Council archive · source document
Attachment 5 - Geotechnical Assessment · MCU18/0015
RTI 11/055 Folio B384 . 1 — November 2003 - ii- 03632248-001 LIST OF TABLES Table 1 : Summary of Shear Strength Testing Table 2 : Modelled Geotechnical Parameters y Table 3 : Summary of Slope Stability Analyses L Table 4 : Relative Risk Levels & Implications for Development — Table 5 : Retaining Structure Design Parameters Table 6 : Pavement Design Parameters i LIST OF FIGURES . Figure 1 : Site Plan B Figure 2 : Section A-A - Figure 3: Section B-B = Figure 4 : Section C-C os, Figure 5 : Section D-D Lo i , LIST OF PHOTOGRAPHS _ Photograph 1 : View towards north below proposed Lodge Photograph 2 : Colluvium exposure in creek bank below possible landslip ~ Photograph 3 : View into site towards test pit T'P9 from Viridian site . LIST OF APPENDICES * Appendix A : Reports of Boreholes, Test Pits & DCP Tests nS Explanation Notes, Abbreviations & Terms Used on Borehole and Test a Pit Reports Method’of Soil Description Used on Borehole and Test Pit Reports rN Terms for Rock Material Strength & Weathering and Abbreviations for . Defect Descriptions L, Appendix B : Geotechnical Laboratory Test Results — Appendix C : Slope W Results Appendix D : “Important Information About Your Geotechnical Engineering Report” C1 FI Golder Associates
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Geotechnical Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.