Original source · versioned page text
7. Earthworks Code
Performance outcomes Acceptable Outcomes
Environmental protection
PO11
Earthworks minimise any adverse impact upon No acceptable outcome provided Complies
groundwater, watercourses, drainage lines, An Erosion and Sediment Control Plan has been
wetlands, and native vegetation. prepared and will be adhered to for the
management of the sediment laden stormwater
runoff during the construction phase in accordance
with Council’s PSP6
– Engineering Design Standards – Roads and
Drainage & Earthworks.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.