Skip to the record
Beware of cheap imitations.

Council archive · source document

Development Assessment Report · MCU26/0067

of 57

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

    PROJECT URBAN – 26167                                                                 July 2026


Peak student attendance is also expected to occur largely outside the peak operating periods of
surrounding industrial businesses. While some overlap may occur between approximately 3:30pm
and 5:00pm, many nearby businesses reduce activity or close during this period, with parking
demand substantially reducing after 5:00pm and at which time there is additional on street parking
readily available.

Many students also travel directly from local schools by bus, walk to the premises, or carpool with
other families, which further reduces vehicle movements and parking demand. The proposed
operating model is therefore expected to generate lower parking demand than might otherwise be
anticipated for an indoor recreation use of this nature.

A comparison between the current car parking requirements and use credit , existing Development
Permit MCU10/2056, operational experience by NPDA for 15 years, staggered class scheduling,
and the established a drop-off and pick-up management system, demonstrates that the proposed
use will have sufficient car parking is available to accommodate the number and type of vehicles
likely to be generated by the use on site in compliance with Performance Outcome PO35.

7.5     DEVELOPMENT CODES

The applicable development codes are:

•     Recreation Activities code
•     Works codes
         o Driveways and parking code
         o Waste management code

          The remaining Works codes are not relevant to the assessment of the application as the
          use is undertaken within an existing building and fully developed site.

An assessment against the Recreation Activities code, Driveways and parking code and Waste
management code has been undertaken and included in Attachment 2.

The code assessment has determined that the proposed development complies with all relevant
performance outcomes. Where acceptable outcomes are not met, compliance with the
corresponding performance outcome is discussed in section 7.5.1 below.

7.5.1 PERFORMANCE OUTCOMES

Driveways and parking code

PO6
Sufficient parking
(a) is provided having regard to the specifics of the use including—
      (i)   the type and intensity of land use;
      (ii) any existing parking available on the site;
      (iii) hours of operation;
      (iv) likely numbers of users;
      (v) accessibility to the site by means other than private motor vehicle;
      (vi) the peak parking demand periods of uses on the site; and
      (vii) the availability of alternative car parking; and
(b) is provided to accommodate the number and type of vehicles and motorcycles likely to be
      generated by the development.




    DEVELOPMENT ASSESSMENT REPORT                                                             Page 13
    Material Change of Use
    4/40 Gateway Drive, Noosaville

Used in these records

About this file

File size
3.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Assessment Report.pdf · 3.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.