Original source · versioned page text
Planning Application
Attached to the e-mail REC16/0007 Boundary Realignment Application - 183 Blanckensee Road, Black Mountain.
Performance outcomes Acceptable outcomes Response Comment
bank erosion AO4.2 The application of soil absorbed broad spectrum
herbicides does not occur within 50 metres of the defining
(2) water quality by filtering sediments, bank of a watercourse or drainage feature.
nutrients and other pollutants
(3) aquatic habitat
(4) terrestrial habitat.
Soil erosion
PO5 Clearing does not result in: AO5.1 Mechanical clearing: N/A The proposed development does not involve vegetation
(1) mass movement, gully erosion, rill (1) is limited to slopes less than 5 per cent clearing for encroachment.
erosion, sheet erosion, tunnel
(2) retains 50 per cent of the ground cover (dead or
erosion, stream bank erosion, wind
alive) in each 50 by 50 metre (0.25 hectare) area.
erosion, or scalding
(2) any associated loss of chemical,
physical or biological fertility —
including, but not limited to water
holding capacity, soil structure,
organic matter, soil biology and
nutrients
within or outside the lot(s) that are the
subject of the application.
Acid sulfate soils
PO6 Clearing activities do not result in AO6.1 Clearing does not occur in land zone 1, land zone N/A The proposed development does not involve vegetation
disturbance of acid sulfate soils or 2 or land zone 3. clearing for encroachment.
changes to the hydrology of the location OR
that will either:
AO6.2 Clearing in land zone 1, land zone 2 or land zone 3 N/A The proposed development does not involve vegetation
(1) aerate horizons containing iron
in areas below the 5 metre Australian Height Datum only clearing for encroachment.
sulfides, or occurs where:
(2) mobilise acid or metals. (1) it does not involve mechanical clearing
(2) the acid sulfate soils are managed consistent with the
State Planning Policy, Department of State
Development, Infrastructure and Planning,2014, and
with the Soil Management Guidelines in the
Queensland Acid Sulfate Soil Technical Manual,
State development assessment provisions Module 8 — Native vegetation clearing 8.1 Queensland vegetation management state code
23 November 2015 V1.7 Page 33 of 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.