Skip to the record
Every meeting, every word.

Original source · versioned page text

Ltr-20190925-IR Response-Noosa Marketplace_FINAL (1)

of 95

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

              a. including current conditions;
              b. which include clearly defined uses under The Noosa Plan for each tenancy and at a
                 minimum, anchor tenants identified; and
              c. any changes to the proposed configuration and format of uses.
Response to sub-item 18:
A full response and additional detail with accompanying cover letter is provided by Cambray
Consulting and included in Appendix F. The following summarises the response to sub-item 18.
Section 5.0 (pg10) of the revised traffic assessment has considered the current conditions, the
potential land uses for each tenancy and the specific configuration and format of uses.
In summary, the findings include:

•     An updated swept path and servicing assessments have been prepared and are included in the
      revised Traffic Impact Assessment;

•     The proposed servicing strategy is appropriate for the proposed development; and

•     The development can accommodate independent servicing for the larger showroom tenants with
      shared loading areas available for the smaller retail tenancies.
The traffic generation aspects are covered in Section 9.3 of the report and conclude that the net
change in traffic demands as a result of the Proposed Development will be relatively minor when
compared with the Previous Approval. It is noted that no external road network upgrades were
required as part of that application. The key factors include:

•     The office uses on site are not expected to generate significant vehicle trips during the weekend;

•     The food and drink outlet tenancies on site are expected to provide an ancillary function and
      therefore not expected to generate significant vehicle trips during the adjacent road peaks; and

•     That not all trips will be new to the local road network, with some trips to and from the
      development from motorists travelling past or in close proximity as part of another trip (e.g.
      travelling home from work).
Overall, the proposed development is expected to generate approximately 220 fewer trips that the
previous Masters approval in the Saturday peak period. The development is also expected to generate
comparable trips to this approval in the Thursday PM Peak.
Accordingly, as the proposed development is expected to generate lower traffic volumes that the
previous approval, no road network upgrades are considered to be required to support the proposed
development.

ISSUE 6: SERVICE VEHICLES
A full response and additional detail with accompanying cover letter is provided by Cambray
Consulting and included in Appendix F. The following contextualises the response to sub-items 19
to 22
The traffic report recommends that servicing by HRV’s and AV’s occur outside of peak trading times
due to manoeuvring space requirements. This raises concerns




    Ltr-20190925-IR Response-Noosa Marketplace_FINAL                                                     55
Log in to download the original file

Ltr-20190925-IR Response-Noosa Marketplace_FINAL (1).pdf · 8.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.