Council archive · source document
Development Assessment Report · MCU26/0067
to ensure the efficient and safe operation of the activity
and safe access for users.
PO6 No acceptable outcome provided Complies
Recreation activities involving buildings and structures The proposed development is contained within an
are fit for purpose and reflect the character of the existing building on a fully developed site and
location in which it is located with design elements and provides a tenancy area fit for purpose.
materials that reflect the local character of the area.
Landscaping
PO7 No acceptable outcome provided Not Applicable
Landscape treatments provide shade and soften the The proposed development is contained within an
visual appearance of buildings, outdoor recreation existing building on a fully developed site.
spaces and service areas.
Safety and amenity
PO8 AO8 Not Applicable
Recreation activities are located, designed and An operation management plan is provided for a Major The proposed development is not for a Major sport,
operated to avoid significant adverse impacts sport, recreation and entertainment facility or Outdoor recreation and entertainment facility or Outdoor sport
associated with noise, privacy, security, waste, and sport and recreation facilities outlining how the activity and recreation facility.
lighting on the amenity of the area. will minimise adverse impacts including:
(a) noise mitigation and noise management
protocols;
(b) safety and security measures;
(c) crowd control;
(d) lighting; and
(e) waste management and collection.
Hours of Operation No acceptable outcome provided Complies
PO9 The proposed operating hours will not have any
Recreation activities operate within a timeframe that negative impacts on the amenity of the surrounding
avoids negative impacts on the amenity of the area or sensitive land uses.
surrounding area and sensitive land uses.
Noise AO10 Not Applicable
PO10 Any Major sport, recreation and entertainment facility is The proposed development is not a Major sport,
Recreation activities are designed and operated to 50 metres from the common boundary to any adjoining recreation and entertainment facility.
avoid noise emissions that unreasonably impact on the residential activity and includes the erection of a 1.8
amenity of the area and sensitive land uses. metre high acoustic fence for the full length of the
common boundary.
Editor’s Note— An acoustic report may be required to meet
PO10.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Assessment Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.