: moist moist moist
What is the water table: n/a n/a n/a
Soil Classification see Bhl
Permeameter readings(mm/Hr): 25 25 aa

Permeameter Diameter: 150mm

6 Mill Lane Nambour

Form 4A September 2016

Signatory: C. / —
C. Templeton &

Date: 10-7-23

Page 27

Appendix C — Site Photographs

 

193 Sankeys Rd Slope Stability Certification
July 2023

Page 28

Photo 1:   Photo 2:                        Photo 3:
.          .




Photo 4:   Photo 5:                        Photo 6:




                                                        SITE PHOTOGRAPHS
                      Date: 17 July 2023                 LACHLAN ROBINS

                                                      193 Sankeys Road, Federal

Page 29

  Appendix D - Practice Note Guidelines
  for Landslide Risk Management 2007




193 Sankeys Rd Slope Stability Certification
                                               July 2023
   `

Page 30

                 AUSTRALIAN GEOGUIDE LR8 (CONSTRUCTION PRACTICE)
HILLSIDE CONSTRUCTION PRACTICE
Sensible development practices are required when building on hillsides, particularly if the hillside has more than a low
risk of instability (GeoGuide LR7). Only building techniques intended to maintain, or reduce, the overall level of landslide
risk should be considered. Examples of good hillside construction practice are illustrated below.




WHY ARE THESE PRACTICES GOOD?
Roadways and parking areas - are paved and incorporate kerbs which prevent water discharging straight into the
hillside (GeoGuide LR5).
Cuttings - are supported by retaining walls (GeoGuide LR6).
Retaining walls - are engineer designed to withstand the lateral earth pressures and surcharges expected, and include
drains to prevent water pressures developing in the backfill. Where the ground slopes steeply down towards the high
side of a retaining wall, the disturbing force (see GeoGuide LR6) can be two or more times that in level ground.
Retaining walls must be designed taking these forces into account.
Sewage - whether treated or not is either taken away in pipes or contained in properly founded tanks so it cannot soak
into the ground.
Surface water - from roofs and other hard surfaces is piped away to a suitable discharge point rather than being allowed
to infiltrate into the ground. Preferably, the discharge point will be in a natural creek where ground water exits, rather
than enters, the ground. Shallow, lined, drains on the surface can fulfil the same purpose (GeoGuide LR5).
Surface loads - are minimised. No fill embankments have been built. The house is a lightweight structure. Foundation
loads have been taken down below the level at which a landslide is likely to occur and, preferably, to rock. This sort of
construction is probably not applicable to soil slopes (GeoGuide LR3). If you are uncertain whether your site has rock
near the surface, or is essentially a soil slope, you should engage a geotechnical practitioner to find out.
Flexible structures - have been used because they can tolerate a certain amount of movement with minimal signs of
distress and maintain their functionality.
Vegetation clearance - on soil slopes has been kept to a reasonable minimum. Trees, and to a lesser extent smaller
vegetation, take large quantities of water out of the ground every day. This lowers the ground water table, which in turn
helps to maintain the stability of the slope. Large scale clearing can result in a rise in water table with a consequent
increase in the likelihood of a landslide (GeoGuide LR5). An exception may have to be made to this rule on steep rock
slopes where trees have little effect on the water table, but their roots pose a landslide hazard by dislodging boulders.
Possible effects of ignoring good construction practices are illustrated on page 2. Unfortunately, these poor construction
practices are not as unusual as you might think and are often chosen because, on the face of it, they will save the
developer, or owner, money. You should not lose sight of the fact that the cost and anguish associated with any one of
the disasters illustrated, is likely to more than wipe out any apparent savings at the outset.

                                    ADOPT GOOD PRACTICE ON HILLSIDE SITES




174                        Australian Geomechanics Vol 42 No 1 March 2007

Page 31

                   AUSTRALIAN GEOGUIDE LR8 (CONSTRUCTION PRACTICE)




WHY ARE THESE PRACTICES POOR?
Roadways and parking areas - are unsurfaced and lack proper table drains (gutters) causing surface water to pond and
soak into the ground.
Cut and fill - has been used to balance earthworks quantities and level the site leaving unstable cut faces and added
large surface loads to the ground. Failure to compact the fill properly has led to settlement, which will probably continue
for several years after completion. The house and pool have been built on the fill and have settled with it and cracked.
Leakage from the cracked pool and the applied surface loads from the fill have combined to cause landslides.
Retaining walls - have been avoided, to minimise cost, and hand placed rock walls used instead. Without applying
engineering design principles, the walls have failed to provide the required support to the ground and have failed,
creating a very dangerous situation.
A heavy, rigid, house - has been built on shallow, conventional, footings. Not only has the brickwork cracked because
of the resulting ground movements, but it has also become involved in a man-made landslide.
Soak-away drainage - has been used for sewage and surface water run-off from roofs and pavements. This water
soaks into the ground and raises the water table (GeoGuide LR5). Subsoil drains that run along the contours should be
avoided for the same reason. If felt necessary, subsoil drains should run steeply downhill in a chevron, or herring bone,
pattern. This may conflict with the requirements for effluent and surface water disposal (GeoGuide LR9) and if so, you
will need to seek professional advice.
Rock debris - from landslides higher up on the slope seems likely to pass through the site. Such locations are often
referred to by geotechnical practitioners as "debris flow paths". Rock is normally even denser than ordinary fill, so even
quite modest boulders are likely to weigh many tonnes and do a lot of damage once they start to roll. Boulders have
been known to travel hundreds of metres downhill leaving behind a trail of destruction.
Vegetation - has been completely cleared, leading to a possible rise in the water table and increased landslide risk
(GeoGuide LR5).
      DON'T CUT CORNERS ON HILLSIDE SITES - OBTAIN ADVICE FROM A GEOTECHNICAL PRACTITIONER
More information relevant to your particular situation may be found in other Australian GeoGuides:
    •    GeoGuide LR1 - Introduction                                     •   GeoGuide LR6 - Retaining Walls
    •    GeoGuide LR2 - Landslides                                       •   GeoGuide LR7 - Landslide Risk
    •    GeoGuide LR3 - Landslides in Soil                               •   GeoGuide LR9 - Effluent & Surface Water Disposal
    •    GeoGuide LR4 - Landslides in Rock                                   GeoGuide LR10 - Coastal Landslides
    •    GeoGuide LR5 - Water & Drainage                                 •   GeoGuide LR11 - Record Keeping
The Australian GeoGuides (LR series) are a set of publications intended for property owners; local councils; planning authorities;
developers; insurers; lawyers and, in fact, anyone who lives with, or has an interest in, a natural or engineered slope, a cutting, or an
excavation. They are intended to help you understand why slopes and retaining structures can be a hazard and what can be done with
appropriate professional advice and local council approval (if required) to remove, reduce, or minimise the risk they represent. The
GeoGuides have been prepared by the Australian Geomechanics Society, a specialist technical society within Engineers Australia, the
national peak body for all engineering disciplines in Australia, whose members are professional geotechnical engineers and engineering
geologists with a particular interest in ground engineering. The GeoGuides have been funded under the Australian governments’
National Disaster Mitigation Program.




                              Australian Geomechanics Vol 42 No 1 March 2007                                              175

Used in these records

About this file

File size
7.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix G - Slope Stability Certification Report.pdf · 7.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.