Council archive · source document
Attachment 5 - Geotechnical Assessment · MCU18/0015
CS See elle r —— oo — — —— — Information contained on this drawing is the copyright of Golder Associates Pty Ltd. Unauthorised use or reproduction of this pian either wholly or in part without written pemnission infringes copyright .© Golder Associates Pty Ltd. Elevation RL (m) 30 8 =k a 10 Description: Sitty Sand Unit Weight: 18 Cohesi Phir40 Description: Sandy Clay Description: Attunga Heights Comments: Section A-A (East)_Run1 Description: Silty Sand Unt Weight: 17 Cohesion: 0 Phi: 36 Factor of Safety = 0.84 oO Unit Weight: 18 Cohesion: 10 Phi: 32 | | | | | | 5 10 15 20 2 30 Relative Distance CLIENT . PROJECT Mr P Harding Attunga Heights omen AD/LRC | 14/11/03 | ™ SeenON AA — CHECKED SL DATE (Ul [02 ( East) RUN 1 SCALE PROJECT No FIGURE No As Shown A4 03632248 C1 Lvva OTTOM GSO/TT IL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Geotechnical Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.