Original source · versioned page text
Planning Application
Attached to the e-mail REC16/0007 Boundary Realignment Application - 183 Blanckensee Road, Black Mountain.
dedicated water tank for fire fighting and
contains not less than 5,000 litres per
dwelling unit;
AND
S13.3 All tanks are fitted with a coupling
suitable for attachment to fire fighting
appliances.
14.192 ENERGY EFFICENCY
O14 The street and lot orientation S14.1 For Community Title Development or The proposal does not involve
facilitates the construction of urban residential development each lot the establishment of buildings or
energy efficient buildings that contains a rectangular house site area structures.
respond to the local climate where the long axis is within 20 degrees of
conditions. AND true North and has minimum dimensions
O15 For residential development, of—
the subdivision design provides for a) if the lot is between 450m2 and 599m2-
the maximum practicable number 10m x 15m; or
of lots with house site areas that— b) if the lot is less than 450m2 - 9m x 15m.
a) maximise solar access to the AND
north in winter; S14.2 Community Title Development lots
b) minimise solar access to the east are generally rectangular in shape and have
and west in the summer; a maximum slope of—
c) maximise access to any a) 10% (1:10); and
prevailing summer breezes; and b) 5% (1:20) when measured from the
d) minimise exposure to prevailing front to the rear of the lot.
winter winds. S15.1 No Solution provided
14.193 INFRASTRUCTURE
O16 Each lot is capable of being S16.1 All lots are connected to power Each proposed allotment
serviced by appropriate levels of— supply and telecommunications services; comprises existing power supply
a) water supply; and telecommunication service.
b) reticulated sewerage;
c) stormwater drainage;
d) power supply; and
e) telecommunications;
O17 The design and provision of S17.1 For lots in urban settlements—power Each proposed allotment
public services and utilities, supply and communications infrastructure comprises existing power supply
including sewerage, water, are provided underground; or and telecommunication service,
electricity, street lighting and S17.2 For lots elsewhere—power supply along with rainwater tanks and
telecommunication services— and communications infrastructure are on-site effluent disposal.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.