response to information request updated letter - pomona subdivision 19.11.2021

of 9

Page text shows just the words. Original shows the document exactly as it was published.

19 November 2021


Patrick Murphy
Noosa Council
[email protected]


RE:    Response to Information Request RAL21/0017 – 25 Pavilion Dr, Pomona


Council issued a further advice request on 13 September 2021. The applicant provides
the following additional information in response to the items:


   1. The waterway to be clearly identified on all plans.
   2. Amended plans which provide for 10 metres of rehabilitation either side of
      the waterway.
   3. The bio-basin to be re-located outside of the 10-metre-wide waterway
      rehabilitation area.

Please find attached response from Joshua Lee – North Coast Environmental Services
including:

   Revegetation either side of the drainage feature is not expected to significantly enhance water
   quality outcomes as compared to the existing grass cover about, and within, the drainage
   feature. Furthermore, no vegetative riparian values are associated with the drainage feature
   within the site or within adjoining sites to the immediate north and south. The request to
   revegetate the drainage feature is therefore not considered a priority conservation outcome for
   the site….It is noted a very significant net gain in riparian habitat; approximately 0.38ha, will
   arise as a result of the development given the proposal to rehabilitate the currently denuded
   Riparian Protection Area in the west of the site.




We seek to further discuss the matter with Council’s environmental officer and Coordinator
of Development Assessment with an onsite meeting.
Log in to download the original file

response to information request updated letter - pomona subdivision 19.11.2021.pdf · 1.8 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 8 pages

Page 2

   4. Provide an accurate plan of the 1%AEP inundation extent at year 2100 for the
      development site and demonstrate that all proposed filling is located outside
      of this inundation extent.

Peak Urban have directly addressed this matter in their updated Stormwater Management
Plan dated 28 October 2021.

   The corner of Lot 10 is shown to be partially inundation in the 1% (2100) AEP (noting
   it is flood free in smaller events including the 1% AEP). A flood impact assessment
   was completed using NSC “Pomona Flood Model” in order to demonstrate no off-site
   impacts, no loss of floodplain storage and compliance with the Flood Overlay Code.
   The proposed 3m wide open drain along the southern boundary to Lot 10 is able to
   manage the flood flows through this part of the site. Refer to Section 2.2 for this
   assessment.

   5. Either amend the proposal plans and preliminary earthworks plans to
      demonstrate no filling within the 1%AEP (2100) inundation extent, or provide
      a flood impact assessment which demonstrates no loss of floodplain storage
      and no off-site flood impacts associated with the filling.

Peak Urban have directly addressed this matter in their updated Stormwater Management
Plan dated 28 October 2021.

   The corner of Lot 10 is shown to be partially inundation in the 1% (2100) AEP (noting
   it is flood free in smaller events including the 1% AEP). A flood impact assessment
   was completed using NSC “Pomona Flood Model” in order to demonstrate no off-site
   impacts, no loss of floodplain storage and compliance with the Flood Overlay Code.
   The proposed 3m wide open drain along the southern boundary to Lot 10 is able to
   manage the flood flows through this part of the site. An additional shallow cut area is
   to be provided in Lot 10 to off-set the loss of flood plain storage. Refer to Section 2.2
   for this assessment.

   6. Either amend the plans to ensure all works are fully contained within the
      subject lot, or If works within Lot 4 RP809059 are required to support the
      application, then amend the application to include this lot and include
      landowners consent.

All works are to be fully contained within the subject site as per the Service Layout Plan
by TODS dated 11/11/2021.




                                                                               Page 2 of 9

Page 3

   7. Provide a detailed site survey, with 0.25m contour intervals, in order to
      illustrate the existing drainage patterns on the site.

The detailed contour survey is included with the response and referenced within Peak
Urban’s Flood Storm Water Management Plan.




                                                                        Page 3 of 9

Page 4

   8. Justify how the proposed discharge from the bioretention basin does not
      represent a concentration of flow onto the neighbouring lot and how
      discharge rights can be secured over the neighbouring lot in order to ensure
      that the outlet from the bioretention basin will not be impeded in the future.
      Is there any reason why the discharge from the bioretention basin cannot be
      directed onto the balance of proposed lot 10 instead, in order to avoid these
      issues with the neighbouring lot?

Preliminary Drawings have been prepared for the proposed bio-retention basin. The size
of the basin is based on parameters contain in the Stormwater Management Plan prepared
by Peak Urban. TODs plans demonstrate the required bio basin filter area (120m2) and
storage volume can be provided with the allocated space in the plan of development.

1 in 4 batters have been adopted throughout except for a 1 in 2 batter on the northern side
of the basin. There should be no need for any retaining walls in the bio basin. The outlet
from the basin is directed to the west towards the creek as well as discharging into the
balance area of lot 10 in a non-worsening manner.

   9. Provide revised sizing/modelling and associated engineering drawings and
      reporting for the detention storage proposed for the development site,
      which achieves the following:
         a. Includes analysis for the 1%AEP (2100) event
         b. Is undertaken using the ensemble storms approach of ARR2019
         c. Clarify the continuing loss assumed for impervious site areas. The
             pervious initial loss reported in the SWMP appears to be much lower
             than the recommendations of either QUDM or ARR2019 and is likely
             to result in under-sizing of the detention storage due to an over-
             estimate of the pre-development peak flows. Justify the assumed
             initial loss or adopt a revised value consistent with QUDM and
             ARR2019
         d. Update the basin design to ensure the freeboard requirements of
             QUDM are achieved for the 1%AEP (2100) event
         e. Demonstrates no increase in peak flows for all events up to and
             including the 1%AEP (2100) event, for the range of durations
             applicable to the downstream land, not just the critical duration at
             the site boundary
         f. Consider whether detention storage is necessary if discharges from
             the bioretention basin are directed to the West into the balance lot
             10, rather than the neighbouring property.

Peak Urban have directly addressed this matter in their updated Stormwater Management
Plan dated 28 October 2021.

       a.      Updated to include the 1% (2100) AEP event.
       b.      Modelling completed using ARR2019 ensemble storms.
       c.      Sensitivity assessment of losses completed using 30mm initial loss (refer
               Section 2.1.5). Results achieve a similar outcome to the smaller initial loss
               of 10mm originally used.
       d.      Discussion of freeboard in the 1% (2100) AEP is presented in Section 2.1.4.
       e.      Peak flows for a range of durations are presented in Appendix B. This
               shows that the peak is critical with respect to non-worsening.
       f.      As discussed in Section 2.1.4, an existing flow path direct runoff north and
               into an existing dam. This discharge point has been maintained so as to
               not impact the water catchment of these farm dams. Non-worsening has
               been achieved in the smaller events to this property. In the larger events,
               the small increase noted would be drowned out by flooding from Cooroora
               Creek.

                                                                               Page 4 of 9

Page 5

   10. Provide an updated MUSIC model and SWMP which includes all catchment
       areas flowing to the bioretention basin in the model.

Peak Urban have directly addressed this matter in their updated Stormwater Management
Plan dated 28 October 2021.

   MUSIC modelling has been updated to reflect this request and detailed in Section 3.
   Bioretention filter area has reduced to 80m2.

   11. Provide travel paths for the required waste collection vehicle, demonstrating
       how it will manoeuvre on site without having to use more than a 3 point turn
       to turn around.

The garbage truck turning plan for the turning head is included as part of the revised
engineering design.




   12. Provide a plan indicating all the vegetation, on road reserve, required to be
       cleared to ensure safe sightlines.

TODs provide the following comments regarding the site lines and vegetation:

       The road reserve boundary is set back 6m from the existing nominal kerb
       alignment meaning there is adequate space for a car to stop and see vehicles on
       Pavilion Street without being impacted by property fences. The required safe
       intersection distance (SISD) in each direction for vehicles exiting the new road,
       when taken 3-5 back from the nominal kerb line generally meets the minimum
       requirements in Austroads Part 4A.

       The standard design requirements as set out in table 3.2 for a 60kph design speed
       is between 114-123m. The visibility to the north is unobstructed and exceeds
       250m. The visibility to the south is slightly impacted by the low crest at the
       intersection of Sandy Street and a sag in Pavilion Street approximately 115 south
       of Sandy Street in front of No 20 Pavilion Street. The visibility in this direction is
       approximately 103m (adjacent to the entry to the caravan park), however it should
                                                                                Page 5 of 9

Page 6

be noted that given this is an existing street Extended Design Domain standards
can be adopted, which would reduce the visibility requirements to between 81 and
89m. The visibility in this direction exceeds the EDD sight distance requirements.
A site check has confirmed that no clearing of existing vegetation is required – refer
photos below.




     Sight Visibility to the South of proposed intersection shown below




 Sight Visibility to the North of proposed intersection shown below




                                                                         Page 6 of 9

Page 7

   13. Noting that all retaining structures must be within the lot they support, or
       otherwise be covered under an easement, provide additional detail on the
       proposed retaining walls. The detail must be prepared by a Registered
       Professional Engineer of Queensland and include but not be limited to:

           a. cross sections at the highest point of each of the proposed retaining
              structures indicating the location of the walls and foundations in
              relation to the property boundaries, the proposed building pad and
              finished ground levels;
           b. the type of wall construction (material, foundations, etc.);
           c. the structures required to collect and convey existing overland flows
              that are impacted on by the construction of the walls;
           d. any fencing to be installed on top of or beside the walls;
           e. the location of any services, above or below ground, adjacent to the
              proposed walls.

The retaining wall details are included as part of the updated TOD engineering plans and
specific comment below:

       The preliminary drawings show proposed earthworks for the site that includes
       providing level house pads for future owners to build on. We have shown indicative
       locations and heights for retaining walls on the preliminary drawings; however it is
       planned to minimise the extent of retaining walls for aesthetic and costs reasons.

       Full extent of retaining walls will be determined during the detailed
       design/Operational Works phase. A typical detail for a concrete sleeper wall has
       been included in the preliminary engineering drawings, however it should be noted
       that as these are proprietary items they are designed and certified by the
       supplier/contractors RPEQ.

       In order to construct the bio retention basin, it will be necessary to import fill to the
       site to lift the blocks and road level above the basin levels. The amount of fill will
       be refined during the detail design.




                                                                                  Page 7 of 9

Page 8

   14. Provide RPEQ written certification, certifying that the proposed filling
       works and retaining structures, will not cause a worsening of stormwater
       conditions by adversely altering stormwater drainage characteristics
       external to the site, including, but not limited to:
          a. additional ponding on neighbouring properties;
          b. increased runoff onto neighbouring properties;
          c. redirect overland flows.

TODs plans have been designed in coordination with Peak Urban’s Stormwater
Management Plan, which conclude:

   It has been demonstrated that non-worsening of peak flows has been achieved
   to the discharge point for events up to the 10% AEP event (refer Table 2-7).
   The results show that there is non-worsening for events up the 5% AEP, with a
   minor increase noted in the larger events. The intent of sizing the detention
   basin is to mitigate flows up to the 10% AEP storm event to ensure non-
   worsening of discharges into the downstream flow path. In larger events, flows
   from the site will start to sheet flow across the rear of the site to Cooroora Creek.

   As the discharge point for the site becomes inundated from Cooroora Creek
   flooding in the major storm event, it is considered that the very minor increases
   noted from the site become inconsequential as a result of downstream site
   being drowned out by creek flooding. The catchment size of Cooroora Creek
   reporting past the site is approximately 1,400 ha. The very minor increases in
   peak flows in the major event would be considered to not result in any
   quantifiable change to downstream flooding conditions.

   15. Provide cross sections – including the finished ground levels of the
       proposed works and neighbouring properties – for the sections marked in
       the snippet below, including a 2m wide footapth:

Updated cross sections are provided through the relevant areas with finished levels.




   16. Provide Unity Water’s written approval for a low-pressure sewer system for
       the proposed development.
   17. If the proposed lots cannot be connected to sewerage reticulation,
       amended plans are required with minimum lots sizes of 2,000m2.

TODs provide the following comments in regard to the Unitywater sewer connections.

There is an existing sewer main traversing the site aligned with the rear of existing
dwellings/properties along Pavilion Street. Noosa A H & I Society Inc (Pomona Show
Grounds) have given their in-principle support to permit the extension of the existing
gravity sewer main within their property to allow the new lots to be fully services by a

                                                                             Page 8 of 9

Page 9

gravity sewer main. Unity Water have confirmed that if the agreement between JNE
Developments Pty Ltd and Noosa A H & I Society Inc cannot be concluded then Unity
Water will permit low-pressure sewer system as an alternative system. As such we have
revised our preliminary engineering drawings to show the proposed gravity sewer. It
should be noted that this sewer line can be extended in the future to service the
development of lots to the north the subject site.

    18. Provide details on the easements proposed to be extinguished, including,
        but not limited to:
           a. Purpose of the easements;
           b. Reason for extinguish them;
           c. Benefited party(ies) written agreeing to the extinguishment of these
               easements.

Agreement has been granted from the existing property owner to re-direct their
stormwater to the new street - so the stormwater easement (Easement C in lot 21
SP316902) is no longer required.

Easement D in lot 21 SP 316902 is for sewer, Unity Water have confirmed that
Easement D can be extinguished to reflect the new road and lot layout.


----------------------------------------------------------------------------------------------------------------------
Pursuant to the Development Assessment Rules, the applicant has given the assessment
manager the information requested in the information request. Please proceed with the
assessment of the application at your earliest convenience.

If you have any further queries in relation to the above, please do not hesitate to contact
myself.

Regards,




Jack Lewis B.Sc Hons UNSW M.Plan Otago MPIA MQELA
Planner/Director
Pivotal Perspective Pty Ltd
0406 334 227




                                                                                                     Page 9 of 9

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.