Skip to the record
Accept no substitutions.

Original source · versioned page text

Planning Application

Attached to the e-mail REC16/0007 Boundary Realignment Application - 183 Blanckensee Road, Black Mountain.

of 108

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Performance outcomes                          Acceptable outcomes                                              Response   Comment
PO1 Clearing is limited to the extent that    No acceptable outcome is prescribed.                             N/A        The proposal does not involve extractive industry.
is necessary for:
(1) dredging material from the bed of
    any waters
(2) extracting, from a pit or quarry, rock,
    sand, clay, gravel, loam or other
    material
(3) screening, washing, grinding, milling,
    sizing or separating material
    extracted from a pit or quarry
(4) carrying out work that is the natural
    and ordinary consequence of
    carrying out work mentioned in
    subparagraphs (1), (2) and (3)
    above.

Clearing is staged
PO2 Clearing:                                 No acceptable outcome is prescribed.                             N/A        The proposal does not involve extractive industry.
(1) is staged in line with operational
    needs that restrict clearing to the
    current operational area
(2) is limited to the area from which
    material will be extracted, and any
    reasonably associated infrastructure,
    within the term of the development
    approval
(3) cannot occur until all required
    permits are obtained.

Wetlands
PO3 Maintain the current extent of            AO3.1 Clearing does not occur in, or within 100 metres of,       N/A        The proposal does not involve extractive industry.
vegetation associated with any natural        any natural wetland.
wetland to protect:                           OR
(1) water quality by filtering sediments,     AO3.2 Clearing only occurs within 100 metres of any              N/A        The proposal does not involve extractive industry.
                                              natural wetland where:


State development assessment provisions                                Module 8 — Native vegetation clearing                             8.1 Queensland vegetation management state code
23 November 2015 V1.7                                                                                                                                                      Page 8 of 39
Log in to download the original file

Planning Application.pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.