Earthworks Code

Table 9.4.2.3 - Criteria for assessment
Effects of works Table 9.4.2.3 Criteria for assessment (part)

Performance outcomes                               Acceptable Outcomes
Assessable Development
Effects of works

Drainage
PO1                                                AO1                                                   Complies
Finished surface levels ensure land is free draining. Filled or excavated areas have a minimum gradient The Bulk earthworks will be designed to the prevent
                                                   of 0.5% and drain to Council’s stormwater             ponding on site and on adjoining premises. All
                                                   infrastructure where available, or where stormwater stormwater surface runoff and subsoils flows will be
                                                   infrastructure is not available, toward the street.   directed to the lawful point of discharge. Refer to
                                                                                                         Appendix E.
Log in to download the original file

7. Earthworks Code.pdf · 48 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 9 pages

Page 2

Performance outcomes                          Acceptable Outcomes
Hydraulics
PO2
Change to the levels on site do not have an   No acceptable outcome provided   Complies

adverse impact on the flooding and drainage
                                                                               The existing drainage characteristics of the site and
characteristics off-site.
                                                                               surrounding area has been considered as part of
                                                                               the Engineering assessment for this proposal. The
                                                                               proposal ensure surrounding properties and
                                                                               downstream infrastructure and waterways are not
                                                                               adversely impacted by the proposed development.

Page 3

Performance outcomes                                   Acceptable Outcomes
Geotechnical considerations                                                                                  Complies
PO3                                                    AO3.1
                                                                                                             All filling will be undertaken in accordance with
Earthworks do not result in geotechnical instability   Filling works are undertaken in accordance with
                                                                                                             Council’s PSP6 – Engineering Design Standards –
on-site or to nearby premises.                         Council’s Planning Scheme Policy PSP6
                                                                                                             Roads and Drainage & Earthworks. All excavation
                                                       Engineering design standards - roads, drainage and
                                                                                                             will be undertaken with no adverse impact on
                                                       earthworks.
                                                                                                             neighbouring properties or surrounding
                                                                                                             Infrastructure.




                                                       AO3.2                                                 Complies
                                                       Where the filling is for residential, commercial or   Refer above.
                                                       industrial purposes the works comply with
                                                       Australian Standard - Guidelines for earthworks on
                                                       commercial & residential development.

Page 4

Performance outcomes                               Acceptable Outcomes
Local amenity
PO4                                                AO4.1                                                  Complies
Undertaking earthworks does not adversely impact The following control measures are implemented— Regular watering will be undertaken as required
on the amenity of the local area by way of dust,                                                          during the construction phase to minimise any dust
noise or visual amenity.                                    1. regular water spraying of exposed          emissions. An ESC plan has been prepared for the
                                                                areas to suppress dust;                   construction phase as part of the Engineer report
                                                            2. provision of dust stabilised or sealed     and plans. (Refer to Appendix E).
                                                                internal roads;
                                                            3. protective covering of exposed areas       All disturbed areas will be stablished, should they
                                                                that are left for more than 2 weeks;      be exposed for periods exceeding 2 weeks.
                                                                and
                                                            4. unless a development permit provides
                                                                otherwise, disturbed areas are
                                                                revegetated using species identified in
                                                                Council's Planning Scheme
                                                                Policy PSP2 Landscaping.



                                                   AO4.2                                                  Complies
                                                   Earthworks are undertaken only during the hours of Filling and earthworks will only be undertaken
                                                   7:00am to 6:00pm, Monday to Friday and 7:00am to between the hours nominated in AO4.2.
                                                   3:00pm on Saturday. No work is undertaken on
                                                   Sunday or public holidays.

Page 5

Performance outcomes                            Acceptable Outcomes
Vegetative waste
PO5                                             AO5.1                                                  Complies
Vegetation cleared from a development site is   Cleared vegetation is transported off-site for         Any cleared vegetation will be required to be
disposed of in an environmentally responsible   disposal in an approved green waste disposal           transported off site to an approved green waste
manner.                                         facility.                                              disposal facility.


                                                AO5.2                                                  Not applicable
                                                Cleared vegetation is mulched on-site and reused       Any cleared vegetation will be required to be
                                                for landscaping of the finished development.           transported off site to an approved green waste
                                                                                                       disposal facility.



                                                AO5.3
                                                                                                       Not applicable
                                                Cleared vegetation is disposed of for the purpose of
                                                                                                       Any cleared vegetation will be required to be
                                                firewood.
                                                                                                       transported off site to an approved green waste
                                                                                                       disposal facility.


                                                AO5.4                                                  Not applicable
                                                Disposal of vegetative waste by burning off is         Any cleared vegetation will be required to be
                                                avoided.                                               transported off site to an approved green waste
                                                                                                       disposal facility.

Page 6

Performance outcomes                                   Acceptable Outcomes
Managing contamination risk
PO6                                                    AO6.1                                                     Complies
Materials used as fill are suitable for development    Fill material is solid clean earth, free of putrescible   Any imported fill will be clean fill and free of any
and future use of the land and filling or excavation   or refuse material, vegetation, acid sulfate soils,       contaminants.
works do not result in the contamination of land.      building or construction material or other material or
                                                       contaminants.


                                                       AO6.2                                                     Complies
                                                       The site is not on the contaminated land register.        The site is not listed on a contaminated land
                                                                                                                 register.




Haulage activity and amenity
PO7
Haulage of material to and from a site ensures—        No acceptable outcome provided                            Complies
                                                                                                                 Haul routes from trucks used to transport fill/spoil
         1. minimal disturbance to neighbouring                                                                  and material to and from the site will only use major
             properties and properties along the                                                                 roads as required.
             haulage route; and
         2. Council’s road infrastructure including
             pavements is not adversely affected.

Page 7

Performance outcomes                                  Acceptable Outcomes
Extent of earthworks
PO8                                                   AO8                                                    Complies

The layout of the development provides adequate,      All earthworks, including cut and fill batters,        All earthworks will be contained within the subject

clearly defined and easily accessible—                retaining walls and the like are contained within the site. Any minor earthworks undertaken external to
                                                      subject site.                                         the site will only be undertaken after all approvals
         1. on-site vehicle parking and                                                                      and/or consent is obtained from Council and/or
                manoeuvring areas; and                                                                       adjoining property owners.
         2. loading and manoeuvring areas for
                delivery and service vehicles.


Sloping sites
PO9                                                   AO9                                                    Complies

On sloping sites development follows the natural      Cut or fill is less than 1.5 metres in depth relative to The proposed cut will be less than 1.5m in depth.
landform wherever practical and excavation or filling the natural ground level.                                Refer to Engineering plans in Appendix B.

is minimal.


Infrastructure protection
PO10                                                                                                         Complies

Earthworks and vehicular access do not adversely      No acceptable outcome provided                         Prior to construction the contractor will confirm the

impact on the capacity, operations and                                                                       correct locations of all existing services whether

maintenance of existing infrastructure.                                                                      indicated or not on the plans. The construction of
                                                                                                             the proposed development will ensure the
                                                                                                             protection of all existing services or public utilities.

Page 8

Performance outcomes                          Acceptable Outcomes
Environmental protection
PO11
Earthworks minimise any adverse impact upon   No acceptable outcome provided   Complies

groundwater, watercourses, drainage lines,                                     An Erosion and Sediment Control Plan has been

wetlands, and native vegetation.                                               prepared and will be adhered to for the
                                                                               management of the sediment laden stormwater
                                                                               runoff during the construction phase in accordance
                                                                               with Council’s PSP6
                                                                               – Engineering Design Standards – Roads and
                                                                               Drainage & Earthworks.

Page 9

Dams
PO12                                                AO12.1                                                   Not applicable
Dam location and construction does not impact       Where the site is in the Rural zone—
upon neighbouring properties or road reserves, in
terms of—                                                    1. the land has a slope of less than 25%
                                                                 (1:4);
         1. hydrology;                                       2. the earthworks including cut and fill
         2. alteration of existing overland flow                 batters and retaining walls are setback
             paths and patterns;                                 a minimum of 50 metres from the
         3. landslide or failure of dam wall; and                property boundary; and
         4. effluent disposal areas.                         3. the size of the lot is greater than 5
                                                                 hectares.



                                                    AO12.2
                                                                                                             Not applicable
                                                    Where the site is in the Rural residential zone or the
                                                    Rural zone and the lot is less than 5 hectares:


                                                             1. the land has a slope of less than 1:6;
                                                             2. the earthworks including cut and fill
                                                                 batters and retaining walls are setback
                                                                 a minimum of 20 metres from the
                                                                 property boundary; and
                                                             3. the dam work involves less than
                                                                 500m³ of material.

Page 10

Performance outcomes                                  Acceptable Outcomes


                                                      AO12.3                                        Complies

                                                      For all other zones—                          All buildings and structures will be located outside

                                                      No acceptable outcome provided                of the zone of influence and building piers and
                                                                                                    footings will be extended below the zone of
                                                                                                    influence for all existing and
                                                                                                    proposed underground stormwater services.




                                                            You have reached the end of the page.

Contents of this section Table 9.4.2.3 - Criteria for assessment

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.