Original source · versioned page text
Planning Application
Attached to the e-mail REC16/0007 Boundary Realignment Application - 183 Blanckensee Road, Black Mountain.
Performance outcomes Acceptable outcomes Response Comment
AND
AO2.3 Clearing for access tracks running parallel to a N/A The proposed development does not involve vegetation
natural wetland is not to be located within 10 metres of the clearing.
natural wetland.
Watercourses and drainage features
PO3 Maintain vegetation associated with AO3.1 Mechanical clearing does not occur within 20 N/A The proposed development does not involve vegetation
any watercourse or drainage feature to metres of the defining bank of a watercourse or drainage clearing.
protect: feature.
AND
(1) bank stability by protecting against
bank erosion AO3.2 Clearing only occurs: N/A The proposed development does not involve vegetation
(2) water quality by filtering sediments, (1) within a 1.5 metre radius from the base of the stem of clearing.
nutrients and other pollutants individual non-native or declared plants, or
(3) aquatic habitat (2) to the extent necessary to provide access for the
(4) terrestrial habitat. control of the non-native or declared plant.
AND
AO3.3 Clearing for access tracks running parallel to a N/A The proposed development does not involve vegetation
watercourse or drainage feature are not be located within clearing.
10 metres of the defining bank of the watercourse or
drainage feature.
Soil erosion
PO4 Clearing does not result in: AO4.1 Mechanical clearing retains 50 per cent of the N/A The proposed development does not involve vegetation
ground cover (dead or alive) in each 50 by 50 metre (0.25 clearing.
(1) mass movement, gully erosion, rill hectare) area.
erosion, sheet erosion, tunnel AND
erosion, stream bank erosion, wind
erosion, or scalding AO4.2 New access tracks, necessary to gain access to a N/A The proposed development does not involve vegetation
weed infestation, do not: clearing.
(2) any associated loss of chemical,
physical or biological fertility— (1) exceed 5 metres in width
including, but not limited to water (2) de-stabilise the banks of any watercourse or drainage
holding capacity, soil structure, feature as a result of crossing construction or use.
organic matter, soil biology and
nutrients
within or outside the lot(s) that are the
subject of the application.
State development assessment provisions Module 8 — Native vegetation clearing 8.1 Queensland vegetation management state code
23 November 2015 V1.7 Page 27 of 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.