Original source · versioned page text
Planning Application
Attached to the e-mail REC16/0007 Boundary Realignment Application - 183 Blanckensee Road, Black Mountain.
Performance outcomes Acceptable outcomes Response Comment
the disturbance of acid sulfate soils or 2 or land zone 3.
changes to the hydrology of the location OR
that will either:
AO9.2 Clearing in land zone 1, land zone 2 or land zone 3 N/A The proposal does not involve extractive industry.
(1) aerate horizons containing iron in areas below the 5 metre Australian Height Datum only
sulfides, or occurs where:
(2) mobilise acid or metals. (1) it does not involve mechanical clearing
(2) the acid sulfate soils are managed consistent with the
State Planning Policy, Department of State
Development, Infrastructure and Planning, 2014, and
with the Soil Management Guidelines in the
Queensland Acid Sulfate Soil Technical Manual,
Department of Science, Information Technology,
Innovation and the Arts, 2014.
OR
AO9.3 The application is a development application N/A The proposal does not involve extractive industry.
where a local government is the assessment manager.
Table 8.1.6: High value agriculture clearing and irrigated high value agriculture clearing
Performance outcomes Acceptable outcomes Response Comment
High value and irrigated high value agriculture clearing
State development assessment provisions Module 8 — Native vegetation clearing 8.1 Queensland vegetation management state code
23 November 2015 V1.7 Page 12 of 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.