Original source · versioned page text
Planning Application
Attached to the e-mail REC16/0007 Boundary Realignment Application - 183 Blanckensee Road, Black Mountain.
Performance outcomes Acceptable outcomes Response Comment
(3) aquatic habitat AO4.2 Clearing only occurs within any watercourse or N/A The proposal does not involve necessary environmental
drainage feature, or within the relevant distance stipulated clearing.
(4) terrestrial habitat. by Table 2 of the defining bank of any watercourse or
drainage feature where:
or where this is not reasonably possible,
rehabilitate. (1) the clearing does not occur within 5 metres of the
defining bank of any watercourse or drainage feature,
or
(2) the widths stipulated by Table 1 are not exceeded.
OR
AO4.3 Where it can be demonstrated that clearing cannot N/A The proposal does not involve necessary environmental
be reasonably avoided, and the extent of clearing has clearing.
been reasonably minimised, the cleared area is
rehabilitated.
Watercourses and drainage features (natural channel diversion and contaminants removal)
PO5 Maintain vegetation associated with AO5.1 Clearing does not occur: N/A The proposal does not involve necessary environmental
any watercourse or drainage feature to clearing.
protect: (1) within any watercourse or drainage feature, or
(1) bank stability by protecting against (2) within the relevant distances stipulated in Table 2
bank erosion from each defining bank of any watercourse or
drainage feature.
(2) water quality by filtering sediments,
nutrients and other pollutants OR
(3) aquatic habitat AO5.2 Clearing only occurs within any watercourse or N/A The proposal does not involve necessary environmental
drainage feature, or within the relevant distance stipulated clearing.
(4) terrestrial habitat by Table 2 of the defining bank of any watercourse or
or where this is not reasonably possible, drainage feature where:
rehabilitate or maintain the current (1) the clearing does not occur within 5 metres of the
extent. defining bank of any watercourse or drainage feature,
or
(2) the widths stipulated by Table 1 are not exceeded.
OR
AO5.3 Where it can be demonstrated that clearing cannot N/A The proposal does not involve necessary environmental
be reasonably avoided, and the extent of clearing has clearing.
been reasonably minimised, the cleared area is
rehabilitated.
State development assessment provisions Module 8 — Native vegetation clearing 8.1 Queensland vegetation management state code
23 November 2015 V1.7 Page 20 of 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.