Council archive · source document
Attachment 5 - Geotechnical Assessment · MCU18/0015
i= MO J Lu u - 2 a a L . ro GAPS_t, MOORE.GLB FULL PAGE J\2003}0THER OFFICESW3632248\03632248BHDCP.GPJ GAPS_1,GDT 21/10/2003 10:21:23 AM RTI 11/055 Folio B421 REPORT OF BOREHOLE: BH8 SHEET: 1 OF 1 CLIENT: Mr Phillip Harding POSITION: Refer to Site Plan DRILL RIG; Hand Auger PROJECT: Housing Development SURFACE RL: 23m DATUM: AHD71 DRILLER: LOCATION: Attunga Heights INCLINATION; -90° LOGGED: PGH DATE: 9/10/03 JOB NO: 03632248 HOLE DIA: 100 mm HOLE DEPTH: 0.70m CHECKED: AtDd DATE: Zt tofoz} Drilting Sampling Field Material Description Su 9 5 3 eg w 3 wie DCP TEST (AS1289.6.3.2) Sls al ag SAMPLE OR 8/2 | SOIL / ROCK MATERIAL DESCRIPTION Falta Blows per 100 mm bees | Be 8183/3 ggzo os 4 5 2 2 Be) | BE Part 2|53| 8 2|88 pi 2 9.03550 TSP] SAND 71 Q fine to medium grained, light grey, trace of root matter to 7 1 0.2m 4 s 4 a} 5 ] 0.5 a ‘1.a70 | DS.0.60-0.70m fe 1 22.30 END OF [email protected] 7 UNABLE TO EXTRACT 1 1.0~ | 1.5 4 20-4 4 25 4 3.0—-] 4 3.54 4 4.0— 4 45-4 4 5.0 a 5.5— 4 6.0 4 654 4 pte t ily, —~L______ Se Pet LL This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP gINT FN. Fore
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Geotechnical Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.