Skip to the record
Accept no substitutions.

Council archive · source document

Attachment 5 - Geotechnical Assessment · MCU18/0015

of 82

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

Lot OP]

RTI 11/055 Folio B431

Geotechnical Testing Authority

11 Production Ave
Bokarina Qld 4575

PO Box 2
Buddina Qld 4575

Telephone: (07) 5493 1733
Facsimile: (07) 5493 6019
Email: [email protected]

 

Quality of Materials Report

 

 

Golder Associates

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

J} Client: Report Number: G3005 - 130
| JJob Number: G3005 Report Date: 28/10/2003
Project: Laboratory Testing ‘Order Number:
r|Location Project 03632248, Attunga Heights Page 1 of 1
Lab No: 52846 Sample ID: Sample Location
~IDate Sampled: 16/10/2003 Item No: Test Pit 9
| Date Tested: 24/10/2003 Depth 0.9m
| Sampled By: Client
Sample Method:
{Material Source: Site
[ For Use As: Lot Number:
~ VRemarks: Spec\Number:
~ A.S. Sieve Sizes Specification Percent Specification
[| Minimum Passing Maximum
Test Method: AS1289.3.6.1
75,00 mm =
[ 53.00 mm - \
37.50 mm -
26.50 mm ba
19.00 mm -
[| 13.2 mm :
9.50 mm :
6.70 mm .
[ 4.75 mm -
2.36.mm ~
1.18 min .
[| 0.600 mm -
0.425 roam :
™ 0.300 mm .
. 0.150 min -
a 0.075 rm 88
‘Atterberg Tests Test Method Specification Result Specification
- Minimum Maximum
Liquid: Limit (%) AS 1289.3.1.1 54
| ‘Plastic Limit (%) AS1289.3.2.1 31
| jPlasticity Index AS1289.3.3.1 23
Linear Shrinkage (%) AS1289,3.4.1 13.5
[ 'P.I.x % Passing 0.425 mm :
JL.S. x % Passing 0.425 mm
[Ratio of % Passing (0.075 / 0.425)
APPROVED SIGNATORY Form Number:
This Laboratory is accredited by the National -
| | Association of Testing Authorities, Australia. The NAQ \ 5}
| test(s) reported herein have been performed in REP QUAL-1
: ~y accordance with its terms of accreditation. This Mel Burnett
Lj document shall not be reproduced except in full. Nata Accred. No: 1554

 

 

 

 

[email protected]. Accredited Soil Laboratory -@* Roadworks & Subdivision Testina *@* Agareaate & Quarry Product Testina *@+ Earthworks Sunarvision @¢

 

 

Used in these records

About this file

File size
5.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 5 - Geotechnical Assessment.pdf · 5.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.