Council archive · source document
Attachment 5 - Geotechnical Assessment · MCU18/0015
RTI 11/055 Folio B409 - ae oe Beate. SHEET: 1 OF 1 CLIENT: Mr Phillip Harding POSITION: Refer to Site Plan DRILL RIG: Hand Auger PROJECT: Housing Development SURFACE RL: 54.5m DATUM: AHD71 ORILLER: LOCATION: _— Attunga Heights INCLINATION: -90° LOGGED: PGH DATE: 9/10/03 JOB NO: 03632248 HOLE DIA: 100 mm HOLE DEPTH: 0.90 m CHECKED: her DATE: 210% Drilling Sampling Field Material Description Bw a = 3 ° ES uw g w [2 DCP TEST (AS1289.6.3.2) 8 Berea rnprest |S1e | & SOIL / ROCK MATERIAL DESCRIPTION 5 ibe Blows per 100 mm Yale | as ol] alo 222 ¥ jee) | BE PR #l83|2 g\gap = 1 2% 9.0~T-sa50 TSP] SAND 1 fine to medium grained, fight grey, trace of root matter 1 O90} ee Pd < 54.20 | becoming pale grey 7 * 05—] =| 5 4 0,90 _| DS 0,80-0.90m on 1 10—| 53.60 END OF [email protected] m wd UNABLE TO EXTRACT 7 15 = 20 om 254 4 3.0 4 2 35 4 § A J 8 4 1 s 4.0 + 5 4 4 5 4 4 8 ; J 8 45-] 4 gl 4 4 5 4 4 8 4 4 g 4 4 y 5.0 4 8 4 4 2 4 4 & 557) 4 & 4 J & 4 4 5 4 4 2 6.0 4 5 4 4 8 1 J & a 7 J z| 65— 4 a 7 4 w 7 4 & 4 4 8 J 4 =| \ Brot tba ao coats “ceo TE re ee ae me Bae me tine a This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for 2 geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP gINT FN. me
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Geotechnical Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.