Original source · versioned page text
7. Earthworks Code
Performance outcomes Acceptable Outcomes
Managing contamination risk
PO6 AO6.1 Complies
Materials used as fill are suitable for development Fill material is solid clean earth, free of putrescible Any imported fill will be clean fill and free of any
and future use of the land and filling or excavation or refuse material, vegetation, acid sulfate soils, contaminants.
works do not result in the contamination of land. building or construction material or other material or
contaminants.
AO6.2 Complies
The site is not on the contaminated land register. The site is not listed on a contaminated land
register.
Haulage activity and amenity
PO7
Haulage of material to and from a site ensures— No acceptable outcome provided Complies
Haul routes from trucks used to transport fill/spoil
1. minimal disturbance to neighbouring and material to and from the site will only use major
properties and properties along the roads as required.
haulage route; and
2. Council’s road infrastructure including
pavements is not adversely affected.