Council archive · source document
Development Assessment Report · MCU26/0067
paving material or fencing are examples of delineating a
waste storage area. The locking of the area is not
preferred and should be avoided.
Water management
PO6 AO6 Complies
Waste storage areas are designed to contain and The waste storage area is constructed of The site is fully developed and provided with
appropriately dispose of leakage from bins and impermeable and durable surfaces and: waste storage facilities.
wastewater from bin washing. (a) is bunded and graded so that washwater and
bin leakage are drained to the sewer or an on-
site effluent disposal system via a gully within
the storage area;
(b) has a bund wall with a maximum height of 100
millimetres;
(c) is serviced by a conveniently located hosecock
and backflow prevention device, and
connected to a water supply; and
(d) is roofed or otherwise covered if the storage
area is—
(i) more than 1m2; or
(ii) storing wet waste; or
(iii) storing other waste with a high potential
to cause pollution if washed or leaked
from the bins, including waste oil or
putrescibles.
Safety and protection of infrastructure when demolishing or removing buildings
PO7 AO7.1 Not Applicable
Demolition, removal, relocation or associated works Infrastructure including reticulated water, sewerage, The development does not involve demolishing or
do not result in: stormwater, and electricity are protected from removing buildings.
(a) 'live' or 'active' infrastructure that may present damage and made safe to the standard required by
risk to people using the site or surrounding the regulatory authority.
areas; or
(b) damage to infrastructure or other works. AO7.2
Infrastructure is disconnected, capped or sealed
Editor's note— An approval will be required from including:
Council's Building and Plumbing Services for (a) electricity meters are removed and electrical
decommissioning plumbing apparatus including: wires disconnected;
(a) sanitary drains or reticulated water supply; and
(b) septic tanks, holding tanks or on-site treatment
(b) telephone lines are disconnected; and
systems. (c) data cables are disconnected and removed.
AO7.3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Assessment Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.