Council archive · source document
Appendix G - Slope Stability Certification Report · MCU25/0022
Civil Quality Assurance T/A _ ABN 21 613397934 Civil Quality Assurance Pty Ltd PH 0429 674334 Project:__193 Sankeys Rd Federal Client: __ Lachlan Robins P.O. Box 1225, Nambour Qld 4560 For all Civil Testing Servicing South East Queensland Requested By:__L.Robins Date Tested:__30-6-23 Report No.:__A191 Drilling Method: Hand Augured bore hole Bore Hole No.:2 Depth Description Comment Mm 00 Silty CLAY, medium to high plasticity, brown, some fine gravel/sand and organics present, 300 500 moist, soft to firm (CI-CH) SHALE STONE, fractured, light red/brown, quartz present, moist, weak Hole Terminated in shale stone ‘Tests and sampling results relate only to the items tested or sampled. results applies to the sample received/( abnormalities may contribute to the report being compromised) Reports shall not be reproduced except in full 6 Mill Lane Nambour CQA Laboratory ABN 21 61339 7934 Form R26 July 2021 jes Approved Person: ec of C. Templeton Date: 10-7-23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix G - Slope Stability Certification Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.