− Despite this location being inundated by floodwaters,the maximum 1% AEP water surface
level at the northern boundary is approximately 1.2 metres below the Eenie Creek Road
pavement level in the developed case. Therefore, the proposed development further
enhances the existing detention function with no additional risk to persons, property,
environment or infrastructure at this location. Due to the enhancement of the natural detention
basin by the development and site drainage improvements, reductions in peak flood levels
during the 1% AEP event are indicated along a significant section of Hofmann Drive. Figure
47 demonstrates the difference in water surface profiles between the existing and developed
case 1% AEP events at this location;
Figure 48 – P4 Surface Profiles
Source: Cardno
o The designated environmental area downstream of the site that shows minor impacts is
subject to inundation in the existing case for all rainfall events. To the south at the legal
point of discharge, (environmental reserve) there are minor increases in flood levels
during the 39% and 20% AEP events. These increases are caused by improvements to
the drainage system capturing water that currently flows along Hofmann Drive to Rene
Street and passing it under Hofmann Drive into these areas. The insignificance of this
minor increase is shown in Figure 49 below;
Ltr-20190925-IR Response-Noosa Marketplace_FINAL 81
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.