17 May 2010 AMPM Jack Lewis ADAM MATTHEWS PROJECT MARAGEMENT Development Planner Planning Assessment North Sunshine Coast Regional Council PO Box 141 Tewantin QLD 4565 Lf RE: Girraween Sports Precinct - Decision Notice 2006 / 1168 Request to Change Existing Approval Dear Jack, On behalf of our client, Sunshine Coast Regional Council, please find attached 9 rnr™ ‘Request to change, an existing approval’ for the Girraween Sports Precinct. A Decision Notice was issued for this project on 21 December 2006 based on the preliminary design prepared by Callaghan & Toth which included two cricket fields, criterium circuit, clubhouse and car parking. Since this time Council has identified that the facility should be amended to facilitate soccer, athletics, criterium circuit, clubhouse, field lighting, car parking and car park lighting. An amended concept design has been prepared and is included in this application. The conditions included in the original Decision e: [email protected] w: wwwampm.netau Notice 2006 / 1168 have been addressed where possible and/ or relevant with in 8 the current concept design. Please refer to Schedule A - Response or Change to g 4 Original Conditions included in Request to change existing approval. abae We have also included Stage 1 Earthworks & Landscaping construction 2353 documentation for your review and to provide information pertaining to the Bok Decision Notice conditions. ‘ £5 Sincerely, D * " 89 evelopment Counter gash 3g439 bg bse we 17 MAY 2010 gises a GORGE We ee Russell Thompson fo Tewantin Senior Project Manager - 2 Enclosed: ogoae BON 4 x copies of Request to change existing approval including the following: 538 53 230 » Request to change an existing approval template $ ba aS * Form 6 Decision Notice 2006 / 1168 21 December 2006 aes « Schedule A - Response or Change to Conditions * Document List e Landscape, Civil, Electrical & Field lighting and Clubhouse Concept Plans . e Construction Documentation - Earthworks and Landscape & 5 > tS ge 38 Bg as £8 3s Be gz az 23 140510 RT to JL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of pages 2 to 151 (of 199)
Page 2
Integrated Development Assessment System template x wits od Request to change an existing approval template (Sustainable Planning Act 2009 version 1.1 effective March 2010) This template may be used for giving a written notice asking the responsible entity to make a permissible change toa development approval under section 369 of the Sustainable Planning Act 2009 (SPA). it should be noted that if the responsible entity for the request has a form for the request, the request must made using that form. This template must be lodged with the following entity (the responsible entity) as applicable: ¢ if the change is to a condition imposed by a Minister under chapter 6, part 11, division 1 of SPA the template must be lodged with the Minister that imposed the condition . if the approval was given by a Minister under chapter 6, part 11, division 2 of SPA the template must be lodged with the Minister that gave the approval ° if the change is to a condition of the approval imposed by a concurrence agency the template must be lodged with the concurrence agency « if the approval was given by the Planning and Environment Court the template must be lodged with the Planning and Environment Court ° in all other cases the template must be lodged with the assessment manager for the original development application. Attach extra pages if there is insufficient space on this template. Terms used in this template having the meaning given in the Sustainable Planning Act 2009. 1. Who is making the request? Name/s (individual or company name in full) SOMsSHiwe CoagT Coosa. For companies, contact name Postal address Clo AMPM Po BOK FOB\ SIPPY DORKRNS ALD 4556 Contact phone number OF SU5O 2420 Mobile number (non-mandatory) O¥BW 3BO COW Fax number (non-mandatory) 5450 2421 e-mail address (non-mandatory) [email protected] oe Department of Infrastructure and Planning @imn W® Queensland Government!
Page 3
LL
2. What are the details of the existing approval sought to be changed?
Type of approval Identification number
Date decision notice
or negotiated
decision notice
Name of entity that issued the approval or
imposed the condition sought to be changed
issued
Xl Development 2006 { \68 ai frzfos PoosA COUNCIL
permi
| Preliminary
approval
3. Is the approval for a mobile and temporary environmentally relevant activity (ERA)?
[X] No
C4] Yes—complete table A and then go to question 5
Table A—name of each local government area in which the mobile and temporary ERA is proposed to operate/ is operating
4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)
Table B—street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises
[x] street address/lot on the plan
C] street address/lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)
Street address
Lot on plan description | Local government area
(e.g. Logan, Cairns)
Unit | Street | Street name and official suburb/ | Post- Lot no. Plan type
no. no. locality name code and plan no.
COOYaR STREET 4 SPTESS | SoONSHINE COAST
NoosA HEADS
NM
Request to change an existing approval template
Version 1.1 March 2010
Page 4
LOH Table C—premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g. channel dredging in Moreton Bay) Coordinates (note: place each set of coordinates in a separate row) “| reference area (if applicable) Zone Datum Local government Easting Northing Latitude Longitude | GDA94 [] weseg | Other 5. Details of the proposed change Set ATAcHED Screpove A 6. ls owner's consent required for this request? (refer to notes at the end of this form for more information) [] No xX Yes—complete either table D or table E as applicable Table D Name of owner of the land Sorsninwe COAST Coonciy |, the above-mentioned owner of the land, consent to the making of this request. Signature of owner of the land IER Cea Date | Mas 2ZoVI9 Table E Name of owner of the land C] The owner’s written consent is attached Request to change an existing approval template Version 1.1 March 2010
Page 5
information): No Yes—the written agreement of the chief executive from whom evidence would need to be obtained under the Sustainable Planning Act 2009, section 254(1) must be attached. 8. Has a pre-request response notice been given for this request? [x] Ne C] Yes—a copy of the pre-request response notice must be attached to this request 9. Is a copy of this request required to be given to another entity under section 372 of the Susta/nable Planning Act 2009? (refer to notes at the end of this form for more information) [X] No LC] Yes—complete Table F Table F A copy of this request has been provided to the entities identified below (provide details for each entity given a copy of the request and the date the copy was given) CJ Assessment manager for the original application | Concurrence agencies for the original application LJ Any other entity prescribed by aregulation 10. Provide details of any other supporting information attached to this request RereR ATTACHED Decomest LUST Notes for completing this template « This template is not an approved form under the Sustainable Planning Act 2009. The entity responsible for deciding the request may have their own form for the purpose of making a written request to change an existing development approval. Achange to an existing development approval may involve: ° a change to an approval given by the assessment manager a change to a condition imposed by a concurrence agency a change to an approval given by the Minister under a Ministerial call in a change to a condition imposed by the Minister under a Ministerial direction a change to an approval given by the Planning and Environment Court ooo 90 4 Request fo change an existing approval template Version 1.1 March 2010
Page 6
Question 6: « Under section 371 of the Sustainable Planning Act 2009, if the person making the request is not the owner of the land to which the approval relates, the request must be accompanied by the owner's consent. © However, owner’s consent is not required if the approval: ° relates to land that was acquisition land to which section 263(2)(d) of the Sustainable Planning Act 2009 applied when the application for the approval was made ° is for building work or operational work for the supply of community infrastructure on land designated for the community infrastructure, or ° the consent of the owner would not be required under section 263(1) of the Sustainable Planning Act 2009 if a development application were made for the requested change ¢ Also, owners’ consent is not required if the responsible entity is satisfied that: ° the number of owners of the land make it impracticable to obtain owners’ consent, and the requested change does not materially affect the owners’ land, or ° having regard to the nature of the proposed change, the owner has unreasonably withheld consent and the requested change does not materially affect the owner’s land. Question 7: © Section 370(3) and (4) of the Sustainable Planning Act 2009 requires that if an application for the development approval were made at the time of making this request and evidence under section 264(1) of the Sustainable Planning Act 2009 would be required to support the application, this request must be accompanied by the written agreement of the chief executive from whom evidence would be required under section 264(1). (Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a State resource, a regulation may require the application to be supported by certain evidence prescribed under the regulation. Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the State resources for which evidence is required to be given, and the evidence required, to support the application.) Question 9: ¢ Section 372 of the Sustainable Planning Act 2009 requires that a copy of the request be given to: ° the assessment manager for the original application, if the request is made to a concurrence agency, the Minister, or the court ° any concurrence agencies for the original application, if the request is made to the assessment manager for the original application, the Minister or the court ° any other entity prescribed by a regulation, « However, a copy of the request is not required to be given to an entity that has given a pre-request response notice for the request. OFFICE USE ONLY Date received ‘ Reference numbers ob 7 \o tl \bo 5 Request to change an existing approval template Version 1.1 March 2070
Page 7
Wi@l@hy-w Form 6 - Decision Notice co U » iS l a INTEGRATED PLANNING ACT 1997, S3.5.15, DAS DEVELOPMENT APPLICATION File No: 2006/1168 Date of Decision: 21 December 2006 | 1. APPLICANT DETAILS q Name: Noosa Council Postal address: CARE Martoo Consulting Pty Ltd PO Box 1684 NOOSA HEADS QLD 4567 Phone no: 07 5455 5425 Fax no: 07 5455 5725 [ 2. PROPERTY DESCRIPTION ] Street address: | Cooyar Street, Noosa Heads Real property Lot 1 SP 177650, County of March, Parish of Weyba description: | 3. | OWNER DETAILS | Name: Noosa Shire Council Postal address: PO Box 141 TEWANTIN QLD 4565 I 4. REFERRAL AGENCIES | Referral Agency Address Basis Department of Natural PO Box 383, Gympie Qld 45470 Concurrence Agency Resources & Water | 5. APPLICATION TYPE | Development Development Details Preliminary Development Approval Permit Material Change of Use Sport & Recreation (Cricket oval, practice No Yes nets, criterium circuit & club house) assessable under the Superseded Planning Scheme 6. _ DECISION DETAILS | Council decided to approve the application and grant a Development Permit, subject to conditions. | 7. APPLICABLE CODES | The developer must comply with the following codes for self-assessable development related to the development approved under this Development Permit:- Not applicable. | 8. SUBMISSIONS j Not applicable.
Page 8
NOOSA COUNCIL IDAS Development Application Decision Notice 20f15 | 9. CONDITIONS The approval is subject to conditions. Noosa Council's conditions are attached. Conditions from the Department of Natural Resources & Water, as a concurrence agency are also attached. | 10. | FURTHER DEVELOPMENT PERMITS REQUIRED Type of Development Permit required Subject of the required Development Permit Development Permit tor Building Works All building works Development Permit for Operational Works Landscaping, car parking and access, frontage works, stormwater drainage, sewer reticulation (including new mains, relocations, diversions, pump stations and rising mains), roadworks, site civil works, water reticulation and earthworks/filling of the site. [. 11. _ RIGHTS OF APPEAL | Rights of appeal in relation to this application are attached. | 12. ASSESSMENT MANAGER Name: Noosa Council Signature: Ke fide Date: 22/12/06 Cha la fon . AT p:lt. projects\208 girraween sports complex\12.0 documentation\documents from chris 090925\1 - approved mcu plans\mcu decision notice\sports fields meu decision notice.doc
Page 9
~ NOOSA COUNCIL DAS Development Application Decision Notice 3of 15
WI@@N28 §=©Noosa Council Conditions
COUNCIL
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
Land Use
1.
Development undertaken in accordance with this approval must generally comply with the approved plans
of development. The approved plans are prepared by Callaghan & Toth and numbered 0513-04A to 0513-
07A and dated September 2006; 0513-08A and dated September 2006; 0513-09 to 0513-10 and dated 24
Feb 2006; 0513-11 and dated 28 Feb 2006; 0513-12A and dated August 2006; 0513-13A to 0513-14A
and dated September 2006 as may be amended by these conditions.
The development must be undertaken and operated in a manner that causes no detrimental effect upon
the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
emissions.
The open space and setback areas are to be landscaped in accordance with Council's Policy on
Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably qualified
Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to the premises being
occupied and maintained at all times thereafter.
In particular the following requirements shall be included in the landscape plan for the development area:
3.1. native buffer screen landscaping shall be provided along the Eenie Creek Road frontage of the
development area, and shall effectively screen the development from Eenie Creek Road. It is
envisaged this buffer shall be a minimum of 10 m wide, and that the screen planting for the
western oval may be located within the road reserve if necessary;
3.2. the northern most existing bluegum tree (or the two northern most trees if possible) shall be
retained in the final design of the development, unless otherwise approved by Manager Land Use;
3.3. remaining open space areas within the proposed development part of the site shall be landscaped
with endemic plants where no conflict occurs with the proposed sporting activities;
3.4. _ the periphery of the developed part of the site shall be cleared of weeds, and existing native plants
reinforced with further plantings of endemic species to create a sustainable ecosystem;
3.5. the entire area shall be stabilised with grasses and vegetation to obtain 80% ground cover per
square metre within 45 days of the completion of earthworks;
3.6. landscaping shall incorporate a minimum of 100 shade trees throughout the site in safe locations
for cyclists.
3.7. _ the western existing vegetation core wildlife corridor shall be planted with endemic koala food trees
and other necessary species to reinforce the local sustainable ecosystem in consultation with the
Manager Land Use.
3.8. the existing batter at RL25.00 at the property frontage shall be retained and landscaped as a visual
buffer except for access to the site.
3.9. the batters to the criterium circuit shall be revegetated and stabilised with suitable native shrubs,
native grasses or other suitable grass, and endemic trees where safety requirements permit.
3.10. suitable native buffer plantings (min 1m high) shall be planted as close as practical to the criterium
track where it traverses the road reserve to assist in preventing public access to the track, and
provide a safe environment for competition cyclists.
3.11. non - potable recycled water shall be utilised for irrigation purposes.
3.12. a suitable lightweight and aesthetic safety net (or suitable screening vegetation) is to be erected
internal to the property boundary if cricket balls are likely to land within the Eenie Creek Road
reserve,
RT p:\f. projects\208 girraween sports complex\12.0 documentation\documents from chris 090925\1 - approved meu plans\meu
decision notice\sports fields mcu decision notice.doc
Page 10
NOOSA COUNCIL IDAS Development Application Decision Notice 4of 15 10. 11. 12. 13. 14, 15. All fencing to the Eenie Creek Road property boundary shall be coloured green or black and screened by native vegetation. Existing trees on the site and within road reserves are to be retained, except where required to be removed due to construction and building operations or the conduct of the approved use. These landscape plans required to be submitted are to denote areas of existing vegetation or existing trees proposed or required to be retained. Cleared vegetation is to be suitably processed by one of the following methods and removed from the site:- 6.1. | Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum of 10 metres between edges of heaps. 6.2. The Applicant is advised that burning off is an unacceptable method of disposal. Any advertising sign or device is to comply with Council's policies on advertising. All hot water systems installed shall be either solar systems; electric heat pump systems; or gas systems (LPG or natural). Secure bicycle racks shall be provided on site to accommodate a minimum of 12 bicycles. The proposed bicycle racks shall be identified on the landscaping plans and shall be located to the reasonable satisfaction of the Manager, Land Use. The proposed development shall have all kitchen, laundry and bathroom fittings that comply with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min. Dishwashers and washing machines are excluded from this requirement. The section of the criterium track located within the Eenie Creek Road reserve shall not have any permanent fence installed within the road reserve for the sole purpose of preventing public access; and the road reserve shall remain available for any future road duplication requirements as considered necessary by Council. Adequate safety strategies shall be put in place for the part of the track located within the road reserve when the criterium track is utilized for competition. The requirements of this development approval are to be effected, prior to the use of the premises. Prior to the commencement of development, the following Development Permits must be obtained:- 14.1. Development Permit for Building Works; 14.2. Development Permit for Operational Works of landscaping, car parking and access, frontage works, stormwater drainage, sewer reticulation (including new mains, relocations, diversions, pump stations and rising mains), roadworks, site civil works, water reticulation and earthworks/filling of the site. The Development Permit for a material change of use of premises lapses if the use has not happened by 21 December 2010 unless an application to extend the currency is approved by Council. Land Development Vehicle Access 16. 17. A vehicular access road to the site shall be constructed from the Eenie Creek Road/Langura Street roundabout generally in accordance with proposal plan 0513-05A dated 28 February 2006 and prepared by Callaghan & Toth. Ail vehicles shall enter and leave the site in a forward direction. RT pit. projects\208 girraween sports complex\12.0 documentation\documents from chris 090925\1 - approved meu plans\meu decision notice\sports fields mcu decision notice.doc
Page 11
~~ NOOSA COUNCIL IDAS Development Application Decision Notice 5 of 15 Carparking Off Street 18. Carparking shall be provided within the site as shown on drawing number 0513-05A dated 28 February 2006 by Callaghan & Toth, except as modified herein. 19. A minimum of 100 uncovered carpark spaces shall be provided on site, including 3 clearly defined disabled carpark spaces. 20. The carparking area shall be designed to comply with the provisions of AS 2890.1-2004 for user class 2 with allowance for vehicles to enter and leave the site in a forward gear and with a minimum head clearance (headroom) at any point of 2.2m. 21. The proposed set down area, bus stops and water truck refilling stop shall be line-marked with chevrons and have appropriate words painted on the pavement. A sign shall also be provided to indicate that the areas are for “Set Down Areas”, “Bus Stops” and Water Truck Stop" respectively, and that "No Parking is Permitted”. 22. Ail carparking shall be kept, maintained and line-marked in a condition fit for use. Frontage Works 23. Footpath improvements such as topsoiling, grassing, and tree planting are required to the Eenie Creek Road frontage of the site in accordance with Planning Scheme Policy PSP1 Landscaping Guidelines. Grass shall be couch, free of weeds. 24. Anew full width concrete or paved path shall be constructed along the Eenie Creek Road frontage of the site in accordance with Council's design standards. Care shall be taken to protect any existing vegetation and/or any underground services. Stormwater Drainage 25. 26. 27. 28. 29. Root runoff from the new building shall be directed to a rainwater storage system or tank (minimum storage 12 litres/m? of roof area) that is installed to ensure water from the tank can be used for external uses (such as watering gardens, irrigation, ornamental ponds, water features, outdoor cleaning, etc) and for use in flushing of toilets internal to the building. All rainwater tanks are to be designed and installed in accordance with the Queensland Development Code (QDC), Part 25 — Rainwater Tanks, and shall be part of the plumbing application in conjunction with the building approval. The location and capacity of the tanks shall be clearly shown on the plans submitted for Building Works approval and any overflow shall be directed to the proposed stormwater system. As the site is proposed to be filled, appropriate stormwater drainage pipes shall be installed within the site to collect and discharge stormwater runoff from all adjoining properties to prevent additional ponding/flooding on these properties. To ensure that polluted run-off does not enter Burgess Creek, stormwater shall be treated generally in accordance with the Stormwater Quality Management and Assessment Report dated September 2006 and prepared by Callaghan & Toth. The system shall ensure that stormwater run-off from the carparking areas and the driveways shall have the first flush (the first 12 mm of rainfall or hose-down) collected in grease/oil arrestors prior to entering the proposed GPT's and bioretention zones, The proposed GPT's may be designed with grease/oil arrestor capacity. All other clean stormwater, such as roof water, can be collected on site and discharged through a single underground drain line directly into the existing drainage system, bypassing the grease/oil arrestor. To this end, a detailed management plan shall be prepared for the proposed stormwater treatment system, which shall be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. A Development Permit for Building Works shall not be granted unti! a Development Permit for Operational Works has been issued in regard to the drainage scheme. All site stormwater drainage shall be by means of a gravity system. All stormwater drainage lines including inter-allotment drainage shall be inspected by closed circuit television (CCTV) prior to commencement of the approved Use. AT pill. projects\208 girraween sports complex\12.0 documentation\documents from chris 09092511 - approved meu plans\meu decision notice\sports fields mcu decision notice.doc
Page 12
NOOSA COUNCIL IDAS Development Application Decision Notice 6 of 15 CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council following satisfactory completion of construction works. The developer will be responsible for the full cost of CCTV inspection, including any additional inspection necessary following defect identification and rectification. This charge is payable prior to the issue of Operational Works approval and will be determined on the unit rate basis current at the time of approval. Sewer Mains 30. The site shall be connected to Council's existing sewerage reticulation systems and be constructed in accordance with Council's standards and requirements at no cost to Council. 31. | The proposed package sewerage pumping station shall have emergency storage tanks with a capacity of 24 hour storage to minimise risk of spillage to Burgess Creek. Town Water Supply 32. The site shall be connected to Council's existing town water supply and be constructed in accordance with Council's standards and requirements at no cost to Council. Earthworks 33. Filling works required on site shall be carried out in accordance with Section 3.8 of Council's Engineering Design Standards Manual and so as not to cause the additional ponding of water on any adjoining lands or the blockage of, or interference with, any natural watercourses. Detailed site surveys indicating natural surface levels and contours of the adjoining properties must be provided with the application for a Development Permit for Operational Works for Filling and Drainage. This may require the design and construction of drainage pipes and/or an overland flow-path within the development site that caters for drainage from the adjoining sites for a design storm with an Average Recurrence Interval of 1 in 100 years. A private easement for the Drainage of Water encompassing the drainage pipes or overland flow-path will also be required. In this regard a Development Permit for Operational Works shall be obtained. Should evidence be provided to Council indicating that no additional ponding of stormwater will occur on the adjoining properties the requirement for the drainage pipes, overland flow-path and easement shall not apply. Acid Sulfate Soils 34. — As the site is located below the 20m AHD and above the 5m AHD, any excavation works consisting of 100m or greater which extends below 5m AHD will need to be carried out in accordance with State Planning Policy 2/02 Planning and Managing Development Involving Acid Sulfate Soils. In this regard appropriate testing and supporting documentation prepared by a suitably qualified specialist shall be submitted to Council for approval prior to obtaining a Development Permit for Operational Works. Erosion and Sediment Control 35. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. General 36. | The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to obtaining a Development Permit for Building Works. 37. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and specifications for all engineering works that will become Council infrastructure, which shall be submitted in conjunction with an application for a Development Permit for Operational Works. In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction with any application tor Operational Works. 38. Digital detailed design drawings and calculations shall be submitted with any application for a Development Permit for Operational Works in respect of roadworks and stormwater drainage works. To avoid conflict with underground pipes or services, all existing and proposed services required by the development shall be shown on the plans. 39. To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au). RT p:lt. projects\208 girraween sports complex\12.0 documentationidocuments trom chris 090925\1 - approved mcu plans\meu decision notice\sports fields mcu decision notice.doc
Page 13
NOOSA COUNCIL IDAS Development Application Decision Notice 7o0f 15 40. | Any damage caused to any public utility during the course of construction shall be repaired to Council's standards and at no cost to Council. 41. Any alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site shall be at no cost to Council. 42. The transportation of all materials to and from the site shall be undertaken in a manner such that no particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall be covered to prevent materials including dust being windblown from the vehicle. 43. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services and structures. All of which shall be submitted to Council for checking and for Council's records. The data must fully detail levels for all engineering works including but not limited to drainage structures, finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au). Approval of works shall not be granted unti! all As Constructed information has been supplied and accepted by Council. Environmental Health 44. The developer must provide waste storage and disposal facilities in accordance with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises", including an external imperviously paved area correctly sized for all refuse and recycling containers and suitably screened from public places and neighbouring properties. A bin wash area is required with a cold-water tap, hose and drain outlet connected to sewer. The drain outlet is to be designed to prevent storm water entry to the sewerage system and this can be achieved with a nib wall 50mm high and up to 700mm x 700mm wide (max 0.5m’), or alternatively the waste area can be roofed, or any other design approved by Council. 45. All bin wash areas in excess of 700mm Square are to be roofed and the floor is to fall to a bucket trap with the waste pre-treated by a grease arrestor prior to discharge to the sewer. The appropriate backflow prevention devices are to be installed at the bin wash area. Bunding set above 75mm is required to exclude excessive rain-water entering these areas. 46. A Trade Waste Application must be submitted prior to the issue of a Development Permit for Building Works. 47. Full truck access is to be provided to each grease arrestor and/or pre-treatment device for cleaning and servicing. Where access is restricted, a pump out line is required. 48. A completed Trade Waste application together with an applicable fee and two (2) sets of professionally drawn plans showing the Trade Waste requirements in accordance with the Noosa Trade Waste Policy are to be submitted to Council. 49. The property owner will be responsible for any cost incurred by an approved Cleaning Contractor relating to the cleaning, servicing and contents removal from the grease arrestor, where access to the arrestor is impaired or delayed. 50. The Trade Waste application fee of ($105.00) is required at the time of the application. 51. Trade Waste requirements are required to be in place, inspected and approved prior to the commencement of trading or operation. The appropriate Trade Waste Permits will be issued following approval at final inspection. 52. A place of food preparation and/or cooking is to have the liquid waste connected to a Trade Waste line, that discharges to an approved grease arrestor of a size determined by Council's Trade Waste Policy. 53. All liquid waste produced by the commercial section of the development is “Trade Waste” and is to be treated as required under the Noosa Trade Waste Policy prior to release to the sewer. Environmental Services 54. An Environmental Management Plan (EMP) shall be prepared and implemented to ensure that the impact of the development, during construction and operation, on the environment is minimised and that the environmental values of the site and surrounding lands are protected and enhanced. RT p:it. projects\208 girraween sports complex\12.0 documentation\documents from chris 090925\1 - approved meu plans\mcu decision notice\sports fields mcu decision notice.doc
Page 14
NOOSA COUNCIL IDAS Development Application Decision Notice 8 of 15 55. The EMP shall address the following issues in relation to construction and operational phases of the development: Legislative compliance; Vegetation protection; i. Including construction fencing delineating the development footprint shall be established and approved prior to Operational Works commencing. ii. Protection of area to the south east of the site containing populations of native plants, Macarthuria complanata, and scheduled “Rare” under the Nature Conservation Act 1992. c. Fauna and fauna habitat protection; i. Including that construction works do not occur during the breeding period of the Rainbow Bee-eater (Merops ornatus) and that a qualified ornithologist inspect the site prior to Operational Works commencing on the site. d. Weed & pest control; e. Soil erosion and sediment control; t. Water quality protection; i, Generally in accordance with the Stormwater Quality Management and Assessment Report prepared by Callaghan & Toth and dated September 2006. Groundwater protection; h. Air quality protection; i. Acid sulphate soil management; j- Waste management; k. Amenity (visual, noise, etc) management; I. Cultura! heritage management; and m. Bushfire control; i. Including the need for any buffers being located within the development footprint and not encroaching into the adjoining vegetation. This EMP shall be submitted by the applicant for approval by Manager Environmental Services and Manager Land Use prior to issue of a Development Permit for Operational Works. AT p:\1. projects\208 girraween sports complex\12.0 documentationidocuments from chris 090925\1 - approved meu plans\mcu decision notice\sports fields meu decision notice.doc
Page 15
NOOSA
COUNCIL
Concurrence Agency Conditions -
Department of Natural Resources & Water
INTEGRATED PLANNING ACT 1997, DAS DEVELOPMENT APPLICATION
Referral Agency Response —
Material Change of Use
Section 33.16 Integrated Planning Act 1997
1. Application Information
1.1, Applicant’s Name
1.2. Property Description
1.3. Type of Development Sought
1.4, Referral Date of Application
1.5. Assessment Manager — Reference
1.6. Departmental References
2. Conditions
Queensland
¥ Government
VS Natural Resources
and Water
Noosa Shire Council
Lot 1 on SP177650
Material Change of Use
11 July 2006
Noosa Shire Council — 2006/1168
eLVAS — 2006/007951
File - GYV/000447
Trackjab — 1C0706GY M000S
The Chief Executive of the Department of Natural Resources and Water (NRW) directs that
the following conditions must be applied to any approval made by the Assessment
Manager—
2.1. Clearing of native vegetation is not authorised to be carried out under this approval. Any
future clearing of native vegetation will be subject to a development application for
operational works, unless the clearing is deemed to be exempt development under
Schedule 8, Part 1, Table 4 of the /ntegrated Planning Act 1997.
RT p:\1. projects\208 girraween sports complex\12.0 documentation\documents from chris 090925\1 - approved meu plans\mcu
decision notice\sports fields mcu decision notice.doc
Page 16
NOOSA COUNCIL IDAS Development Application Decision Notice 10 of 15 3. Submitted Plan 3.1. Title Site Plan: 3.2, Date 28 February 2006 3.3. Author CALLAGHAN & TOTH Civil, Environmental & Hydraulic Engineers 3.4, Reference 0513 - 04 oe 4, Reasons A Statement of Reasons is attached at Schedule 1. 5. Aboriginal Cultural Heritage Information Under section 23 of the Aboriginal Cultural Heritage Act 2003 a person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage (the “cultural heritage duty of care”). Maximum penalties for breaching the duty of care are $750,000 for a corporation and $75,000 for an individual. Applicants will comply with the duty of care in relation to Aboriginal cultural heritage if they are acting in compliance with cultural heritage duty of care guidelines gazetted under the Aboriginal Cultural Heritage Act 2003, available on the Department’s website, or in accordance with an agreement with the Aboriginal party for the area or a cultural heritage management plan approved under part 7 of the Aboriginal Cultural Heritage Act 2003. Applicants should also undertake a search of the Aboriginal Cultural Heritage Database and the Aboriginal Cultural Heritage Register, administered by the Cultural Heritage NRW — Referral Agency Response - 2006/007951 Page 2 of 8 AT p:\t. projects\208 girraween sports complex\12.0 documentation\documents from chris 080925\1 - approved mcu plans\mcu decision notice\sports fields mcu decision notice.doc
Page 17
~ ~ NOOSA COUNCIL IDAS Development Application Decision Notice 11 of 15 Coordination Unit, the NRW. Application forms to undertake a free search of the Cultural Heritage Register and the Database may be obtained by contacting the Cultural Heritage Coordination Unit on (07) 323 83838 or on the Department’s website— www.nin.gld.goy.au/cultural_heritage. 6. Attachment Schedule 1 - Statement of Reasons is attached to, and forms part of, this Referral Agency Response. 7. Authorised Officer Signature Gi Andrew Collins Acting Senior Vegetation Management Officer South East Region 22 November 2006 NRW - Referral Agency Response - 2006/007951 Page 3 of 8 AT p:\1. projects\208 girraween sports complex\12.0 documentation\documents from chris 090925\1 - approved mcu plans\meu decision notice\sports fields meu decision notice.doc
Page 18
NOOSA COUNCIL IDAS Development Application Decision Notice 12 of 15 NOOSA Local Laws, Policies & State Regulation Requirements COUNCIL INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM CONDITIONS OF APPROVAL 1. The payment of the following Infrastructure Charge and contribution amounts as at September 2006 have not been applied because the proposed use is a community use, as Council is the applicant. Council's Coastal Major Road Network Infrastructure Charges Plan $ 36,018 Council's Planning Scheme Policy PSP24 $740 Park Requirements for Development Applications Council's Planning Scheme Policy PSP41 $748 Pathway Trunk Network Contributions 2. The applicant is advised that a Compliance Permit for all plumbing and drainage works within the boundaries of the development site shall be obtained trom Council's Plumbing Services Section prior to obtaining a Development Permit for Building Works. 3. Where any food premises is included in a development, the following is required: 3.1. Plans and application is to be made to Council's Environmental Health Section for approval prior to any building approval, fitting out or use of the premises. 3.2. A statement indicating the purpose of the food premises, type of food sold, proposed menu and number of persons to be served per hour, is to accompany the application for plan approval. 3.3. Construction and use of the food premises should comply with Council's Food Premises Policy and the Food Safety Standards. (Both available from Council) 3.4. Toilets for customers and staff to be provided in accordance with Building Code of Australia. Obtain advice from a building certitier on numbers and standards, including disable access. 3.5. Plans and approval is required for any mechanical exhaust ventilation system, which should comply with AS1668, A certificate from the installer certifying the system complies with the Standard must be obtained and lodged with Council prior to commencement of trade. 3.6. | Any Licensable Food Business, as defined in Chapter 3 of the Food Act 2006, must obtain a Food License from Council, prior to use of those premises. 4, The development should be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions in accordance with the nuisance provisions of the Environmental Protection Regulation 1998 or Council's Local Law No. 12 ~ Control of Nuisances. 5. Noise from building works associated with commercial and or industrial development should comply with the following — 5.1. Limited to between 7:00am to 6:30pm Monday to Saturday. 5.2. All reasonable measures are taken to minimise noise emissions. 5.3. Not permitted on Sunday or public holidays. AT p:\1. projects\208 girraween sports complex\12.0 documeniation\documents from chris 090925\1 - approved meu plansimeu decision notice\sports fields meu decision notice.doc
Page 19
~~ NOOSA COUNCIL IDAS Development Application Decision Notice 13 of 15 6. in accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint, cement, concrete, builder's waste or rubbish should not be permitted to enter or be placed where it could reasonably be expected to move into a roadside gutter, storm water drain or a watercourse. On the spot fines apply for such offences. 7. We advise ‘interested parties’ i.e. ‘developer’, ‘owner’, ‘tenant’ to consider their responsibilities under the Disability Discrimination Act (DDA) in regard to the installation of disabled access and the provision of disabled facilities, and that access to this building and the provision of sanitary facilities may need to comply with the requirements of Section D Part D3 and Section F Clause F2.4 of the Building Code of Australia. 8. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the cost of operational works exceeds $80,000, then a portable long service leave levy is required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight the approved form issued by the Building and Construction Industry (Portable Long Service Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory declaration outlining the cost of the operational works must be submitted to Council with the lodgement of any application for operational works over the site. AT p:\1. projects\208 girraween sports complex\12.0 documentation\documents from chris 090925\1 - approved mcu plans\mcu decision notice\sports fields mcu decision notice.doc
Page 20
NOOSA COUNCIL IDAS Development Application Decision Notice
140815
NOOSA
COUNCIL
Appeal Rights
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
The following is an extract from the Integrated’
Planning Act (Chapter 4). 4
to court relating to
Division 8 - Appeals
development applications
Appeals by applicants
4.1.27.(1) An applicant for a development application
May appeal to the court against any of the following-
(a) the refusal, or the
development application;
refusal in part, of a
(b) a matter stated in a development approval,
including any condition applying to the
development, and the identification of a code
under section 3.1.6;'
(c) the decision to give a preliminary approval when a
development permit was applied for;
(d) the length of a currency period;
(e) a deemed refusal.
(2) An appeal under subsection (1)(a) to (d) must
be started within 20 business days (the “applicant’s
appeal period”) after the day the decision notice or
negotiated decision notice is given to the applicant.
(3) An appeal under subsection (1)(e) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals by submitters
4.1.28.(1) A submitter for a development application
may appeal to the court about-
(a) the giving of a development approval, including
any conditions (or lack of conditions) or other
provisions of the approval; or
(b) the length of a currency period for the approval.
(2) The appeal must be started within 20 business
days (the “submitters appeal period”) after the day
the decision notice or negotiated decision notice is
given to the submitter.
(3) If a person withdraws a submission before the
application is decided, the person may not appeal the
decision.
(4) If an application involves both impact
assessment and code assessment, appeal rights for
submitters are available only for the part of the
application involving impact assessment.
(5) If an application is processed under section
6.1.28(2), appeal rights for submitters for the
application are available only for the aspects of the
development that would have required public
notification under the repealed Act.
" Section 3.1.6 (Preliminary approval may override local planning
instrument)
(6) If an application involves assessment against
a concurrence agency code, appeal rights for
submitters for the application are not available
against the part of the approval that represents the
concurrence agency's response for the code.
Appeals by advice agency submitters
4.1.29.(1) An advice agency may, within the limits of
its jurisdiction, appeal to the court about the giving of
a development approval for a development
application if-
(a) the development application involves
assessment; and
impact
(b) the advice agency told the applicant and the
assessment manager to treat its response to the
application as a submission for an appeal.
(2) The appeal must be started within 20 business
days after the day the decision notice or negotiated
decision notice is given to the advice agency as a
submitter.
Appeals for matters arising after approval given
(co-respondents)
4.1.30.(1) For a development approval given for a
development application, a person to whom any of
the following notices have been given may appeal to
the court against the decision in the notice-
(a) a notice giving a decision on a request for
extension of the currency period for an approval;
(b) a notice giving a decision on a request to make a
minor change to an approval.
(2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
(3) Subsection {1)(a) does not apply if the
approval resulted from a development application
(superseded planning scheme) that was assessed as
if it were an application under a superseded planning
scheme.
(4) Also, a person who has made a request
mentioned in subsection (1) may appeal to the court
against a deemed refusal of the request.
(5) An appeal under subsection (4) may be
started at any time after the last day the decision on
the matter should have been made.
Division 9 - Appeals to court about other matters
Appeals for matters arising after approval given
(no co-respondents)
4.1.31.(1) A person to whom any of the following
notices have been given may appeal to the court
against the decision in the notice-
(a) a notice giving a decision on a request to change
or cancel a condition of a development approval.
AT p:\t. projects\208 girraween sports complexi12.0 documentationidocuments from chris 090925\1 - approved mcu plans\mcu
decision nolice\sports fields mcu decision notice.doc
Page 21
NOOSA COUNCIL IDAS Development Application Decision Notice 15 of 15 (b) a notice under section 6.1 44? giving a decision to change or cancel a condition of a development approval. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. (3) Also, a person who has made a request mentioned in subsection (1)(a) may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. Appeals against decisions to change approval conditions under the repealed Act 4.1.334.(1) A person who is dissatisfied with a decision made on an application to change the conditions attached to an approval given under section 2.19(3)or section 4.4 of the repealed Act may appeal to the court against- (a) the decision; or (b) a deemed refusal of the application. (2) An appeal under subsection (1)(a) must be started within 20 business days after the day notice of the decision is to be given to the person. (3) An appeal under subsection (1)(b) may be started at any time after the last day a decision on the matter should have been made. Appeals against local laws 4.1.33B.(1) An applicant who is dissatisfied with a decision of a local government or the conditions applied under a local law about the use of premises or the erection of a building or other structure permitted by the planning scheme may appeal to the court against the decision or the conditions applied. (2) The appeal must be started within 20 business days after the day notice of the decision is given to the applicant. = Section 6.1.44 (Conditions may be changed or cancelled by assessment manager of concurrence agency in certain circumstances) AT p:\t. projects\208 girraween sports complex\12.0 documentation\documents from chris 090925\1 - approved meu plans\mcu decision notice\sports fields mcu decision netice.doc
Page 22
Schedule A — Response or Change to Conditions
DA Item Description
No
Response Rear tal acs
Action By
Land Use ;
-_ —T—
1 Development undertaken in accordance with this approval must The development has been amended AMPM |
generally comply with the approved plans of development. The to accommodate soccer, athletics and |
approved plans are prepared by Callaghan & Toth and numbered cycle criterium. |
0513-04A to 0513-07A and dated September 2006; 0513-08A and Refer GHD drawings 41-22382 —SK10
dated September 2006; 0513-09 to 0513-10 and dated 24 Feb 2006; Rev 3, SK11 Rev 3, SK12 Rev 3, SK13 i
0513-11 and dated 28 Feb 2006; 0513-12A and dated August 2006; Rev 3, SK14 Rev 3, SK15 Rev 3, SK16 '
0513-13A to 0513-14A and dated September 2006 as may be Rev 3, SK17 Rev 3 & SK18 Rev 3. |
amended by these conditions. |
2 The development must be undertaken and operated in a manner that | Noted
causes no detrimental effect upon the amenity of the neighbourhood |
by reason of the creation of excessive noise, lighting nuisance or other
emissions. |
!
3 The open space and setback areas are to be landscaped in accordance
with Council’s Policy on Landscaping Guidelines and a properly
prepared landscape plan prepared by a suitably qualified Landscape
Architect or Horticulturalist. Such landscaping is to be completed prior
to the premises being occupied and maintained at all times
thereafter.
In particular the following requirements shall be included in the
landscape plan for the development area:
1.1 10m wide screen planting buffer Ref Blackburne
provided Jackson Drg. 6189
SKO1 Issue C
1.1. native buffer screen landscaping shall be provided along
the Eenie Creek Road frontage of the development area,
and shall effectively screen the development from Eenie
Creek Road. It is envisaged this buffer shall be a
minimum of 10 m wide, and that the screen planting for
the western oval may be located within the road reserve
Page 23
Schedule A — Response or Change to Conditions
py Wu OL exelde la)
1 Ke)
1.2.
1.3.
1.4.
1.5.
1.6.
1.7.
1.8.
if necessary;
the northern most existing bluegum tree (or the two
northern most trees if possible) shall be retained in the
final design of the development, unless otherwise
approved by Manager Land Use;
remaining open space areas within the proposed
development part of the site shall be landscaped with
endemic plants where no conflict occurs with the
proposed sporting activities;
the periphery of the developed part of the site shall be
cleared of weeds, and existing native plants reinforced
with further plantings of endemic species to create a
sustainable ecosystem;
the entire area shall be stabilised with grasses and
vegetation to obtain 80% ground cover per square metre
within 45 days of the completion of earthworks;
landscaping shall incorporate a minimum of 100 shade
trees throughout the site in safe locations for cyclists.
the western existing vegetation core wildlife corridor
shall be planted with endemic koala food trees and other
necessary species to reinforce the local sustainable
ecosystem in consultation with the Manager Land Use.
the existing batter at RL25.00 at the property frontage
shall be retained and landscaped as a visual buffer except
for access to the site.
Response
1.2 Three of four trees retained, one
removed to allow for criterium track.
1.3 Yes
1.4 Yes
1.5 Yes
1.6 Yes
1.7 Endemic koala food trees to be
planted along western boundary 10m
clear of criterium track.
1.8 Existing and Design contours and
sections provided to show the need to
remove the batter.
To include the cycle track, carparking,
hited
GHD SK10 Rev 1
BJ 6189 SKO1 Issue C
BJ 6189 SKO1 Issue C
BJ 6189 SKO1 Issue C
BJ 6189 SKO1 Issue C
BJ 6189 SKO1 Issue C
Refer to SKO31 RevA
and SKO40 Rev A
Earl h]
Page 24
Schedule A — Response or Change to Conditions DA Item Description No 1.9, 1.10. 1.12. the batters to the criterium circuit shall be revegetated and stabilised with suitable native shrubs, native grasses or other suitable grass, and endemic trees where safety requirements permit. suitable native buffer plantings (min 1m high) shall be planted as close as practical to the criterium track where it traverses the road reserve to assist in preventing public access to the track, and provide a safe environment for competition cyclists. . non - potable recycled water shall be utilised for irrigation purposes. a suitable lightweight and aesthetic safety net (or suitable screening vegetation) is to be erected internal to the property boundary if cricket balls are likely to land within the Eenie Creek Road reserve. Response playing fields inside the nature reserve with maximum slopes of 1 in 3 there isn’t any flexibility in site levels. The front boundary will be screened with vegetation. 1.9 Yes 1.10 1- 1.5 m high bund provided with native planting. 1.11 Recycled water from STP is to be used for field irrigation. 1.12 Not required as field will not be used for cricket Reference BJ 6189 SKO1 Issue C BJ 6189 SKO1 Issue C pve telanh [4 All fencing to the Eenie Creek Road property boundary shall be coloured green or black and screened by native vegetation. No fencing proposed along Eenie Ck Rd boundary as existing cycle path crosses boundary a number of times. Note a landscaped bund will be GHD SK10 Rev 1
Page 25
Schedule A — Response or Change to Conditions
DA Item Description
No
Response
ita (lata ed
Action By
provided along Eenie Ck Rd frontage
with a high density of trees to secure
the site. Also fields will be fenced to
rohibit vehicular access.
p |
5 Existing trees on the site and within road reserves are to be retained, | Refer landscape plans BJ 6189 SKO1 Iss C
except where required to be removed due to construction and
building operations or the conduct of the approved use. These
landscape plans required to be submitted are to denote areas of
existing vegetation or existing trees proposed or required to be
retained.
y
6 Cleared vegetation is to be suitably processed by one of the following | This requirement will be included in
methods and removed from the site:- construction documentation.
1.1. Processing through a woodchipper or shredder. The
resulting mulch is to be stockpiled loose in heaps of less
than 1000 cubic metres, less than 2.5 metres high with a
minimum of 10 metres between edges of heaps.
1,2. The Applicant is advised that burning off is an
unacceptable method of disposal.
7 Any advertising sign or device is to comply with Council's policies on | No advertising signage proposed as
advertising. part of this development.
8 All hot water systems installed shall be either solar systems; electric | Gas hot water is proposed
heat pump systems; or gas systems (LPG or natural).
T
9 Secure bicycle racks shall be provided on site to accommodate a | Scooter parking and bicycle racks have | GHD SK10 Rev 1
minimum of 12 bicycles. The proposed bicycle racks shall be | been provided
identified on the landscaping plans and shall be located to the
Page 26
Schedule A — Response or Change to Conditions
DA Item Description Response
No
reasonable satisfaction of the Manager, Land Use.
Botte a
Action By
—t—
10 The proposed development shal! have all kitchen, laundry and
bathroom fittings that comply with the AAA Water Conservation
Rating System as defined by the AS/NZS 6400 (Water Efficient
Products - Rating and Labelling 2003) and AS/NZS 3500 (National
Plumbing and Drainage Standard Part 1.2), with toilets to comply with
the AAAA Water Conservation Rating System. All tap ware and shower
roses shall not exceed a maximum flow of 9 litres per min.
Dishwashers and washing machines are excluded from this
requirement.
Included in building specification
[_
11 The section of the criterium track located within the Eenie Creek Road
reserve shall not have any permanent fence installed within the road
reserve for the sole purpose of preventing public access; and the road
reserve shall remain available for any future road duplication
requirements as considered necessary by Council.
the Eenie Ck Rd reserve.
Criterium track does not encroach into
GHD SK10 Rev 1
12 Adequate safety strategies shall be put in place for the part of the
track located within the road reserve when the criterium track is
utilized for competition.
the Eenie Ck Rd reserve.
Criterium track does not encroach into
13 The requirements of this development approval are to be effected, | Noted
prior to the use of the premises.
14 Prior to the commencement of development, the following
Development Permits must be obtained:-
1.1. Development Permit for Building Works;
1.2. Development Permit for Operational Works of
landscaping, car parking and access, frontage works,
LL stormwater drainage, sewer reticulation (including new
in due coarse
1.1 BA will be sort for the clubhouse
1.2 SCRC DA Planning confirmed that
Page 27
Schedule A — Response or Change to Conditions
DA Item Description Response
No
mains, relocations, diversions, pump stations and rising
Operational Works Approval is
recat)
Action By
mains), roadworks, site civil works, water reticulation and exempt for this development
earthworks/filling of the site.
15 The Development Permit for a material change of use of premises | Request extension to the 21
lapses if the use has not happened by 21 December 2010 unless an | December 2012 for Development
application to extend the currency is approved by Council. Permit to allow for staged
development of the project
{
Land Development a
16 A vehicular access road to the site shall be constructed from the Eenie | Vehicular access provide to the site For details refer
Creek Road/Langura Street roundabout generally in accordance with | from the Eenie Creek Road/Langura GHD drawings
proposal plan 0513-0SA dated 28 February 2006 and prepared by | Street roundabout C001 to C012
Callaghan & Toth.
17 All vehicles shall enter and leave the site in a forward direction. Provided | For details refer
GHD drawings
C001 to C012
Carparking
18 Carparking shall be provided within the site as shown on drawing } Car parking has been provided as per
number 0513-05A dated 28 February 2006 by Callaghan & Toth, | GHDSK10 Rev 1
except as modified herein.
19 A minimum of 100 uncovered carpark spaces shall be provided on | 100 car parks & 3 disabled provided GHD SK10 Rev 3
site, including 3 clearly defined disabled carpark spaces.
20 The carparking area shall be designed to comply with the provisions of | The revised carpark layout meets the GHD SK10 Rev 3
AS 2890.1-2004 for user class 2 with allowance for vehicles to enter | requirements of AS2890.1-2204
and leave the site in a forward gear and with a minimum head
Page 28
Schedule A — Response or Change to Conditions 37 <a Leet eL eco al Response Xo ae saat Neate No clearance (headroom) at any point of 2.2m. 21 The proposed set down area, bus stops and water truck refilling stop | Noted — Linemarking will be shall be line-marked with chevrons and have appropriate words | completed in stage 2 and will comply painted on the pavement. A sign shall also be provided to indicate | with Condition 21 | that the areas are for “Set Down Areas”, “Bus Stops” and Water Truck : Stop” respectively, and that “No Parking is Permitted”. Grass shall be couch, free of weeds. works will be in line with the Planning Scheme Policy PSPO3 Landscaping Plants and Guidelines, complying with preferred planting species and taking | into account existing site conditions | including existing vegetation, aspect, soil type and conditions, pedestrian and vehicular circulation / access, communal and private open spaces, shade and sunlight, character of the surrounding lots, desirable and undesirable views, outlooks from neighbouring locations and connectivity within the locality. Planting design shall be for low 22 All car parking shall be kept, maintained and line-marked in a | Noted | condition fit for use. . | Frontage Works _—_ ‘ 23 Footpath improvements such as topsoiling, grassing, and tree planting | Foothpath improvements along the | are required to the Eenie Creek Road frontage of the site in | Eenie Creek Road frontage includes accordance with Planning Scheme Policy PSP1 Landscaping Guidelines. | grassing and planting works. These | i |
Page 29
Schedule A — Response or Change to Conditions DA Item Description i Ta) —| Response maintenance and sizes and layouts shall also be in accordance with the planning Scheme. Mulch types and planting techniques shall be outlined in items 25-31 of the policy. Reference Action By 24 A new full width concrete or paved path shall be constructed along the Eenie Creek Road frontage of the site in accordance with Council’s design standards. Care shall be taken to protect any existing vegetation and/or any underground services. New path to be constructed on new alignment in accordance with SCRC requirements, refer Nigel Walker GHD SK10 Rev 1 25 Stormwater Drainage Roof runoff from the new building shall be directed to a rainwater storage system or tank (minimum storage 12 litres/m? of roof area) that is installed to ensure water from the tank can be used for external uses (such as watering gardens, irrigation, ornamental ponds, water features, outdoor cleaning, etc) and for use in flushing of toilets internal to the building. All rainwater tanks are to be designed and installed in accordance with the Queensland Development Code (QDC), Part 25 - Rainwater Tanks, and shall be part of the plumbing application in conjunction with the building approval. The location and capacity of the tanks shall be clearly shown on the plans submitted for Building Works approval and any overflow shall be directed to the proposed stormwater system. Rainwater storage is included in building design. 26 As the site is proposed to be filled, appropriate stormwater drainage pipes shail be installed within the site to collect and discharge stormwater runoff from ail adjoining properties to prevent additional ponding/flooding on these properties. No adjoining properties are affected by the development. For details refer GHD drawings C001 to C012
Page 30
Schedule A — Response or Change to Conditions Py Sta) No 27 Description To ensure that polluted run-off does not enter Burgess Creek, stormwater shall be treated generally in accordance with the Stormwater Quality Management and Assessment Report dated September 2006 and prepared by Callaghan & Toth. The system shall ensure that stormwater run-off from the carparking areas and the driveways shall have the first flush (the first 12 mm of rainfall or hose- down) collected in grease/oil arrestors prior to entering the proposed GPT’s and bioretention zones. The proposed GPT’s may be designed with grease/oil arrestor capacity. All other clean stormwater, such as roof water, can be collected on site and discharged through a single underground drain line directly into the existing drainage system, bypassing the grease/oil arrestor. To this end, a detailed management plan shall be prepared for the proposed stormwater treatment system, which shall be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. A Development Permit for Building Works shall not be granted until a Development Permit for Operational Works has been issued in regard to the drainage scheme. Response Stormwater bioretention and infiltration system included in design as per “Girraween Stormwater Management Plan” by Ecological Engineering. Stormwater calculations provided detailing sizing of pipes and pits as well as bioretention pond. Reference For details refer GHD drawings C001 to C012 Action By All site stormwater drainage shall be by means of a gravity system. Yes 29 —t. All stormwater drainage lines including inter-allotment drainage shall be inspected by closed circuit television (CCTV) prior to commencement of the approved Use. CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council following satisfactory completion of construction works. The developer will be responsible for the full cost of CCTV inspection, including any additional inspection necessary following To be included in construction documentation
Page 31
Schedule A — Response or Change to Conditions DA Item Description No defect identification and rectification. This charge is payable prior to the issue of Operational Works approval and will be determined on the unit rate basis current at the time of approval. Response ite Action By Sewer Mains 30 The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in accordance with Council’s standards and requirements at no cost to Council. Sewer pump station to be installed with clubhouse construction. Waste water to be pumped to contro! manhole adjacent to sewer treatment plant as determined by SCRC Water The proposed package sewerage pumping station shall have emergency storage tanks with a capacity of 24 hour storage to minimise risk of spillage to Burgess Creek. The standard EOne design drawing shows the capacity in the WW is 3.15kL. Based on our conservative design estimates, the Average Day Flow is approximately 3.8kL/day. Therefore the storage equates to approximately 20 hrs. This is a duty/standby pump arrangement so it should be ok. Alternatively it is possible to increase the tank size (if required). The system is a closed system so no spillage to Burgess Ck will occur. If the system fails it will simply back up. 10
Page 32
Schedule A — Response or Change to Conditions DA Item Description No Town Water Supply Response Bcactaray Action By or the blockage of, or interference with, any natural watercourses. Detailed site surveys indicating natural surface levels and contours of the adjoining properties must be provided with the application for a Development Permit for Operational Works for Filling and Drainage. This may require the design and construction of drainage pipes and/or an overland flow-path within the development site that caters for drainage from the adjoining sites for a design storm with an Average Recurrence Interval of 1 in 100 years. A private easement for the Drainage of Water encompassing the drainage pipes or overland flow- path will also be required. In this regard a Development Permit for Operational Works shall be obtained. Should evidence be provided to Council indicating that no additional ponding of stormwater will occur on the adjoining properties the requirement for the drainage pipes, overland flow-path and easement shall not apply. Design contours are provided with the earthworks plans showing no bunding/ponding of neighbouring properties occurs. 32 The site shall be connected to Council’s existing town water supply } A 150mm dia water main will be Girraween Water and be constructed in accordance with Council’s standards and | extended along Langura St. Main Extension requirements at no cost to Council. Figure 1 -attached Earthworks rT] T 33 Filling works required on site shall be carried out in accordance with | No neighbouring properties are | Earthworks plans Section 3.8 of Council’s Engineering Design Standards Manual and so | affected. show design as not to cause the additional ponding of water on any adjoining lands contours. 34 Acid Sulfate Soils As the site is located below the 20m AHD and above the 5m AHD, any The site has been tested for ASS, no Coffey Geoscience 11
Page 33
Schedule A — Response or Change to Conditions |
DA Item Description Response Xl tesvala) Action By
No
excavation works consisting of 100m? or greater which extends below | ASS found
5m AHD will need to be carried out in accordance with State Planning
Policy 2/02 Planning and Managing Development Involving Acid
Sulfate Soils. In this regard appropriate testing and supporting
documentation prepared by a suitably qualified specialist shall be
submitted to Council for approval prior to obtaining a Development
Permit for Operational Works.
‘Erosion and Sediment Control
Erosion & Sediment Control Plan GHD C003
provided
35 | any person acting on this permit shall prevent erosion and sediment
export from leaving the site. Site control measures such as silt
fencing, controlled gravel access to the site and controlled disposal of
waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and
sediment are required to be submitted to the Council for approval
prior to obtaining a Development Permit for Operational Works.
General
36 The developer must obtain all of the other Development Permits | Noted
referred to in the Decision Notice, prior to obtaining a Development
Permit for Building Works.
37 in suitably qualified Registered Professional Engineer shall prepare | All design drawings to be signed & Plans to be
engineering drawings and specifications for all engineering works that | certified by an RPEQ and appropriate signed.
will become Council infrastructure, which shall be submitted in | DXF file supplied.
conjunction with an application for a Development Permit for
Operational Works. In this regard a DXF/DWG file on GDA94 zone 56
grid of the proposed cadastre layout is to be submitted in conjunction
with any application for Operational Works.
12
Page 34
Schedule A — Response or Change to Conditions DA Item No 38 Description Digital detailed design drawings and calculations shall be submitted with any application for a Development Permit for Operational Works in respect of roadworks and stormwater drainage works. To avoid conflict with underground pipes or services, all existing and proposed services required by the development shall be shown on the plans. Response Design drawings and calculations supplied. Reference PXa deem oh] 39 To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au). As Constructed drawing will be submitted in ADAC format Any damage caused to any public utility during the course of construction shall be repaired to Council’s standards and at no cost to Council. Noted 41 Any alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site shall be at no cost to Council. Noted 42 The transportation of all materials to and from the site shall be undertaken in a manner such that no particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall be covered to prevent materials including dust being windblown from the vehicle. Noted 43 As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services and structures. All of which shall be submitted to Council for checking and for Council’s records. The data must fully detail levels for all engineering works including As constructed drawing specification to be included in construction documentation. 13
Page 35
Schedule A — Response or Change to Conditions DA Item Description No but not limited to drainage structures, finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au). Approval of works shalt not be granted until all As Constructed L | information has been supplied and accepted by Council. Environmental Health 44 The developer must provide waste storage and disposal facilities in accordance with Planning Scheme Policy No. 9 “Waste Management Multi-Dweillings and Commercial and Industrial Premises”, including an external imperviously paved area correctly sized for all refuse and recycling containers and suitably screened from public places and neighbouring properties. A bin wash area is required with a cold- water tap, hose and drain outlet connected to sewer. The drain outlet is to be designed to prevent storm water entry to the sewerage system and this can be achieved with a nib wall 50mm high and up to 700mm x 700mm wide (max 0.5m}, or alternatively the waste area can be roofed, or any other design approved by Council. Response Reference PYadtelim eh Waste storage and disposal facilities will be provided in accordance with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises. Details can be provide in the future when detailed design of the clubhouse has been completed. 45 All bin wash areas in excess of 700mm Square are to be roofed and the floor is to fall to a bucket trap with the waste pre-treated by a grease arrestor prior to discharge to the sewer. The appropriate backflow prevention devices are to be installed at the bin wash area. Bunding set above 75mm is required to exclude excessive rain-water entering these areas. Requirements will be included in detail design of clubhouse 46 A Trade Waste Application must be submitted prior to the issue of a Development Permit for Building Works. Noted 14
Page 36
Schedule A — Response or Change to Conditions |
DA Item Description Response Cried a Eva dream]
No
Requirements will be included in
detail design of clubhouse
Full truck access is to be provided to each grease arrestor and/or pre-
treatment device for cleaning and servicing. Where access is
restricted, a pump out line is required.
48 A completed Trade Waste application together with an applicable fee | Noted
and two (2) sets of professionally drawn plans showing the Trade
Waste requirements in accordance with the Noosa Trade Waste Policy
are to be submitted to Council.
—
49 The property owner will be responsible for any cost incurred by an | Noted
approved Cleaning Contractor relating to the cleaning, servicing and
contents removal from the grease arrestor, where access to the
arrestor is impaired or delayed.
The Trade Waste application fee of ($105.00) is required at the time
of the application.
51 Trade Waste requirements are required to be in place, inspected and | Noted
approved prior to the commencement of trading or operation. The
appropriate Trade Waste Permits will be issued following approval at
final inspection.
52 A place of food preparation and/or cooking is to have the liquid waste | Noted
connected to a Trade Waste fine, that discharges to an approved
grease arrestor of a size determined by Council’s Trade Waste Policy.
53 All liquid waste produced by the commercial section of the | Noted
development is “Trade Waste” and is to be treated as required under
the Noosa Trade Waste Policy prior to release to the sewer.
15
Page 37
Schedule A — Response or Change to Conditions DA item Description Te} Environmental Services Response Rtsii-e tale Action By 54 An Environmental Management Plan (EMP) shall be prepared and | EMP Provided implemented to ensure that the impact of the development, during construction and operation, on the environment is minimised and that the environmental values of the site and surrounding lands are protected and enhanced. 55 The EMP shall address the following issues in relation to construction and operational phases of the development: a. Legislative compliance; b. Vegetation protection; i. Including construction fencing delineating the development footprint shall be established and approved prior to Operational Works commencing. ii. Protection of area to the south east of the site containing populations of native plants, Macarthuria complanata, and scheduled “Rare” under the Nature Conservation Act 1992. Cc. Fauna and fauna habitat protection; i. Including that construction works do not occur during the breeding period of the Rainbow Bee-eater (Merops ornatus) and that a qualified ornithologist inspect the site prior to Operational Works commencing on the site. d. Weed & pest control; e. Soil erosion and sediment control; EMP Provided
Page 38
Schedule A — Response or Change to Conditions |
DA Item Description Response Baie yarey Action By
i Te)
Water quality protection;
i. Generally in accordance with the Stormwater Quality
Management and Assessment Report prepared by
Callaghan & Toth and dated September 2006.
g. Groundwater protection;
h. Air quality protection;
i. Acid sulphate soil management;
j. Waste management;
k. Amenity (visual, noise, etc) management;
I. Cultural heritage management; and
m. Bushfire control;
i, Including the need for any buffers being located within
the development footprint and not encroaching into
the adjoining vegetation.
This EMP shall be submitted by the applicant for approval by
Manager Environmental Services and Manager Land Use prior to
issue of a Development Permit for Operational Works.
56 Include field lighting to soccer & athletic ovals as per Webb Australia
Preliminary Field Lighting Design.
Webb Australia
Electrical Services
Prelinimary Sporrts
Field Lighting
Drg ESKO1 Rev P1
17
Page 39
Document List ‘Concept Plans™ Landscape Blackburne Jackson Entry Perspective 6189/SK01 Issue C — Landscape Concept Plan 6189/SKO2 Issue A — Preliminary Plant Palettes Civil Work GHD SKO010 Rev 3 — Site Layout SKO11 Rev 3 - Site Cross Sections SK012 Rev 3 — Criterium Track Long Section SK013 Rev 3 — Entry Road Long Section SK014 Rev 3 — Site Layout with Aerial SK015 Rev 3 — Criterium Track Cross Sections Sheet 1 SK016 Rev 3 — Criterium Track Cross Sections Sheet 2 SK017 Rev 3 — Criterium Track Cross Sections Sheet 3 SK018 Rev 3 — Criterium Track Cross Sections Sheet 4 SK031 Rev A — Site Sections North SK040 Rev A - Site Layout North Girraween Water Main Extension Figure 1 Clubhouse Mode Design 09486_SK000 — Location Plans & Site Plan — Clubhouse & Fields 09486_SK001 — Site Plan — Clubhouse & Fields 09486_SK003 — Reference Images 09486_SK100 — Floor Plan — Upper Level 09486_SK101 - Floor Plan — Lower Level 09486_SK200 — Elevations 09486_SK300 — Section A& B 09486_SK500 — 3D Perspective — Aerial View 2 09486_SK501 —- 3D Perspective — Aerial View 2 09486_SK502 - 3D Perspective — Lower Field View 2 & Upper Field View 4 09486_SK503 — 3D Perspective - Entry 09486_SK-cover — Preliminary Sketch Design Issue B Electrical Webb Australia J303B-ESKO1 Rev Pi — Preliminary Sports Field Lighting Stage 1 Earthworks & Landscaping Construction Documentation Earthworks GHD 12106 C001 — Locality Plan and Drawing Index 12106 C002 - Existing Features Plan 12106 C003 — Erosion and Sediment Control Plan 12106 C004 - Site Layout / 12106 C005 — Typical Site Sections 12106 C006 ~ Typical Sections and Stormwater Setout Table 12106 C007 ~ Bioretention Pond and Infiltration Swale Setout Plan 12106 C008 — Road 01 Sections and Setout 12106 C009 - Site Frontage Bund Setout 12106 C010 ~ Carpark Setout Plan 12106 C011 — Sports Field Setout Plan 12106 C012 - Track 01 Long Section — Sheet 1 of 2
Page 40
EEE ¥« —<— ee [ 12106 C013 - Track 01 Long and Typical Section — Sheet 2 of 2 Drainage Calculations Specification for Girraween Sports Precinct Earthworks Package - March 2010 Girraween Sports Precinct Environmental Management Plan (Construction) - May 2010 Landscape Blackburne Jackson 6189-L001-C - Landscape Cover Sheet & Key Plan 6189-L002-B - Stage 1 Landscape Plan 6189-L003-B - Stage 1 Landscape Plan 6189-L010-C — Landscape Details Electrical Webb Australia E100 A ~ Padmount Construction General Layout Drawings E101 A - Padmount Construction General Layout Drawings
Page 41
Blackburne Jackson Design Landscape | Interiors
Page 42
=e
oom,
et
nw
—— acne
os
eee’
5m FRANGIBILITY zs
SETBACK FROM / @ TREES AT CLOSE
ROAD 7 CENTRES TO
PREVENT
VEHICULAR ACCESS
MIN. 10m WIDE
BUFFER TO EENIE
CREEK ROAD
MIN. 10m WIDE
TUBESTOCK BUFFER
PLANTING
_-—_ TREES TO BE aang es
PROTECTED. pase,
ae en TURFED BIO-RETENTION
= EXISTING POND BY CIVIL ENGINEER
AND RETAINED
ae
eEne
10m FRANGIBILITY DENSE
SETBACK PLANTING TO
PREVENT
PEDESTRIAN
eo \ ACCESS ONTO
MIN. 10m. \ TRACK
WIDE BUFFER
TO EENIE
CREEK ROAD
MIN. 10m WIDE *
TUBESTOCK
BUFFER
PLANTING
aan Ay
PLANTING TO \V
BATTER AS
SHOWN
TUBESTOCK
REVEGETATION \
PLANTING TO NATUREY,
REFUGE AREA
_—
10m FRANGIBILITY SETBACK
Landscape Concept Plan
DAS Issue C 7
Oo
oo
sO
a
94.2
| Sunshine Coast
a | STOLONISED SPORTSFIELDS
a GENERAL SEEDED AREAS
Begs} TURFED AREAS
= GENERAL PLANTING AREAS
FRANGIBLE DENSE SCREEN
PLANTING TO FRONTAGE
NON-FRANGIBLE DENSE SCREEN
PLANTING TO FRONTAGE
ae FRANGIBLE REVEGETATION
PLANTING AREAS IN WILDLIFE
REFUGE AREA
m= NON-FRANGIBLE REVEGETATION
PLANTING AREAS IN WILDLIFE
REFUGE AREA
NEW TREES
| PROTECTED AND RETAINED
EXISTING TREES TO BE
REMOVED
>) PROPERTY BOUNDARY
— EXISTING TREES TO BE
ae.
p +H
f
a = _]
PATHS
ANENT A -cFF WHITE
MENT T AN "
X METROPOLIS SEA PEARL #84681 2 PACK
Ua) 2601. OULL
a ae
WHEELIE BIN ENCL
MARINE GRADE 316 (MSC POSLSM
CYCLE RACKS
TODDARTS STANLESS STEEL MARINE GRADE 316 ME STANDING (MSC POSLSM DETAIL
DRINKING FOUNTAIN
SHANE Sa ARSOL LITE TRADE SUPPLIES SUPASHADE PLUS COLOUR “DARK BLUE DENIM”
Blackburne Jackson Design
re | Landscape | Interiors
Page 43
| Council
lex
lIONA
sunshine Coast Reg
Girraween Sports Com
General Planting
Frangible Revegetation/Buffer Zones
|Sunshine Coast
Regional Council
Non-Frangible Revegetation Zone
Preliminary Plant Palettes
6189/SKO2 NTS Issue A 01.04.2010
CODE | BOTANICAL NAME COMMON NAME | ‘MaTuRE | MATURE [POT Sez POT SE ROWER ISUGGESTED note: All revegetation shal be SOmm tubestock note. All revegetation shall be 50mm tubestock
HEIGHT. | SPAEAD | HEIGHT | SPREAD |COLOUR|_ POT SZE cone [ SOTANICALNAME | COMMONNAME | CODE |. _BOTANICALNAME | COMMONNAME |
TREES UBS TREES
ACA tim [ACACIA fimbriata Brisoane Wattla Som 3.0m 1am [10m [yew [450 RAE ky |BAECKEA frnescans Woeping Rookas —_ [v/et Hath [AGA con [ACACIA concurens Black Wate Regrowth area
BAN tat IBANKSIA itegrilola Coastal Banks a 5.0m 2 Om 18m 10.81 elu |45_ BOD wi IOODONAEA triguetre : Hop Bush ‘Genera! IACA dis _ |ACACIA disparrima Hickory Wattle Regrowth urea.
BUC cel |GUCKINGHAMIA caltcaima teary Cart Tee 1g.0m 30m 2am (10m laean (as. RAE al |MELASTOMA mdaoatiioun {Btue longue vet Heath tp exe IALPHITONIA wcelsn Pink Ash Resyoath ares
eas oasuaruva mts ee pe epee pe fee EROUND OVERS, VINES EGPASSES—_ — borin loos nomeas ~~ [Pek teodo0d [Ronen aus
oni kick Sor Oak 16.011 On SE On yA a eur unywal estan Area SIS anaes Sos , rn 3
[cup ana [CUPAN CPSIS anacardolaes Tuokeroo iS. som [tam [10m fwnno [4s CON at [CONMELINA chit Scurvey Woud General ae ane aeons cee ruck San pace =
ELA outs JELAEOCARPUS aurreandi Eumunel Guandora 1O.0n [30m Tom (Oem loean (2s. CYP po [CYFEAUS nolystachyos Bunchy Saco véet Hoath Sura FUCAL ‘basta [Swamp ManenanyTRoqrowah aa
uc SR [EUCALYPTUS ctychocama "Summer Reo |*Summer Rec” 5.0m 3.0m, 1.5m 0.8m, red. 45. IGAH si _ [GAHNIA sieberiana Sword Sedpe Vier Hoath UC mk = ar —- vu a as :
GLO ta [GLOCHIDION ferainanai Crass Tree 13.0 3.001 1am 100 INA 45 IMP cA _|IMPERATA cyinct ca Binsey Grass. Genera! ie JEUCAL STUCTOCONYS. jabouwonr Regrowth arco
MEL qui [MECALEUCA uuiauuner sic Paperburk em 3.0m 2m ___]o7m _facan _[25. LYG mie [LYGODIIM micropnyam — [cambing macannane/ptens wea EUC pro JEUGALYPTUS propingua _|Grey Gum Regrowth ares
SHROBS PTE ase | PTERIDIUM escurentum Bracken Fen viet Heath EUG 19s _JEUCALYPTUS vastitorg, Red Mahogany Rogrorth ies
ASP ola [ASPIOISTRA elatior (Gast ron Plant 6.6m foam [NA [200m ena aus [PHRAGMITES australs Common read viewans Arca EUC ban |EUCALYPTUS hancott Barcrott's Red Gum _|Reqrowtn area
ALP cae (ALPINA caorukss Nut ve Ginger 1.5in lo.2m |wito [140i ISCHixe TSCHOERUS Devitolius Sphey Sedge Vella Awa EUC sid__JEUCALYPTUS siderophvoia __|Grey tronbark RogrowAn area
ALP cao TALPINIA caondea Native Ginger 1.5m white 203mm. ryP on HYPHA overanl= But Rushes Wletana Area GLO sum _[GLCCHIDION sumatmum __[Umbvalin Cneese Tres [Ragrowin area
ALP zor ALPINIA 7erumber Shel Ginger wnio. 340mm. KAN tl IXANTHORRRAEA ‘una Swamp Grass Ira [vet Heath LOP con _|LOPHCSTEMON contertus — |6rush Box Regioatn area
BAR L.P [HARCKEA viata “La Patita” neo __|209mm MAC tun _[MACARANGA Lanarius: Macaranga Rogrowin area
BAN nam {SANKSIA aemia Waku Banks helo 40mm MELqui |MELALEUCA quinguonenia__|Paner Birk Taa Troe |Rugiowtn area
BAN Tob [BANKSIA robur Swap Bunksir fareon | 140snen SHRUBS
BAN tub | BANKSIA rob Sars 10 Banksia green 120m - j ACA met |ACACIA metanoxvion Blackwood, Wottand Area
[SAN spi__ [BANKSIA spinuess Harpies Banik. bronze {200m Non Frangible Buffer Zone BAE tru |BAECKEA intascens Weep no Baekea Wer Heath
BAN CC |BANKSUA spinulosa “Coaslal Cusiticn® PCowstis Custion* prstows | 209s note: All revegetation sha! be SOmm tubestock BAN rob [BANKSIA robur ‘Swamp Banksia Vet Heat
EJG ie [EUGENWreinaadvana Besch Cherry white [209mm Coo [BOTANICA NAME [| COMMONNAME | DOD th IDODONAFA triqueira Hop Bush (Gonoral
IGAE HG __[SREVILLEA ‘Honey Gam! sHonssty Gorn” csnge |309men TREES MEL mat__[MELASTOMA maabathricum [Bie tongue Viet Heath,
IGREOM | GREVILLEA ‘O-angs Manmade" "Crnas Marnade" one 340men IACA con __|ACACIA concurens: Biack Wattla Regrowth area. IGROUNDCOVERS, VINES & GRASSES,
GRE sup | GREVILLES "Supa" Superb Grevilea H 209: ACA dis [ACACIA dspamma hickory Wattle. Regraaih aaa. BEd IBLECHNUM mxtoun Bunaw3l Véutland Aves
[HED spy THEDYCHIUM sp White Shes! Ginget whites 1st ALP exc | ALPHITONIA exassa. Pak Ash Reyruath ana. ICOM 1 [COMMELINA diffusa Scuryuy Weed General
HOV cru Ported Leat Hoves maswo _|i40mm COR int | CORY MBIA amorerex ia Pak Bloody0od Reg-owih arect CYP pol__ICYPERUS palystachyos Bunchy Sedge Vidor Hesisthy
iy | P \ wetites 12090 ICUP ana _|CUPANIOPSIS anacarcioises_{Tuckaroo Regrowth 8a GAH six IGARNIA sieberiana Sword Sadge Wot Hosth
Pak, is 203m IG! O sun |GLOCHIDION surnatraum, mtrella Cheese Tree |Regowth area MP cd IMPERATA cylindrica, ‘Blade, Grass General
MELALEUCA bracteata Povo rca _|203mm. OP con |LOPHOSTEMON coaienus _ |Erush Box. Regrowth aaa, LYG Tw {LYGODIUM marophylium Climbing maidentair [Wetland A-ea
MELALEUCA inant - Snow in Summa renze_}20}mm. MAC tan MACARANGA tanarius. RAscaranga’ Regowih area PTE esc [PIERICIUM esculentum Bracken Fen wnt Heath
aU = “ret owe Meron ae — eon Met. qui__[MELALEUCA quinquenanis [Paper Bark Tea Trea [Regrowth aaa PHR aus _|PHRAGMIIES australis Common rec Wetland Area
RAELALEUCA ‘lyri Three rer Myre ae +00 SHRUBS SCL bre_ISCHOENUS orevioies Stew Seooe péottand Aves
- : ‘ < ACA mel__ [ACACIA metancxyion Btackvood, Avetland Area TYP oi {TYPHA oriental Bui Rushes, Weatiand Area
Watts Lassiandsa ena 200i BAE Iu IBAECKEA trutesoens Weeping Bagkoa __|Wet Haathy AN tul___ [XANTHORRHAEA tava. Swamp Grass Troe [Wet Heath
Natwe Lacsianga prose [4c0rrwty BAN rot _ IBANKSIA robur Swaine Banksia Wet Hath
eo" Fi Fire tect [203mm
METROSIDEROS a Fai Fico eck sOonm DON ti IQODONAEA siquetra rop Sush General
~ MEL mal] ELASTOMA melsbattrioum [Blue tongue Wet Heath
METROSIDEROS “Thomass’ IN.2. Chitstinas Tree eo 20%n
: IGROUNDCOVERS, VINES & GRASSES
METROSIDEROS "Thornas’ IN.2. Chinstnas Tree. recs 303i ale: ,
WESTRINGIA rutcosss Natio Rovorsry pape 120dmnm BLE ind_IBLECHNUM ndcum Bunawal Wweviand Arca,
WESTRINGIA zena Ovan Coastal Rosamary mga [140mm [OM crt ICOMMELINA chitursy Scunvay Woed (Genera
IGROUNDCOVERS, CLIMBERS & GRASSES ICYP pol__ICYPERUS potystachyos. Eunchy Scooc Wet Heath:
TANIA TANIGOZANTHOS “By Rea Ka7caro0 Parr Gam fred 70mm JGAH sio_IGAHINIA siabenane Swore Sedge Wet Hoth
ANIGG [ANIGOZANTHOS “Bish Gow Kancaoo Paw a2 ew ism IMP cy _NIMPERATA cyinanca, Bladey Grass Gonorcs
ANIBS —_[ARIGOZANTHOS “Bush Surisat” Kangaroo Paw 6.3m fourgunay | 14010 LYG mic__]LYGOOIUM microprytum __|Cimbing natenhaw_{Wetland Area
ANI TT JARIGOZANTHOS “Triple “reat® IKanecusoo Pave 6.2m [rea/qroon} 209m PTE esc [PTERIORIM esculentum Bracken Fen Wet Heath
CAR app _ [CAREX appressa Cares NA WA tu PHA ous IPHRAGMITES austrats Common rood Wevand Arca
CAR ga [CARPOBKOTUS gaucescans He Face lo2m_—|pnk [140mm ISCH bre |SCHOENUS brevilotus, Spikey Sedge Wetland Area
CS ant [CISSUS antarcuca ikarcnr00 Vino 2m trean _1140mm. [TYP or___UTYFHA orientats. Bult Rushes, Welland Ares
CRioed —_[CRINUM packineudatum Seceanp Lily fo.2m_—_[wnte 110mm AN tut [XANTKORRHAEA tuva Swap Grass Trea _ [Wet Hesth
DA re DIANELLA b-evipeduncu‘ata: Flax Lily 0.2m, hue 140mm.
GRECO [GREVILLEA snp ‘Cooroara Cascaci” *Cooroora Cascada" Joan fyetow _|rzorm
HB sca [HIBBERTIA scandens Snake Ving loam fyetog, _fi4omm
ISQ.nod __|SOLEPIS “iodosa foam INA ]3.40mm
JUN ui JUNCUS usitatus (hei) INA. 440me1
Lok nys_[LOMARORA foam feraam [340mm
LOts ion [LOMANDRA ‘@ fo.2n Iowan |s20c00
LOM nya _[L.OMANOAA iengiloia "Nyala" O20 deem [440mm
MYO all IMYOPORUM alinticum: }O.2et iwi 140mm.
MYO par RAYCPORUM pardiotum }0 2en PWD 340mm
VIG hed VIOLA hadaracaa [0.20 mauve [140mm
Blackburne Jackson Design
Architecture | Landscape |! Interiors
Page 44
(Se PROPOSED ROAD PAVEMENT =z PROPOSED FOOTPATH ae) PROPOSED CRITERIUM TRACK CZ PROPOSED ARCH OVER CRITERIUM TRACK ma PROPOSED BIO-RETENTION AND FILTRATION AREA Xl STORAGE AREA RETAINING WALL PROPOSED TUBULAR FENCE EXISTING PROPERTY BOUNDARY PROPOSED PROPERTY BOUNDARY COUNCIL SURVEYED TREE LINE ____________UNEOF GIRRAWEEN NATURE RESERVE EXISTING CREEK LINE ———_— ror anrren —— —— — _ __ to€cor garter STORMWATER UNE 166! SPOT LEVEL SITE DRAINAGE FLOW ARROW * EXISTING TREE TO BE REMOVED % EXISTING TREE TO BE RETAINED SENIOR SOCCER FIELD SOCCER FIELD \ ; \ PRELIMINARY (100 x 64m) 3 | REVISED FOR CLIENT COMMENTS lyby/10 | xk L cc 2 | ISSUE FOR APPROVAL oato | * rev | description appid | date SUNSHINE COAST REGIONAL COUNCIL GIRRAWEEN SPORTS PRECINCT SITE LAYOUT pay Ep CLIENTS | PEOPLE | PERFORMANCE 46 Innovation Parkway Kawana Business Village, Birtinya QLD 4575 Australia PO Box 1540 Buddina QLD 4575 T 61 7 5413 8100 F 61 75413 8199 E [email protected] W www.ghd.com CConeitions of Use: This document may only be used by GHO's cient (and any other person who GHO has agreed can use this document) for the purpose for which i was scale | 1:1500 for A3 job no. ee . g B 0 1§ 30 45m date | JAN 2010 revno. | 3 ee ‘SCALE 1:1500 AT ORIGINAL SIZE - approved *C COOK SK010 Plot Date: 14 May 2010-943 AM Piolted by: Alanna Hall/BirtinyaGHOVAU Cad Fite No: G\41\22387\CADD\Drawings\41-22382-eh010.d0g
Page 45
CRITERIUM TRACK CRITERIUM TRACK CRITERIUM TRACK i DESIGN SURFACE | __— s | | ey XX NATURAL SURFACE SECTION LANDSCAPE BUFFER (10m MN} 5 g g ; z | | # cay uw (C SECTION CRITERIUM TRACK | | Prot Osta: 14 May 2010-9:45 AM Piotiod by; Alanna HalyBininya'GHDVAL) (Cad File Na: GMI22382\CADD\Drawings\4 1-223824h11 t.deg, (B SECTION @ (KA SECTION @ CRITERIUM TRACK Q 1 20 30m — SCALE 1:1000 AT ORIGINAL SIZE EENIE CREEK ROAD PRELIMINARY 3 REVISED FOR CENT COMMENTS fg/esho | Ox 2 ISSUE FOR APPROVAL oano | ‘cc rev dascription app'd date SUNSHINE COAST REGIONAL COUNCIL GIRRAWEEN SPORTS COMPLEX SITE CROSS SECTIONS = ED CLIENTS | PEOPLE | PERFORMANCE 4-6 Innovation Parkway Kawana Business Village, Birtinya QLD 4575 Australia PO Box 1540 Buddina QLD 4575 16175413 8100 F 61754138199 E [email protected] W www.ghd.com Conditions af Use: This document may saly be used by GHD's chent (ard any otter parson who GHD has agtend can use th’s ¢ocumart) for the purpose for which & was Qrepared and must not ba used by any other parson or for any other purpose, scale | 1:1000 for A3 job no. | 41-22382 date | JAN 2010 revno. | 3 approved *CCCOK SK011
Page 46
(OH 66424 RL 124
JOP CH 704 12RE, 20.48,
OATUM RL. 9.00 .
VERTICAL ALIGNMENT Asiihjm eed uit 22751
EF Ss:
HORIZONTAL ALIGNMENT “ast ates Lait 4175000 rd L=100 705
LEVEL DIFFERENCE
CUT -/FILL+ B88 2s § 8 g a8 8 gs 3 3 = 2 §
DESIGNSURFACELEVEL |Z «8 5 g 8 g g 2g g§ g #2 8 g ge 8 S
ss ao x oO: 2 2 2 8 ag ga z = =z x =
EXISTING SURFACE LEVEL [= =a 2 os 3 & & eR a as 2 2 Ss s &
ie af z 2 z 2 2 Ra g ra z z R 8 g
CHAINAGE ig 28 8 38 = 8 g gx 3 28 5 3 e 8 5
3 $5 gs 8 2 2 22 Eg 22 3 2 =. 8 =
S
a
z
g
é
=
5
z
z
3 8 &
& z =
2 g
g E
5 DESIGN SURFACE a
a 5
Lo 3
! . 7
'
“Io- le a
OATUM RL. 10.00 : | , :
VERTICAL ALIGNMENT a
= Guore
225. 0rn is = c m f 554 1
HORIZONTAL ALIGNMENT ian aes ke 4825 36m pos yee - [kai tra} i2e5 ‘ae be 7in ee Leds he
LEVEL DIFFERENCE
CUT FILL 5 35? $55 5 3 3 B 888 g Ran 2 8 2 28 a8 3
DESIGN SURFACELEVEL —_|E ES & 2 g 3 ge é z
csveumceva |p 38 pf: 55 3 ge 3 883 $B EE OES a af
EXISTING SURFACE LEVEL |e ag a st 2 ¢ 5 = 3 BS
eas Biz 2 ff f FF $ 588 i s35 0 38 a8 85 8
CHAINAGE g eB 3 8 g gay g 22 2 gan = 5 2
a g e @ g 8 g 8 2 5 8 = 85 Eg . 8
g ze g z #3 B32 & z ge 8 28 5 EEE a 8 32 a8 a3
Pipl Cate: 14 May 20-@48AM Plotted by: Alanna HaNBitayayGHIVAU
Cad Fide No: G4 11223871 CADD\Drnwings\41-22382-¢k012.dw9
VERTICAL SCALE 1:200
AT ORIGINAL SZE 9 2 =~ 4. Gm
wos O20 AOU
PRELIMINARY
3 REVISED FOR CLIENT COMMENTS fyfeSfic | 2X
2 ISSUE FOR APPROVAL oso | “cc
rev description app'd date
SUNSHINE COAST REGIONAL COUNCIL
GIRRAWEEN SPORTS COMPLEX
CRITERIUM TRACK
LONG SECTION
=
ED CLIENTS | PEOPLE | PERFORMANCE
|
4-6 Innovation Parkway
Kawana Business Village, Birtinya QLD 4575 Australia
PO Bax 1540 Buddina OLD 4575
7617 5413 8100 F 617 5413 8199
E [email protected] W www.ghd.com
Conditions of Use: This documsnl may oniy be used by GHD's chant {and any other
person who GHD has agreed can ute this document) for Lna purpose for which R was
Preparad and musi not ba used by any other parson or for any other purpose,
1:200 for A3 job no. | 41-22382
JAN 2010 revno. | 3
scale
date
approved *¢ COOK SK01 2
Page 47
CRITERIUM TRACK UNDERPASS SECTION
OATUM RL. 13,00
TRACK GL
)
3647 di 2
‘CREST CH 4147 AL 2073
6
&
x
PCHELURL
EENIE CREEK ROAD
IPOH 7S9 RL 1968
— RPBDY
PO iesesAL 78
NATURAL SURFACE
DESIGN SURFACE
EXIST KERB INV
‘SAG CH 28 4 RL 17.00
PCH AMT TES
CRIB WALL
CRITERIUM TRACK
RETAINING WALL SECTION (CH. 455 - 495
SCALE 1:100
0 1 2 3m
bas
A SCALE 1:100 AT ORIGINAL SIZE
NATURAL SURFACE 0 25, 50 | 75m
SCALE 1:250 AT ORIGINAL SIZE
VERTICAL SCALE 1:50
VERTICAL SCRETS) 9g 05 4.5m
at ORAL SUE 3m 9 5 10 15m
DESIGN SURFACE
PRELIMINARY
3 | REVISEDFOR CLIENT COMMENTS |yfosfvo | ZA_
2 | ISSUE FOR APPROVAL vaio | cc
rev description app'd date
SUNSHINE COAST REGIONAL COUNCIL
GIRRAWEEN SPORTS COMPLEX
ENTRY ROAD
LONG SECTION
=
VERTICAL ALIGNMENT
GD CLIENTS | PEOPLE | PERFORMANCE
HORIZONTAL ALIGNMENT
120m
6.02}
An ae
= 16500}
1213.8?m
Resim
Rael
bei} gin Leteeém
Ra t6 Tim 4-6 Innovation Parkway
Kawana Business Vikage, Birtinya OLD 4575 Austraia
LEVEL DIFFERENCE
CUT -/ FILE +
{a6
1m
1.865
20
20
28
22
4230
j2se
Be
403
sar
178
unt
1
Am
PO Bax 1540 Buddina QLD 4575
T 617 5413 8100 F617 5413 8199
€ bis [email protected] W www.ghd.com
4.04
20
201
20
1.98
DESIGN SURFACE LEVEL
1958
978
19.888
+] 2ar2
20.585
2m
ne
20.105
009
19.700
19am
saz
1670
1h?
17.90
VG
We
we
1522 4
18778
19.480
19885
2D
roast
Conditlans af Use: This document may only be usad by GHO'Ss ctiont (and any ochat
person who GHD has agreed can usa thie document) for the purpose for which ys
EXISTING SURFACE LEVEL
ae
ne
2
ag
ne 4
2%
2a
[ue
mn
Ze
26
at
ne
az
as
6a
wae
| waz
wa
188
me
prepared and must nol be used by any other person of for any ober purpose,
41-22382
2
ase
ne
waz
240
scale for A3 job no.
CHAINAGE
som
60.00
6144
ear
ro.
a7
e000
90.00
oes
106.54
110.00
114
000
wy
13000
too
date [JAN 2010 rev no, | 3
000
17288
120.00
$90.00
$91.9
Pick ste: 14 May 2010-9147 AM Plotted by; Alanna HawBirtinya/GHDVAU Cad Fae No: G:M1\22382\CAD Drawings \4 +-22382-813.deog,
LONGITUDINAL SECTION - ROAD 01
approved “C COOK _ §KO013
Page 48
SENIOR SOCCER FIELD (100 x 64m) Prot Date: 14 May 2010-S4BAM Plotted by: Alanna Hal/Birtinya/GHOVAU aot we q F A x rt PROPOSED CYCLING STORAGE AND Ped STARTI/FINISH SHADE STRUCTURE Pe. JUNIOR SOCCER FIELD } (60 x 40m) JUNIOR SENIOR SOCCER FIELD SOCCER FIELD (60 x 40m) (100 x 64m) " PROPOSED ROAD PAVEMENT PROPOSED FOOTPATH PROPOSED CRITERIUM TRACK PROPOSED ARCH OVER CRITERIUM TRACK PROPOSED BIO-RETENTION AND FILTRATION AREA STORAGE AREA RETAINING WALL EXISTING PROPERTY BOUNDARY PROPOSED PROPERTY BOUNDARY COUNCIL SURVEYED TREE LINE LINE OF GIRRAWEEN NATURE RESERVE EXISTING CREEK LINE TOP OF BATTER TOE OF BATTER STORMWATER LINE SITE DRAINAGE FLOW ARROW EXISTING TREE TO BE REMOVED EXISTING TREE TO BE RETAINED ‘SCALE 1:1500 AT ORIGINAL SIZE PRELIMINARY REVISED FOR CLIENT COMMENTS Mlesfro | a ISSUE FOR APPROVAL | oato | “cc description | app'd | date SUNSHINE COAST REGIONAL COUNCIL GIRRAWEEN SPORTS PRECINCT SITE LAYOUT WITH AERIAL (GHD) CLIENTS | PEOPLE | PERFORMANCE 4-6 Innovation Parkway Kawana Business Village, Birtinya QLD 4575 Australia PO Box 1540 Buddina QLO 4575 161 7 5413 8100 F 61 7 $413 8199 E bta1 [email protected] W www.ghd.com ‘Conditions of Use: This document may only be used by GHO's cient (and any other person who GHD has agreed can use this document) for the purpose for which i was prepared and must not be used by any other person or for any other purpose. scale | 1:1500 for A3 job no. | 41-22382 date | JAN 2010 revno. | 3 approved “C COOK SK014
Page 49
TRACK GL P BDY DATOMRE 1300 Pp BOY 3 DATUM RL 14.00 CH 200 DATUM RL. 1400 CH ISO 3 | REVISED FOR CLIENT COMMENTS fy/egho | Ck 3 3 cmv — Co a PRELIMINARY i. 2 ISSUE FOR APPROVAL 04/10 "cc . 3 rev description app'd date “| _ —_—_— —| SUNSHINE COAST REGIONAL COUNCIL = — ee GIRRAWEEN SPORTS COMPLEX paver . CRITERIUM TRACK CROSS SECTIONS SHEET 1 L—~ sh Ep CLIENTS | PEOPLE | PERFORMANCE ~ — — | |] 4-6 Innovation Parkway Kawana Business Vilage, Girtinya QLD 4575 Australia — RPBDY DATUM RL. 2020 1 PO Box 1540 Buddina QLD 4575, soe * sone - - : - _-- Lee 1617/5413 8100 F 61 7.5413 6199 E btat [email protected] W www.ghd.com Conditions of Usa: This document may onty bo uted by GHD's client (and aity otnar person who GHD has agrecd can usa this dooumont) for tho purpasa for which It wis propared and must nat be usad fry ay olnar parson oF for any other purposa, scale |1:250 for A3 job no. | 41-22382 Q 25 50 7.5m date | JAN 2010 revno. | 3 ‘SCALE 1:250 AT ORIGINAL SIZE cee - eee . . approved “CCOOK = |S GSKOI5 Prot Outs; 14 May 2010-945 AN Platine oy: Alanna HaS/Birinya/GHDVAU (Cad Fin Na: GM 122387 CADDADrawings 4122382 2015.deq,
Page 50
x m DATUM RL 11.00 CH S50 3 3 » n —_ tag DATUM RL. 19.00 CHEN ee mt Me n —_. — ts —_—_— 2 OATUM Rit. 10.00 CHAD QATUM RL 10.00 cH am 3 3 os x a ——— _— ——— — te OATUM RL, 10.00, CH 350 3 3 e tp D — __.~ eg OATUMRE. 11.00 CH 300 Pint Deia: 14 May 2010- 0:49 4X1 Plotted by: Alera HevBirtinya/GHDIAU Cad File No: GA IIZ2S82\CADDiDrewings\4 1-27392-61 016 cg PRELIMINARY 3 | _ REVISED FOR CLIENT COMMENTS [y/ogfo | A 2 | ISSUE FOR APPROVAL oate | “ce rev description app'd date SUNSHINE COAST REGIONAL COUNCIL GIRRAWEEN SPORTS COMPLEX CRITERIUM TRACK CROSS SECTIONS SHEET 2 = ap CLIENTS | PEOPLE | PERFORMANCE |] 4-6 innovation Parkway Kawana Business Village, Birtinya QLD 4575 Austrasa PO Bax 1540 Buddina QLD 4575 76175413 8100 F 617 5413 8199 E [email protected] W www.ghd.com Conditions of Use: Tris document may only be used by GHU's dient (and any other parton who GHD has agresd can use thia document] for Ure purpowe for wich il was, prepared and mus! act be utod by any other person oF for uny othor purpose. scale |1:250 for A3 job no. | 41-22382 0) 25) 50 75m date | JAN 2010 revno. | 3 cl ll approved “C COOK SK016 ‘SCALE 1:250 AT ORIGINAL SIZE
Page 51
TRACK CL
RP BOY
DATUM RL 20.00
CH oO
—
OATUM Re. 1800
CH 750
g
ge
_ z
te < 3s
~,
DATUMRL 14.00
CHT
a:
Bo 8
é a
Fog
or st the
_e ‘es
DATUMR.L 13.00 4 -
CH ESO
— —__ x '
8B 1
“ i
oO
I 3
ry
mn * tay
t
OATUM RL 12.00
CH 600
Phot Oats: 14 May 2010-849 AM Plotted by: Atznna Hal/Bianya/GHOVALS
Cad File No, GMA1ZZ3B7ACADD Drawings \4 1223826017 .0g,
PRELIMINARY
3 REVISED FOR CLIENT COMMENTS lyfogto | AA
2 ISSUE FOR APPROVAL 4/40 “cc
rev description app’d date
SUNSHINE COAST REGIONAL COUNCIL
GIRRAWEEN SPORTS COMPLEX
CRITERIUM TRACK
CROSS SECTIONS SHEET 3
Ep CLIENTS | PEOPLE | PERFORMANCE
4-6 Innovation Parkway
Kawana Business Vilage, Birinya QLD 4575 Austratia
PO Box 1540 Buddina GLO 4575
16175413 B100 F 61 75413 8199
E [email protected] W www.ghd.com
Cond.tione of Use: This document may anly 26 used by GHD's cient {and any olor
parcon who GHD fas agreed can use this document) for Ine purposa for which it was
prepared snd must not ba used by any other person of Sor arty other purpose,
scale |1:250 for A3 job no. | 41-22382
9 25), 50 | 75m date | JAN 2010 tevno. | 3
em
approved “CCOOK SK017
SCALE 1:250 AT ORIGINAL SIE
Page 52
— RPBOY —— _ —_—_ DATUM RL 20.00 an - 4 — De .: PRELIMINARY ; 3 REVISED FOR CLIENT COMMENTS fufasfro | JA g, 2 ISSUE FOR APPROVAL oato | -cc oo eet — rev description app'd dale eee SUNSHINE COAST REGIONAL COUNCIL GIRRAWEEN SPORTS COMPLEX CRITERIUM TRACK aTUM RL 2000 CROSS SECTIONS SHEET 4 ED CLIENTS | PEOPLE | PERFORMANCE — Rael —— ee 4-6 innovation Parkway Kawana Business Vilage, Binlinya OLD 4575 Australia PO Box 1540 Buddina QLD 4575 1617 5443 8100 F 61 7 5413 6199 E btatmall@ghd,com W www.ghd.com PATUM RL 200 . _ . oe Conditions of Uso: Thia document may Only D8 used by GHD'S ctient (and any other parson who GHD haa agreed con uss inis document) for Lne purposp for which it wis CH ED . prepared and oatl nol be ured by any other parson or for any other pucpase. scale |1:250 for A3 job no. | 41-22382 9 25° 50 | 75m date | JAN 2010 revno. | 3 al . , SCALE 1250 AT ORIGINAL SIZE . SK018 Pick Date: 14 May 2010-950 AM Pintted by: Alanna HalvBirtays'GHOVAU Cad Fae No: GMNZZIBACADOWDeawings\41-27582-01018.00g
Page 53
EENIE CREEK
| ROAD INV
Plot Data: 7 May 2010 -4:25 PM
Plotted by: Brett M. Johnson
(EN SECTION
Loo] SCALE1 20
|__CRITERIUM TRACK |
ee
ee
an — . | |
es
(0 -\ SECTION
SCALE! 2
x
uw
Fra
o a
Lu
z |__CRITERIUM TRACK
Lu
lu
EENIE CREEK
| ROAD INV
\
|
Cod FiaNa: GM 12730 2°CADD Drawings 1-22582-chO4 1 cdg
SECTION
SCA.E1 “0
CRITERIUM TRACK
(8 SECTION
Ke J cones an
CRITERIUM TRACK 1
(K™ SECTION
Loo] SCMLET 20
0 25 5.0 75m
(el
SCALE 1-250 AT ORIGINAL SIZE
PRELIMINARY
A ORIGINAL ISSUE
rev description appd date
SUNSHINE COAST REGIONAL COUNCIL
GIRRAWEEN SPORTS PRECINCT
SITE SECTIONS
NORTH
=
Go) CLIENTS | PEOPLE | PERFORMANCE
eel
46 Innovation Parkway
Kawana Business Village, Birinya QLD 4575 Australia
PO Box 1540 Budding QLD 4575
T61 7 5413 8100 F617 64138199
E [email protected] W www.ghd.com
Conditions of Use: This ly bm used by GHD's client (and any othar
person who GHD has egress document for the purpose far which it wat,
prepared and mutt nat be u! er person or for ary other purpose,
scale |1:250 for A3 job no. | 41-22382
date | APRIL 2010 trevno. | A
approved. ...... re . SK031
Page 54
PRELIMINARY Tev description app'd date SUNSHINE COAST REGIONAL COUNCIL GIRRAWEEN SPORTS PRECINCT SITE LAYOUT NORTH CLIENTS | PEOPLE | PERFORMANCE @) 48 Inno’ Parkway Kawana Gusinees Village, Birtinya QLD 4575 Austratia PO Box 1540 Buddina QLD 4575 1617 5413 8100 F 61 7 54136189 E biatmeliggghd.com W www.ghd.cam eeFt Conditions of Use: Thiz document may only be used by GHO' chiont (and any other parson who GHO has agreed can use this documend for the purpose for which it was prepared and mutt nct be used by any other person ox for any other purpose. scale ]1:250 for A3 job no. | 41-22382 date | APRIL 2010 revino. LA
Page 55
ES, RE CRI MOONA ip ign ee 1 LS 1 ee" p Wr 4 PF y Mm ER DN150 Water frain Extension Along Langura St - 440m Le a i fr Oh i AX ig Ng » s f LS” LEGEND Girraween Sports Precinet Job Number | 41-22382 ° ‘0 20 — . \ P == Detailed D Revisiol A — e Existing Water Mains (mm) =a ait esign vate 419 March 2010 < 100 mm 200-225mm 7 450 - 600 mm Map Projection: Universal Transverse Mercator 100 mm 250 mm oe > 600 mm aol Girraween Sports Complex . Honzontl Oat: Gescennic Daum of Aura 1804 150mm emma 300 - 375 mm Water Main Extension Figure 1 NAAUBitinyalProjects\41\2238 216 lsWiapinto\Water Service Extension wor © 2008, While GHD has taken care to ensure the accuracy of this product, GHD and SCRC, make no representations of warranties about its accuracy, completeness or sutabi (whether in contract, tort or otherwise) for any expenses, losses, damages andor costs (including Indirect or consequential damage) which ara or may be incurred as 2 resul SCRC Noosa GIS Data, March 2010. Created by: 1 Glass 6 innovation Pky Birtnya OLD 4575 Austalia 1 61754138100 F 61754138189 € [email protected] W www.ghd.com.au y particular purpose, GHD and SCRC cannot accept lability of any kind oduct being inaccurate, incomplete ar unsuitable in any way and for any reason.
Page 56
MODE
DESIGN
ANNONA OBO)
“S=S= PROPOSED CLUBHOUSE
sre
ie ify
G
tf ep
cf
cD
'
DRAWING LIST:
gaat
fe
!
:
yt
:
t
jf /
dy
MM
IW
E
a
Y
eee ~
f LOCATION PLANS SK 000
SITE PLAN SK 001
GIRRAWE EN “SP ORTS. PRECIN CT. ; ---—FLOOR PLAN= UPPER +_$K 100
ee
ih
TW IZA TE,
Mh
2 COL COU UID UUROTUY.
—
=
fil
i
is
IIT:
SY.
| >
phd
SP
BES AS pe eT ror car ng
St! ae q ST hone et HEU ee SK 200
nS: | Jo mT pea), ee
WT ds 32 10] DER: LV ee earth) Soe
TH. SUNSHINE COAST REGIONAL COW:N:Gle=; ie ser) © ss
Toe Tas a So pa _ SD VIEWS - (SHEET2) ©), _ SK 501 .
Sy hy bt - I ak “Te L. : ~ 30 VIEWS - (SHEET 3) Fe Sk502
| 270 TI i te | -
a rot a om “ms
/ ISSUE:...- ss PRELIMINARY SKETCH DESIGN oS
ISSUE B - 27th APRIL 2010
SKETCH DESIGN ISSUE
Sunshine Coast
™ PROPOSED CLUBHOUSE - GIRRAWEEN SPORTS PRECINCT . Suite 2/9 Capital Place Birtinya QLD 4575 EON Roum NRT csc et
PRELIMINARY SCHEMATIC DESIGN PROPOSAL PO Box 111 Moffat Beach QLD 4551 vas eae
Tel +61 75437 8574 Fax +61 75437 2716 .
E-mail [email protected] See
DRAWING No: COVER
base designs a Tolars are t-e copvrigt? of Mode Design Cora Pty te ana con ol be repronuced wibiout written sernussiony Brishane Sunshine Const Sydney Darwin Gold Coast
www.modedesign.com.au
Page 57
eas MODE
/ Dy SA (ch)
MANNER METHOD FORM
SUBJECT SITE
LOCATION PLAN 3 SITE PLAN - CLUBHOUSE & FIELDS
N.S. | SCALE 1:1500 SKETCH DESIGN ISSUE
RRS Lua OUSE Choate SPORTS PRECINCT errs
E-mail [email protected]
scale 1:1500
ang
www.modedesign.com.au
Page 58
FEILD - RL 16,560 FEILD ~ RL 16.670
FEILO ~ RL 16.670
FEILD - RL 16.670 FEILO - RL 16.670
SPECTATOR ZONE __ arr) LANDSCAPE
a QOTPATH
CH "
| tA KIDS PLAY AREA TERRACE
Vapi 1 $ — — § — — 4 — — 9 ~~ 9
J ! —"
TIS CLUBHOUSE we
FFL 20.000
T ae oe
I 1 _FERRACE
SPECTATOR ZONE = s *
vy
|
|
FEILD - RL 19.600 FEILD - RL 19.600
|
|
|
! ! . LANDSCAPE
4
| CARPARK -
| f RL 19.450
|
i | -
| 4
i _ |
|
SITE PLAN - CLUBHOUSE & FIELDS
“ SKETCH DESIGN ISSUE
Sunshine Coast
® PROPOSED CLUBHOUSE - GIRRAWEEN SPORTS PRECINCT OIRO RLM §=PROJECT No: 09486 SSC
PRELIMINARY SCHEMATIC DESIGN PROPOSAL 0 § 10 15 20 fe B08 Teele eae cee eee DATE: 27.04.2010
Ui td E-mail [email protected] iota 1:500 @ A3
Seale 1:500 DRAWING No: SK 001
These. dasignsaad plans ars4:-9-coprrighi of Made Design Coup. Ply Lig-ans con-ot be reproduces-titroumeritien permissar ~ Brisbane Sunshine Coasr «Sydney = Daiwiry Gata Caast
www.modedesign.com.au
Page 59
MODE
>) tI TcIN
MANNER METHOD FORM
SHIPPING CONTAINERS
ny ay
N\\\
AKA
fl
Il
TU
Ze
MTEL
TTT —
REFERENCE IMAGES
ARCHITECTURE
™ PROPOSED CLUBHOUSE - GIRRAWEEN SPORTS PRECINCT PROJECT No; 09486 SSC
RELIMINARY SCHEMATIC DESIGN PROPOSAL
DA Pape eet)
SCALE:
DRAWING No: SK 003
www.modedesign.com.au
Page 60
paaen . a seis renee egestas poe pp Ji oan RN ote ee . re eo ett i eee eset ae 2 P OP ® 9.600 ; 9.600 | 4.800 4e00 |, 4800 4.800 LOWER AELD (ATHLETICS & SOCCER) FEILD FENCE | DISABLED RAMP - 11:14 oo OBES alo of UNE OF ROOF OVER UPPER FEUD (SOCCER) | TO CARPARK | FLOOR PLAN - UPPER LEVEL Pimms SCALE 1.200 aa DESIGN ISSUE Sunshine Coast &@ PROPOSED CLUBHOUSE - GIRRAWEEN SPORTS PRECINCT Suite 2/9 Capital Place Birinya QLO 4575 | SRTOMROIM GSS PRELIMINARY SCHEMATIC DESIGN PROPOSAL 0 2 4 6 8 PO Box 111 Moffat Beach OLD 4551 By Ama Tel +61 7 5437 8574 Fax +61 75437 2716 A a | E-mail [email protected] Seas: MENG me scale 1:200 CRATING Seco Thase.designs and plans are the. copsrigt! ol Mode Design Corp Ply Lic one canaat ka raprocuced wilnou! wile sermiseion Brisbane Sunshine Coast Sydney Darwin Gold Coast
Page 61
9.00
PS PSP 8 ®
9.400
MODE
DESIGN
MANNER METHOD FORM
4800 4800
4800
4800 4800
FEILD FENCE
LOWER FIELD carulenis & SOCCER)
|
|
|
| |
To [oe
| |
|
4 ‘ ae
4
f SS
1 CHILDREN PLSYgRODND ZONE
| vos
4 “ m™
|
OFFICE B
10 {us
i. GSA)
SEUSS 8
ace
CLUBHOUSE OVER |
UPPER FIELD (SOCCER)
FLOOR PLAN - LOWER LEVEL
SCALE 1:200
® PROPOSED CLUBHOUSE - GIRRAWEEN SPORTS PRECINCT
PRELIMINARY SCHEMATIC DESIGN PROPOSAL
Thase designs avd plars are tne copytigh of Mode Design Corp Ply Le ea car oi’ Be reprocuced iow wily penmissiony
FEILD - RL 19.600
9 2 4 6 8
scale 1:200
Brisbane
vila df
Ve !
SKETCH
f
WoW fy
Sunshine Coast
Suite 2/9 Capilal Place Bintinya QLD 4575
PO Box 111 Moffat Beach QLD 4551
Tel +617 5437 8574 Fax +61 75497 2716
E-mail [email protected]
Sunshine Coast
Sydney Darwin Gold Coast
www.modedesign.com.au
DESIGN ISSUE
4800
PROJECT No: 09486 SSC
ays 27.04.2010
SCALE: 1:200 @ AB
PEI CR Ores) MeL)
Page 62
MODE
>) TeX
MANNER METHOD FORM
|
Bier ee ee FFL16.800/
2900 1299 4800 1 209 2400 49001209 3600, 2900,
2900 ,__ 3600 be! 4g00 2400 1200, 4800100, 2900, +
ELEVATION - NORTHERN ELEVATION - SOUTHERN
SCALE 1:200 SCALE 1:200
4 800 4800 4800 4800 4800 + 4800 Sy FFL 16,800
ELEVATION - EASTERN -
mi
TELLTELLELLO |
SERRE REE REE
4
i
k 4800 + 4800 4 4800 y 4800 _% 4800 i 4800 4 4800 P 4800 " 4800 L 4800 tL 4800 ' 4800 +
ELEVATION - WESTERN
SCALE 1:200 SKETCH DESIGN ISSUE
® PROPOSED CLUBHOUSE - GIRRAWEEN SPORTS PRECINCT Suite 2/ 9 Capital Place Birt he ee
Oo _2 16) 6 56 Darr eras es se ee ie
PRELIMINARY SCHEMATIC DESIGN PROPOSAI
(iii) td E-mail [email protected]
www.modedesign.com.au
Page 63
Thase desion: a dans are. t-s rapyrigh of Mode Dasiga Tarp Cyd ors at Re repremeneritenes wean pamussion
as | 2
UPPER FIELD | | ' a| =
(SOCCER) | CLUBHOUSE ' s| 2| >
| ' | =| ~
| | |
i} ___ffl.20000 UppERLeVE) oto de
——— TW FFL 19.600 “(UPPERFIELD). ef 7
f 3
| LOWER FIELD =| =
| (ATHLETICS & SOCCER) =
I _.FL.16800 QOWER LOE).
F “FAL 16.670 (LOWER FELD)
I '
|
1 I
| (
| ®) !
| 2.900 L 3.600 1200 | 4800 _ 2400 1200 1 4800 1200} 2900 |
7 7 4 7 4 7 7 {
gi | I ! bo bo 3
eI | | ! | | \ &
al ‘ ic
al \ | | | =
a \ ' ! Is.
Tome a | ee pot Se Sap
=! = t Ia oO
Soe [ote fe a np pe fe —-—
To oo PT i an en nn I
SPECTATOR ZONE we ee iF ' * g
UPPER FIELD o || 20 FTSHPPPING I | | | gl =
(SOCCER) ! CHANGEROOM1 =& || CONTAINER il | | S| a
“of (BEYOND) I “
oe wn LOI | | \
7 It ;
se sss a
== == Mig meee peepee pT S00 PEER FELD ) ---B\—J--- = =
weer | = : mori neeeeeeny epee ee e
' { | mL r | | SPECTATOR ZONE o
{ : : 7 ‘ : ' s
20 FI SHIPPING — — — = | | i LOWER FIELD s| =
1 CONTAINER tiles ‘ =
| | (BEYOND) i 4, i (ATHLETICS & SOCCER) S&S
vee Moo Loe mito 00 tower tere) —
| | T ——S “FAL 16.670 (LOWER ELD)
I I | | | | 1
SECTIONB | | | i
;
r ' SCALE 1-100 | bo SKETCH DESIGN ISSUE
Sunshine Coast
© PROPOSED CLUBHOUSE - GIRRAWEEN SPORTS PRECINCT Suts 2/9 Copal Place Gitinya GLO 4575 | ROME MENS
PRELIMINARY SCHEMATIC DESIGN PROPOSAL 1 2 3 4 PO Box 111 Moffat Beach QLO 4551 | prvi, ane
es Tel +61 75437 8574 Fax +61 7 6437 2716 ~
scale 1-100 E-mail [email protected] ic
Brisbane = Sunshine Coast «= Svdiney = Darwin Gold Coast
_ OUATGre cestst amen icll}
Page 64
fal -Miiloreme lol -ler-yereler many OLLVWSHOS AYYNINITS 8d - JSNOHEMND GaSOdO'd a WSOdOud NOISSC LONIOSYd SLHOdS NSSMVHHID ~ ~ m ml QO ks O (mM ” GQ) z ~ iW = m7 @ MANA WIY3V - IALOSdS¥3d OE WaOd GOHLIW YAINNVW
Page 65
MANNER METHOD FORM 3D PERSPECTIVE - AERIAL VIEW 2 ™ PROPOSED CLUBHOUSE - GIRRAWEEN SPORTS PRECINCT Suite 2/9 Ca tinya QLD 457 [oN se Mtr Ese RELIMINARY SCHEMATIC DESIGN PROPOSAL By oe ot ‘8°! Ba 27.04,2010 a on DRAWING No: SK 501 www.modedesign.com.au
Page 66
3D PERSPECTIVE - LOWER FIELD VIEW 2 3D PERSPECTIVE - UPPER FIELD VIEW 4 = SKETCH DESIGN ISSUE By Say 27.04.2010 eres DRAWING No: SK 502 ™ PROPOSED CLUBHOUSE - GIRRAWEEN SPORTS PRECINCT @ 2/9 Capital Place Birtinya QLD 4575 ASTON Soka RELIMINARY HEMA EF R SA doltat beac! PS www.modedesign.com.au
Page 67
YY] TT 0 nD tt LA | A | LL SD PERSPECTIVE-ENTRY SKETCH DESIGN ISSUE IMINARY SCHEMA IGN PROPOSAL POIBOX 111 -Motiat. Besa) Oe ae 27.04.2010 t . f SCALE; DRAWING No: SK 503
Page 68
aa
GIRRAWEEN SPORTS PRECIN
PRELIMINARY SPORTS FIELD LIGHTING
CT
)\
=
PB TO SUIT UP TO 10 OMLY
MVPSO? LUMINAIRES.
Mig POLYGONAL POLE POLE
AND ACCESSORIES TO BE HOT DIP
GALVANISED AFTER FABRICATION
FLUSH FITTING ACCESS DOORS TO
HOUSE LUMINAIRE CONTROL
a_i (ED AND GROUTED To
HIGH STRENGTH FOUNDATION BOLTS
TYPICAL ATHLETICS FIELD POLE DETAIL
ae +
eT TO SUIT UP TOS ONLY
MVPSO7 LUMINAIRES
a POLYGONAL POLE POLE
AND ACCESSORIES TO BE HOT DIP
GALVANISED AFTER FABRICATION
FLUSH 'SS DOORS TO
House ONTROL GEAR
BASEP| (ED AN GROUTED TO
vets
FOUNDATION BOLTS
4 Erase ronATEN Cane cast
K INT CONCRETE FOOTING IN
TYPICAL, (CONFIRM WITH
SOW TEST)
TYPICAL SOCCER FIELD POLE DETAIL
LEGEND
Tr TS
= SUUX~ 4 LUX
Aimy
LUMINAIRE DETAILS
OPTIVISION, AN ASYMMETRIC LUMINAIRE FOR DOWNLIGHTING THAT
COMBINES COMPACTNESS, VERY HIGH EFFICIENCY AND EXCELLENT PILL
LIGHT CONTROL. THE LIMITATION OF GLARE AND UPWARD LEAKAGE OF
LIGHT IS SECURED BY ASYMMETRIC OPTICS THAT ACHIEVE A MAXIMUM
INTENSITY AT 60° AND A SHARP CUT-OFF OF LIGHT AT 80°
CALCULATION SUMMARY
[cae
4 WX» 3 LUX
| 3 2UUK = LUX
P2_ PRELIMINARY ISSUE REVISED 07.05.10 MB. KG.
Pi PRELIMINARY ISSUE 0705.10 4B. 7
Se av ae
a
CONSULTING E.ECTRICAL ENCDEERS MECHANICAL CONSULTANTS, LIHTING CONSULTANTS
TECHWCLOGY SOMSULTANTS COMMUNICATIONS COKSULTANTS
mia
a
EMAL tamed ettauaralla ccm
Sunshine Coast
Regional Council
‘CALC TYPE MAK Tain
ATHLETICS INFIELD eS 7525 1 wa 059
ATHLETICS TRACK TLLUMINANCE Tx z 266 co 070 1) sates
SOCCER FIELD A TELUMINANCE tx 702 | Be 5, 082 as ome bins & ' :
‘SOCCER FIELO 8 TLUMINANCE ux was |_| we Yt DATE NTS MW. MB KG,
‘PprOeeT WG NO SION ONSET
LUMINAIRE SCHEDULE J303B = ESKO1 P2 1
‘SvMBoL | ARRANGEMENT | LUMENS | UF
7 2m [Ww SINGLE ___| 220000 | 0750 | STATUS
ATES eo eee tM | SINGLE zz0000 | 0.750 PRELIMINARY
= aN SINGLE [arse |
SOCCER FELD 8. = % = E eenee [750 | CONE DT TUE FO PADI DL NORIO war
(GekcahaTeanrtin actus ken se a2 tas
a
Page 69
GIRRAWEEN SPORTS PRECINCT EARTHWORKS CONTRACT SUNSHINE COAST REGIONAL COUNCIL DRAWING INDEX Sheet Number. Sheet Description. 12106 C001 LOCALITY PLAN AND DRAWING INDEX 12106 C002 EXISTING FEATURES PLAN 12106 C003 EROSION AND SEDIMENT CONTROL PLAN 12106 C004 SITE LAYOUT 12106 C005 TYPICAL SITE SECTIONS 12106 C006 TYPICAL SECTIONS AND STORMWATER SETOUT TABLE 12106 C007 BIORETENTION POND AND INFILTRATION SWALE SETOUT PLAN 12106 C008 ROAD 01 SECTIONS AND SETOUT PLAN 12106 C009 SITE FRONTAGE BUND SETOUT | 12106 C010 CARPARK SETOUT PLAN 12106 C011 SPORTS FIELD SETOUT PLAN 12106 C012 TRACK 01 LONG SECTION - SHEET 1 OF 2 12106 C013 TRACK 01 LONG AND TYPICAL SECTIONS - SHEET 2 OF 2 By the signing of this statement | deem to certify all drawings in this contract/project as listed in the drawing index, shown on sheet C001, as being in accordance with the Project Objectives. PROJECT REVIEW TITLE: DATE: / / 2010 SIGNED: ENGINEERING CERTIFICATION In the effect of Section 115 of the Professional Engineers Act 2002, the professional engineering services in the areas of engineering required for this project have been carried out by or under the supervision of registered professional engineers who are registered under the Act in respect of the areas of engineering. | certify that the design meets the requirements of all relevant Council Policies, References, Standards, Planners and Design Instruction, Code of Practice, Guidelines, and Brief/Functional Specifications. Manual of Uniform Traffic Control Devices CFO OHS NOTE: ALL SIGNS & LINE MARKING TO BE IN ACCORDANCE WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES. LOCALITY PLAN NOT TO SCALE MAP SECTION REPRODUCED WITH PERMISSION OF UBD. COPYRIGHT UNIVERSAL PUBLISHERS PTY LTO 0G 07/08 SERVICE LOCATIONS > ) AL BEFORE YOU DIG ENERGY SERVICE PROVIDERS NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM PROVIDERS PLANS, LOCATIONS ARE TO BE CONFIRMED PRIOR TO START OF CONSTRUCTION PHONE DBYD SERVICE LOCATIONS ON 1109 FOR DETAMS. PLEASE CONTACT THE SCRC'S Personal Protective Equipment HEAD eves EARS HANDS reer SAFETY OFFICER Ph: (07) 5475 7347 Mobile: 0417 781800 PRELIMINARY NOT FOR CONSTRUCTION cp CLIENTS | PEOPLE | PERFORMANCE Pastoway 61 7 5413 8100 F617 S413 6199 E bia tmaagighs.com W www.ghd.com GHO Job No. 41-2382 Designed 8 JOHNSON SIGNED: MANAGER TRANSPORT & ENGINEERING SERVICES It is the responsibility of the Foreman to ARBORIST PRIOR TO ANY Fax:(07) 5475 7303 come be eink ani ates CONSTRUCTION FOR ADVICE ON TREE Internal mail: DNO1 gee ey [eee 0 / ; ; ascertain the exact location p ROOT PROTECTION IN THE VICINITY z RPEQ No.: 6681 (Brian Peebles) DATE: ! / 2010 services prior to construction. RARER RAGC AR OF THE WORKS TO BE CARRIED OUT. Neoow Len nag uleche 1 E Project Number . Pemno| STMT? ~_] TRANSPORT & ENGINEERING SERVICES EENIE CREEK RD - NOOSA HEADS 13106 e (AHD) RL] 24.204 DESIGN SERVICES (NORTH) S un sh ine Co ast GIRRAWEEN SPORTS PRECINCT - EARTHWORKS CONTRACT Al B SURVEYED| SCRC Nambour Office . LOCALITY PLAN AND Drawing Sheet No. A DRAWN, Teckel Base Settee Cone ides Coe Romeo aD AB egional Council C001 Rv DATE REVISIONS REC. APPR. | CHECKED Nambour ph.(07) 84756501 fax (07) $441 5338 DRAWING INDEX
Page 70
ROD @s1n09977
STN9903 cnet
gene \
ae
&
=
=
ea
STN99975
15
Bey
\
N\
N\
\ LEGEND
a STN99976 \
— EXISTING PROPERTY BOUNDARY
—— . —— - ——__ PROPOSED PROPERTY BOUNDARY
——— — ————_ GIRRAWEEN NATURE RESERVE
% — —— — = _—_ COUNCIL SURVEYED TREE LINE
\ — — ——— —__ERISTING CREEK LINE
sw — sw — —— EXISTING STORMWATER LINE
) er He EXISTING ELECTRICITY (UG)
\;,
J SURVEY STATION SETOUT
AR
% i STN | EASTING | NORTHING| R.L. | OESCRIPTION
/ 9903 | $09084.430 | 7078746.059| 15.533 STN
<2 I / 9941 09171365 | 7078613.933 | 13.247 PEG
STN99979 A 1 997% | 509310.072 | 7078804.797| 20.089 NC
a 2
yp / 99975 | 509092.199 | 7078727.261| 13.619 NC
J 5 oi 99977 | $09297.077 | 7078755.927| 24.294 BM PKT
7 8 a 99978 | $09414.185 | 707869%.810 | 26.797 PEG
% y 4 99979 | So9392.5m1 | 7078596.192 | 23.113 PEG
99980 | 509285.933 | 7078529.025| 19.099 PEG
Z Ww
oe
am PRELIMINARY
NOT FOR CONSTRUCTION
GD CUENTS | PEOPLE PERFORMANCE
net.
47 Kasans Businoss Vitago, Sirunys O10 4575 Austroua
PO Box 1549 Buddira GLO £575
7 Tafuaeereyenom —/
ZF” GHD Jove 4122382
ca Orann 8 JOHNSON Designed 8 JOHNSON
PSMNo} STN99977 . — o. 615 30 4m Ona
(AHD)RL| _RL24.294 \ VY. a FG — toms mem) [Cham RAN [a
SURvEYED| ScRC ' | Scata 1-750 @At Aver a 1
= _ oa 1yfospo
DRAWN TRAI OR Projet Number
c CHECKED SGN SES S hi C t EENIE CREEK RD - NOOSA HEADS 121 06
Al g ROIEGT REVIEW Nambour Office uns ine oas GIRRAWEEN SPORTS PRECINCT - EARTHWORKS CON a
A ENG. CERTIFICATION] eek eee eT i 4560 jtRegional Council - “
Ril DATE REVISIONS REC. APPR. RPEQ No} 6681 (Brian Peables) Nambour ph(07)5475.6501 _tax.(07) 5441 5338 EXISTING FEATURES PLAN C002
Page 71
LEGEND
en
ae
we
SITE FRONTAGE BUND
PRELIMINARY
NOT FOR CONSTRUCTION
Gp CLIENTS | PEOPLE | PERFORMANCE
' — Pansy:
Kawang Busanass Vilage, Bitten OLO 4575 Autre
PO Bax 1940 Buccina O10 4375
TOT 7 $413 6100 #617 5413 6199
bin tegatana com W www gh core
GHD Job No. 41-22387
‘Drawn B JOHNSON ODosigned 8 JOHNSON
etre RS en OK
Anproved gore Roe
1
PROPERTY BOUNDARY
‘SEDIMENT FENCE
STORMWATER PIT ANO PIPES
TOP OF BATTER
TOE OF BATTER
EXISTING STORMWATER LINE
EXISTING ELECTRICITY
CONSTRUCTION ACCESS SEDIMENT TRAP
CATCHPIT/FIELO INLET PROTECTION
SITE FRONTAGE BUND
EROSION & SEDIMENT CONTROL
Sedimentation Contrals shall comply with
the requirements of,
Sunshine Coast Regional Council, November
2008. Manuat for Erosion and Sediment Control,
Version 1.2
SILT AND EROSION CONTROL
1. GENERAL
1.) SEOIMENTATION CONTROLS SHALL COMPLY WITH THE REQUIREMENTS OF SUNSHINE COAST REGIONAL COUNCIL,
NOVEMBER 2008. MANUAL FOR EROSION AND SEDIMENT CONTROL, VERSION 1.2. WORKS STANDARDS REFER TO
“CONTRACT STANDARDS FOR EROSION AND SEDIMENT CONTROL ON CONSTRUCTION SITES."
1.2. TAKE ALL REASONABLE AND PRACTICAL MEASURES TO PREVENT OR REDUCE HARM TO THE ENVIRONMENT AS SET
OUT IN THE ENVIRONMENTAL PROTECTION ACT [CURRENT VERSION). THE MANAGEMENT OF EROSION OF THE SITE
AND ITS SURROUNDS AND THE TRANSPORTATION AND DEPOSITION OF SILT IS THE RESPONSIBILITY OF THE
CONSTRUCTOR AND ALL INVOLVED WITH THE PROJECT.
13 NO SITE WORKS TO COMMENCE UNTIL APPROPRIATE EROSION ANO SEDIMENT CONTROL HAS BEEN PROVIDED.
1.4 THE WORKS SHOWN ON THIS PLAN ARE FOR THE TEMPORARY CONTROL OF EROSION DURING THE CONSTRUCTION
AND ESTABLISHMENT OF ACCEPTED GRASS COVER (70%l. THE REVEGETATION AND REHABILITATION WORKS ARE
TO BE UNDERTAKEN AS SOON AS PRACTICALLY POSSIBLE.
THIS MANAGEMENT 10 BE ADDRESSED:
A} OURING CONSTRUCTION
PROVIOE AND MAINTAIN TEMPORARY CONTROLS FOR ALL ACTIVITIES WHICH POTENTIALLY COULD RESULT IN
EROSION OR SEDIMENTATION FOR RAINFALL EVENT.
B) PRIOR TO PRACTICAL COMPLETION
PROVIDE AND MAINTAIN LONGER-TERM MEASURES TO MINIMISE EROSION AND SEDIMENTATION, TO AND FROM,
THE COMPLETED WORKS. THE FINAL NATURE AND EXTENT OF THESE CONTROLS WILL BE AGREED WITH THE
SUPERINTENDENT.
C] SILT AND EROSION CONTROL DEVICES ARE TO BE REMOVED WHEN SATISFACTORY GRASS COVER {70%} HAS
BEEN ACHIEVED.
15 CLEARING OF VEGETATION TO BE KEPT TO A MINIMUM AND LIMITS OF CLEARING AND NO GO ZONES TO BE
CLEARLY MARKED.
1.6 ERECT SILT FENCES IN ACCORDANCE WITH IPWEAQ STD OWGS D-0040 AND 0-0041 TO ENSURE STORMWATER
RUNOFF FROM DISTURBED AREAS iS FILTERED PRIOR TO DISCHARGING DOWNSTREAM OF THE CONSTRUCTION SITE,
1.2 PROVIDE SILT FENCE DOWN GRADIENT OF ALL STOCK PILES, BUT NO CLOSER THAN 2m TO TOE.
1.8 CONSTRUCTION WORK TO BE STAGEO TO MINIMISE EXPOSURE OF DISTURBED AREAS.
1.9 STOCKPILE SITES TO BE LOCATED A MINIMUM OF 50m FROM WATERCOURSES,
4.10 WITHIN SOm OF WATERCOURSES, TRENCH EXCAVATION MATERIAL TO BE PLACED UP GRADIENT OF TRENCH.
4.4 WORKS ON SLOPES GREATER THAN 10% SHALL HAVE SPECIAL MEASURES TAKEN TO MINIMISE EROSION RISKS
(e.g. EROSION CONTROL BLANKETS, MULCH, TURF etc.}
112 ALL SURPLUS WASTE TO BE REMOVED FROM SITE AND DISPOSED OF ACCORDINGLY.
4.13 REGULAR MAINTENANCE OF STRUCTURES IS AN ESSENTIAL PART OF EFFECTIVE EROSION ANO SEOIMENT CONTROL.
THESE STRUCTURES SHOULD BE INSPECTED AT LEAST WEEKLY DURING ORY WEATHER AND AFTER EVERY STORM
EVENT THAT CAUSES RUNOFF.
fk LANDSCAPING TO BE IN ACCORDANCE WITH THE SUNSHINE COAST REGIONAL COUNCIL TREE PLANTING ANO
LANDSCAPE GUIDELINES.
2. DUST SUPPRESSION
2.1. THE CONSTRUCTOR IS TO ENSURE THE SUPPRESSION OF DUST AT ALL TIMES DURING CONSTRUCTION.
ACCEPTABLE METHODS OF DUST SUPPRESSION INCLUDE:
® MINIMISE AREA OF DISTURBANCE
© WATERING
© REVEGETATE DISTURBED AREA
© MULCHING
VEGETATION MANAGEMENT NOTES
1. GENERAL
1.1 NO CLEARING OF THE SITE IS TO COMMENCE UNTIL APPROVAL TO PROCEED HAS BEEN GIVEN BY THE
SUPERINTENDENT.
1.2 ALL TREES TO BE REMOVED SHALL BE TAGGEO AND INSPECTED FOR ANY SIGNS OF WILDLIFE. SHOULD ANY
WILDLIFE BE IDENTIFIED THEN SCRC SHALL ORGANISE THE SAFE REMOVAL AND RELOCATION OF SUCH SPECIES TO
AN APPROPRIATE LOCATION.
1.3 CARE IS TO BE TAKEN TO ENSURE THE OPERATION OF CONSTRUCTION EQUIPMENT DOES NOT DAMAGE TREES
BEYOND THE LIMIT OF CLEARING. IF NECESSARY, TREE GUARDS ARE TO 8E PLACED AROUND THE TREES 10
PROTECT THEM. TUNNEL UNDER TREE ROOTS WHEREVER POSSIBLE DURING TRENCHING OPERATIONS. IN THE
EVENT OF ROOT DAMAGE, MAKE A CLEAN CUT ABOVE THE SEVERED ROOT AND TREAT THE ROOT WITH A
SUITABLE FUNGICIDE.
1.4 ALL SUITABLE VEGETATION MATERIAL SHALL BE PROCESSED THROUGH A MILLING MACHINE TO PRODUCE CHIP
MULCH. UNSUITABLE MATERIAL SUCH AS ROOTS AND STUMPS SHALL BE OISPOSED GFF SITE. NO BURNING OF
CLEARED MATERIAL IS ALLOWEO. CHIP MULCH PRODUCED ON-SITE SHALL BE AGED AND LEACHED IN THE OPEN
FOR AT LEAST ONE MONTH AFTER MILLING. CHIP MULCH SHALL BE FREE FROM WEEDS, STONES, SOIL AND OTHER
CONTAMINATES. THE MAXIMUM SIZE OF CHIP SHALL FIT WITHIN A PRISM MEASURING 150mm x 100mm x 20mm.
a cael Works Standards ref oR
PSI ° 1830 45m se ° ards refer to, ALL VEGETATION IS TO BE DISPOSED OF IN A MANNER APPROVED BY THE SUPERINTENDENT.
MNo | STN99977 t ‘ “Ss —— "Contract Standards for Erosion and
(AHD)RL | RL.24,204 Scala 1-750 @At = Sediment Control on Construction Sites.” 2. REVEGETATION
SURVEYED | SCRC 2.1 REHABILITATION REQURIEO OF ALL OISTURBED AREAS, NOTE THAT AREAS OF EARTHWORKS AND TRENCHING ARE
TO BE DECOMPACTEC 10 A DEPTH OF 250mm BY SCARIFYING.
5 DRAWN TRANSPORT & ENGINEERING SERVICES EENIE CREEK RD - NOOSA HEADS| /nu%
CHECKED :
Al 5 PROJECT REVIEW DESIGN SERVICES (NORTH) Su nshi ne Coast GIRRAWEEN SPORTS PRECINCT - EARTHWORKS CONTRACT 1 2 1 06
mbour Office =
A ENG. CERTIFIC ‘Comer af Bury Stroct & Currie Steet, Nambour. ‘ . ‘1 EROSION AND SEDIMENT Drawing Shoot 'No-
NG. ATION| “Locked Bag 72, Sunshins Coast Mai Centre, Nambour, QLD 4560 Regionat Council
_ {Rv DATE | =" REVISIONS REC. BPPR. RPEQ No.} 6681 (Brian Peebles) Nambow ph(07)5475 8601 fax(07)5441 5338 CONTROL PLAN C003
Page 72
SITE FRONTAGE BUND, REFER
ORG NO. COO9 FOR DETAILS
RETAINING WALL SETOUT, REFER ORG ~~]
NO. C013 AND JOB SPEC, CL.8.2
SENIOR
SOCCER FIELD
ra 1 AN
~ "FUTURE CRITERIUM TRACK TO “A
HAVE UNDERPASS AT ROAD 01
A
ft
SITE FRONTAGE BUND, REFER
ORG NO. C009 FOR DETAILS
JUNIOR
SOCCER FIELD
JUNIOR
SENIOR
SOCCER FIELD
SOCCER FIELO
a
CONTROL LINE TRACK 01
(FUTURE CRITERIUM TRACK},
REFER ORG NO. COI & CO13
4
NV 900
GRADE QUTLET TO FINISHED
SURFACE AT 0.5%
LEGEND
PROPERTY BOUNDARY
PROPOSED PAVED AREA (ENTRANCE & CARPARK)
EARTHWORKS PLATFORM FOR FUTURE WORKS
PROPOSED CONCRETE FOOTPATH
BIORETENTION/INFILTRATION AREA
RETAINING WALL
STORMWATER LINE, PIT ANO NUMBER,
REFER DRG NO. C006
TUBULAR STEEL FENCE (SENIGR FIELDS)
TOP OF BATTER
BOTTOM OF BATTER
FUTURE FOOTPATH
e EXISTING TREE TO BE REMOVED
, EXISTING TREE TO BE RETAINED
%
EXISTING STORMWATER LINE
EXISTING ELECTRICITY
PRELIMINARY
NOT FOR CONSTRUCTION
(GHD) CLIENTS | PEOPLE | PERFORMANCE
NOTE: KERB AND CHANNEL IN ACCORDANCE
WiTH Pwead orG wo. sea R-ooo | Ria
‘aware Bouness Vilage, Baranya OLD 4575 Ausiats
PO Baa 1540 Gucxina OL 4575
TOL SANRA100 F6Y7 5493 0190
Drawn 8 SOHNSON Designed B JOHNSON
0 15 300 45 7
ee = al
=e ate Scale 1:750 @A1 Appeoved Za Go “
Dato wofo
E DRA _
0 oA TRANSPORT & Oe . EENIE CREEK RD - NOOSA HEADS 434 06
Al ¢ Sao oT REVIEW Nembour Offices Sunshine Coast GIRRAWEEN SPORTS PRECINCT - EARTHWORKS CONTRACT wats heat
A ENG. CERTIFICATION _ eee a ae amb 4860 Regional. Council ] ,
Rv} DATE “REVISIONS REC. APPR. RPEQ No.| 6681 (Brian Peebles) Nambour’ ph(Q7} S475 8501 tax.(07) 5441 6339 SITE LAYOUT C004
Page 73
FUTURE CRITERIUM TRACK
FUTURE CRITERIUM TRACK
ATHLETICS TRACK AND SENIOR SOCCER FIELD
FUTURE CRITERIUM TRACK
,_ FUTURE rT
SITE FRONTAGE BUND
& VEGETATION BUFFER
(D SECTION
Ye)
JUNIOR SOCCER FIELDS ,
FUTURE CRITERIUM TRACK
& FOOTPATH
FUTURE CARPARK :
| CARPARK | |
SITE FRONTAGE BUND &
VEGETATION BUFFER
FUTURE CRITERIUM TRACK
ATHLETICS TRACK AND SENIOR SOCCER FIELD 1
i%
(C~ SECTION
Lou)
CLUBHOUSE \
SENIOR SOCCER FIELD rl
FUTURE CRITERIUM TRACK
JUNIOR SOCCER FIELO j |
FUTURE CRITERIUM TRACK
ATHLETICS TRACK AND SENIOR SOCCER FIELD n
N20
| BUILOING PAD
(8 SECTION
S
SPECTATOR BUND _,
pe"
ee N STORMWATER LINE 3
SENIGR SOCCER FIELD
— | = =
sm st
FUTURE CRITERIUM TRACK
\ JUNIOR SOCCER FIELD. 1 |
Bo
DESIGN SURFACE
NATURAL SURFACE:
NOTE: REFER JOB SPEC. CL.3.2.6
FOR STRIPPING DETAILS
(A SECTION
Keo)
ww = =
~ | Tin 50 ee
~~ STORMWATER LINE 4
PRELIMINARY
NOT FOR CONSTRUCTION
qi CUENTS | PEOPLE | PERFORMANCE
T01 7 $4128100 61 7 5413 8100
E ben terat€igtel.com W weew phd com
GHD Jod No, 41-22382
Drawn 8 JOHNSON ‘Designed & JOHNSON
PSMNo| _STN99977 et a” |e poner 4.
{AHD)RL| RL.24.294 Scale 1:500 @A1 Aprovad Zoe [Rov
SURVEYED | SCRC 2am 1yfesfo 4
E DRAWN TRANSPORT & ENGINEERING SERVICES EENIE CREEK RD -NOOSA HEADS| ("=
At ¢ eS aw DESIGN SERVICES (NORTH) Sunshine Coast sirraween sports precinct - eaRTHWORKS CONTRACT 12106
A ENG. CERTIFICATION . tocked Bat? Santina Coast hed Gente Newborn QLD 4580 4 4{Regional-Council 1 TAAL
-[e] DATE ~ REVISIONS REG. PPR. RPEQ No,| 6681 (Brian Pestle) Nambout | ph(07)S475 6501 tax (07) 5441 5338 TYPICAL SITE SECTIONS C005
Page 74
BATTER 10
Lg
eR FELD
SENIOR FIELD BUFFER
KERB AND CHANNEL
= 170
1 SIZE/CLASS OF PIPE DOWNSTREAM OF PIT
2 RAISE INVERT IF NECESSARY TQ ENSURE MIN PIPE
GRADE TO EXISTING PIT
a SLB1 REINFORCING MESH TO BE CENTRALLY PLACED
iN WALLS OF PIT, REFER OTMR STD ORG 1312
4 POSTS, RAWLS AND FITTINGS SHALL BE HOT DIP
44b
CRITERIUM TRACK
5.8 ' S.6 : 5.4 sg__ CARPARK 54 \ 5.4 5.8 , 54 5.1 ___ SENIOR
CIRCULATING LANE PARKING BAY PARKING BAY CIRCULATING LANE PARKING BAY PARKING BAY CIRCULATING LANE PARKING BAY WALKWAY + SOCCER FIELD
_ | 6% 2% ah% —
- cx
sa 2 COAT SEAL TUBULAR STEEL FENCE TYPE 1-As,
100mm BASE REFER IPWEAQ DRG NO. G-046
CARPARK GRADES (WITH FUTURE LAYOUT) 150mm SUBBASE
{4 SECTION
cow J Scate 1: 100
TUBULAR STEEL FENCE TYPE 1-A4,
TUBULAR STEEL FENCE TYPE 1 STORMWATER LINE 1 SETOUT TABLE
SENIOR SOCCER FIELO 5.0 30 JUNIOR SOCCER FIELD Pit | EASTING | NORTHING |sizE/cLASS1] GRADE | SURFACE LEVEL | INVERT LeveL | TYPE
ZeNOR FIELD BUFFER og UNO FIELD BUFFER 11 [509260.810]7078769.968| 375 RCP (Z| 1% 19.700 18.7002 ANTI PONDING PIT, REFER PWEAQ ORG SEQ D-068
| 2/1 |509274.152|7078767.904 : . 19.660 EXIST 600X600 TYPE 2 FIELO INLET, REFER IPWEAG DRG SEQ 0-050
1 Ie me —— 1
STORMWATER LINE 2 SETOUT TABLE
ns eve prt FINISHED SURFACE AT SWALE RIDGE pit | EASTING | NORTHING |SIZE/CLASSs| GRADE | SURFACE LEVEL } INVERT LEVEL | TYPE
VC PIP
$00x600 TYPE 1 FIELD INLET 172 |509301.831|7078706.337} 375 RCP [21] 1% 19.622 18.655 900x900 TYPE 2 FIELD INLET, REFER IPWEAQ ORG SEQ 0-050
(GY SECTION 272 |509293.683|7078733.802| 375 RCP (2 | 2% 19.620 16.893 | 900x900 TYPE 2 FIELD INLET, REFER IPWEAO ORG SEQ 0-050
\uoae J Sea #50 3/2 |509262.417| 7076731.017 : - - 16.265 PRECAST HEAOWALL AND APRON
STORMWATER LINE 3 SETOUT TABLE
PIT EASTING | NORTHING | SIZE/CLASS:{ GRADE | SURFACE LEVEL | INVERT LEVEL | TYPE
1 v3 [509284.747]7078636.683| 375 RCP 21] 1% 19.580 18.700 SAG KERB INLET, KERB IN LINE TYPE °S', REFER PWEAO SEQ 0-060
ho 5.0 10 5.0 __ SENIOR FIELD
SENIOR FievD BUFFER 273 [509270.985|7078658.253| 450 RCP 12)| 0.5% 19.580 16.864 SAG KERB INLET, KERB IN LINE TYPE ‘S', REFER IPWEAQ SEQ 0-0603
373 |509246.207| 7076689.21| 450 ACP 12)| 0.5% 17.500 16.600 600x600 TYPE 1 FIELD INLET, REFER IPWEAQ ORG SEQ 0-050
4/3. |509264.306|7078708.662 : 5 - 16.502 PRECAST HEADWALL AND APRON
_—o ya tae —
=} —— 70
SPECTATOR BUND is STORMWATER LINE & SETOUT TABLE
FINISHED SURFACE AT CLUBHOUSE KERB pit | EASTING | NORTHING |SiZE/CLASS1| GRADE | SURFACE LEVEL | INVERT LEVEL | TYPE
AND CHANNEL. PROVIDE OVERFLOW ve it m v u 20.287 19.837 600X600 TYPE 1 FIELO INLET, REFER IPWEAQ ORG SEQ 0-050
(F-\ SECTION SWALE AT 0.5% FROM CLUBHOUSE 509347,093] 7076677.171| | 225 PVE | 0.t% - 9.83 .
(cnc J Scale 150 274 |509362.177|7078653.462| 225 Pvc | 0.4% 20.287 19.696 600X600 TYPE 1 FIELD INLET. REFER IPWEAQ ORG SEQ 0-050
374 [509376.871|7076630.929] 225 pve | 0.6% 20.287 19.557 600X600 TYPE 1 FIELD INLET, REFER IPWEAQ ORG SEQ 0-050
474 |509391.448|7078600.657| 225 PVC | 0.6% 20.287 19.407 600X600 TYPE 1 FIELO INLET, REFER PWEAQ ORG SEQ 0-050
574 |509385,475|7076S88.436| : : - 19.322 PRECAST HEADWALL AND APRON
STORMWATER LINE S SETOUT TABLE
pit | EASTING | NORTHING |siZe/CLASS:1] GRADE | SURFACE LeveL | INVERT LEVEL | TYPE
FUTURE CLUBHOUSE TUBULAR STEEL FENCE TYPE 1-As, REFER IPWEAQ DRG NO. 5 |509287.376[7078743.737] 450 RCP [21] &.85% - 17.276 PRECAST HEAOWALL AND APRON
G-044, PROVIDE OPENINGS WHERE DIRECTED FOR ACCESS 278 }509263.108| 7078761.213 : - - 16.093 PRECAST HEADWALL AND APRON
FUTURE VIEWING AREA .
45 5.0 1 SENIOR FIELO
PRELIMINARY
NOT FOR CONSTRUCTION
Gp CUENTS | PEOPLE [PERFORMANCE
TYPE 81 LEN SECTION GALVANISED , sunwas
(cone 7 SCALE 1:50 3 ' oan tos eee ope noon
eer | Eater cae ee arco
Scale 1:50 @A1 ‘
SETOUT POINT SETOUT POINT 0 2 4 6m Orewn 8 JOHKSON
PSM No STN99577 A . Dreting RATAA
(AHO)RL | RL.24,294 DRAINAGE PIT SETOUT DETAIL Scale 1-100 @A1 sen Ezz
SURVEYED | SCRC NOT TO SCALE a vf %
E
a TRANSPORT # ENGINEERING SERVICES EENIE CREEK RD - NOOSA HEADS
Al c ( ) Sunshine Coast sisraween srorts precinct - EARTHWORKS CONTRACT
8 PROJECT REVIEW Nambour Office
A ENG. CERTIFICATION Locked Come’ ct Bury Strost & Currie Street, Nambour. 560 Regional Council TYPICAL SECTIONS AND
Ry DATE REVISIONS REC. APPR. | RPEQNo.| 8681 (Bran Pesbies) SNamtoUr ph{OT) SATS SSO1 fax(O7) S441 5350. STORMWATER SETOUT TABLE —_-
Page 75
CUT TEMPORARY SWALE
TO BIORETENTION POND
a we
BOULDER WALL, REFER
BIORETENTION POND OETAIL
BIORETENTION POND
“
1iN 6 TURFEO RAMP ACCESS
TO BIORETENTION POND
wore TENTION WEIR,
REFER DETAIL
OUMPED ROCK (0200 ROCK
MIN 300mm THICK) ON
GEOTEXTHE BIDIM A29 OR
BOULDER WALL
INFILTRATION SWALE
11N 6 TURFED RAMP ACCESS
TO BIQRETENTION POND
INFILTRATION SWALE
BIORETENTION POND
A34 FROM OUTLET TO
REFER ORG NO. C010 FOR
SWALE AND POND SETOUT
BIORETENTION POND AND
GROUTED ROCK WEIR |
BIORETENTION WEIR PLAN
SCALE 150
INFILTRATION SWALE
BIORETENTION POND DETAIL
LEGEND
INFILTRATION SWALE PLAN GROUTEO ROCK WEIR 300mm DEEP, REFER SECTION L
PROPERTY SOUNDARY SCALE 1200
pho 2.0 ,
—sw— —@sw— — — STORMWATER LINE AND PIT «
° RL_15,350
—-_1__1____ 0p of Batter RL_15.250 4
— —— — — _TO€ oF BATTER sat B RL 15.050 GROUTED ROCK WEIR, 200mm ROCK £
v Sanaa [ox |
BIORE TENTION POND BASE
BIORETENTION WEIR
BIORETENTION WEIR
SECTION SECTION
NOT TO SCALE
NOT TO SCALE
whee
WIDTH VARIES sie
TURFEO BIORETENTION POND Plz
: 1.4 MIN 2.0 14 Mil , wlz
Ss
ois
SETOUT POINT, 3.0 TURF. le
7 REFER DRG NO. CO1D
BOULDER WALL, MIN 300mm HIGH —| tw. 0.5 05
GAIT IVF FT 7S ; BOULDER WALL, az ue
[ 0.45 MIN 300mm HIGH x “
0.6m SANDY LOAM FILTER MEDIA. = — t 10mm THICK CONCRETE wa
dOmm/KR 0.5
HYDRAULIC CONDUCTIVITY 200mm. | STRIP FOOTING SETOUT POWT
\ INFILTRATION SWALE DETAIL
GEOTEXTILE BIDIM A29 OR AI4
SECTION
&
VIN 6 TURFED RAMP ACCESS
TO BIORE TENTION POND
TWN 6
0 1 2 3m
be
Scale 1:50 @A1
0 4 8 12m
ene
Scale 1:200 @A1
9 0.8 1 1.5m
el
Scala 1:25 @A1
PRELIMINARY
NOT FOR CONSTRUCTION
=
a) CLIENTS ] PEOPLE | PERFORMANCE
a TONGRON Parkway
Kewana Business Village, Setinyy GLO 4S7S Ausuade
PO Oox 1540 thusaina QLD 4575
TBST S413 8100 F847 $413 A199
E DiImadond.com W www. phd.com
GHD Job No. 41-22382
Orawn B JOHNSON Qasignsd B JOHNSON
PSMNo | _STN99977 SECTION Bates pa AN [Be
{AHD)RL| RL.24.294 SCALE 1:25 SCALE 1: 25 nopeowad
SURVEYED | SCRC Dato At feshe . 1
E DRAWN TRANSPORT & ENGINEERING SERVICES . EENIE CREEK RD - NOOSA HEADS 3408
Al c DESIGN SERVICES (NORTH) Sunshine Coast GIRRAWEEN SPORTS PRECINCT - EARTHWORKS CONTRACT 1 2 06
B PROJECT REVIEW Nambour Office 5
8 Se seams er Oe ttc Nab Regional Council BIORETENTION POND AND Tang Soa
rt oar RERSIONE RES HP RPE No 665T Toran Pai Namnu ERU Sate eee INFILTRATION SWALE SETOUT PLAN._|COO7 __
Page 76
LEGEND
On. 4, yy
MODIFY EXISTING GULLY PIT AND
REPLACE EXISTING TYPE B1 KERB = REPLACE WITH TYPE 2 FIELD INLET «“/ \
WITH CONCRETE INVERT, REFER
IPWEAQ ORG SEQ R-080 Y
= JOIN NEATLY TO EXISTING
REMOVE EXISTING » KERB AND CHANNEL
FOQTPATH AS REQUIRED
= gee JOIN NEATLY TO
F —sv— av —
PROPERTY BOUNDARY
PAVEMENT WITH 2 COAT SEAL
PROPOSED CONCRETE FOOTPATH
TOP OF BATTER
PAVEMENT WITH 40mm DG14 SURFACING
STORMWATER LINEAND PIT, REFER ORG NO. C06
KERB RAMP, CENTRE AT CH 24.22, REFER IPWEAQ DRG SEQ R-090
EXISTING FOOTPATH , ‘
me ANTI PONDING PIT, REFER IPWEAQ. = —- ——- ~~ —— _ TOE OF BATTER
See ORG SEQ 0-068 FOR DETAILS
lie . Him Bem EXISTING STORMWATER LINE
we Pe ee e.
KERB ANO CHANNEL TYPE = 20.9 509297.473 4h
B1 TO KERB RAMP N 7078758.797
mE tm EXISTING ELECTRICITY
£509255.871 “<Y : .
N.7078752.793
2.5m WIDE CONCRETE FOOTPATH,
REFER (PWEAQ DRG SEQ R-065
ENTRY DETAIL
Bry
CONTROL LINE ROAD 01 SETOUT TABLE
Northing fea’ te
Pt hoinagd Easting Level | Searing A.Length
EXIST
20.386 [174°03°62F
PY 0.000
(P2 | 56.289
509271.695 17078779.479
509277.519 |7078723.492|
ENTRY SETQUT POINT AND DESIGN LEVEL SPACED EQUALLY ALONG KERB RETURN
CONTROL LINE
ROAD 01
te
SCALE 1:200
ve
lng
!
o g NATURAL SURFACE DATUM RL. 14.00
5 — ~~ pe . ae . -- meee ee woe
<
@
So @ ae
2 5: CH 40
we 5 8
%
woe gs /“ 8 &
S 2 ¢ x
w | FH . EXISTING SURFACE
Zz @ 8
Bw oc * - 28 3.5 LANE [3.5 LANE 2.0 2)
ats t .
ji .3 2 CoAT seat, - . _
. 1° DESIGN SURFACE | * I *
\ DESIGN SURFACE
|
: 100mm BASE
' 150mm SUBBASE
DATUM RL. 17.00 1 '
u
VERTICAL ALIGNMENT 4 DATUM RL. 15.00 - l see —_ a - . _ err =
CK 30
HORIZONTAL ALIGNMENT
LEVEL DIFFERENCE
BE . aa & a TURF TO BATTER
CUT -/FILL + a3 e 24 ta PRELIMINARY
DESIGN SURFACE LEVEL 4 8B of #& a 5 "7+. _ ue 10 BATTER 0.5 TURF | foe EXISTING SURFACE NOT FOR CONSTRUCTION
or 2 #2 a RR # pL. 25 xh. BSe oj 3Se 28 WL an —.. |
EXISTING SURFACE LEVEL ag 4 88 eg za bt a am Tt ep CUENTS | PEOPLE | PERFORMANCE
KERB AND CHANNEL wee DESIGN SURFACE a.
CHAINAGE is g 88 8 88 g 8 BI, REFER IPWEAQ ORG 2.5m WIDE CONCRETE FOOTPATH, ‘avons anes Vinge any OL0 4375 Aaron
S = = BS DATUM R.L. 17.0 NO. SEQ R-08¢ tOmm OG REFER IPWEAG ORG SEQ R-06S Terrors eiee Fair sat) B00
0 4 i ae a a rn —— E beatmenighs.com Wi wew.ghedl com
LONGITUDINAL SECTION - ROAD 01 2 m + WIDTH OF ENTRANCE VARIES, CH 20 ‘00mm BASE GHO Job No, 41-2238
HORZ 1:50, ‘VERT 150 Scale 1:100 @A1 REFER DETAIL ABOVE Orewn & JOHNSON Designed 6 JOHNSON
PSMNo| s7N99977 0 1 2 3m Vert. 1:50@A1 0 4 8 1am ROAD 01 CROSS SECTIONS Gee PASS [ou Ze.
(AHD)RL | RL.24.204 ete SCALE 1:100 ‘Approves Rev
SURVEYED | _SCRC 6 10 20 30m = Horz. 1:500 @At Scale 1:200 @A1 on ry¥fasfio 1
E DRAWN TRANSPORT & ENGINEERING SERVICES EENIE CREEK RD - NOOSA HEADS] (227:
® CHECKED DESIGN SERVICES (NORTH) Su nshine Coa st GIRRAWEEN SPORTS PRECINCT - EARTHWORKS CONTRACT 1 21 06
B PROJECT REVIEW Nambour Office ° . ROAD 01 SECTIONS Drawing Shoot No,
A ENG. CERTIFICATION u Pane of Bury Street & Currie Siresi, Nambour. Regional Council
. 4 —t ocked Bag 72, Sunshine Coast Mall Contre, Nambour, QLD 4560 C008
Ryj DATE REVISIONS REG. APPR: RPEQ Not 6681 (Brian Pecties) Nambour ph(O7)$47598501 tax(07) Seat 6338 -AND SETOUT PLAN... JC
Page 77
CONTROL LINE TRACK 01
(FUTURE CRITERIUM TRACK),
7 REFER DRG NO. COI2 & (O13
REFER BIORETENTION POND &
WEIR DETAILS, ORG NO, C007
FUTURE
FOOTPATH (2.5m!
FUTURE
CRITERIUM TRACK
SCALE 1:250 SO SETOUT POINT
PROPERTY BOUNDARY \ (0\ SECTION
° SETOUT POINT EXISTING ELECTRICITY Le) SCALE 1:100
@ coy
— ss — — sv — — — STORMWATER LINE AND PIT
STOO FUTURE CARPARK SETOUT EXISTING SURFACE
TOP OF BATTER
EENIE CREEK RO
. " " EXISTING.
BUND SETOUT TA
PRELIMINARY — — — _‘TOE OF BATTER BLE rowan fi
- = TURE
T FOR CONSTRUCTION Pt Easting { Northing | Level SETOUT POINT v
NOT FO Hie m= 8 — EXISTING STORMWATER LINE FOOTPATH [2.5m)
a, 400 { 09131310 | 7078730.793 | 13.390 \ FUTURE
curl OPLE MAN == = Future rootpati TRITERIUM TRACK
NTS | PE PERFOI ICE
Gy I | 401 | $09167.983 | 7078763.907| 14.859 EXISTING ELECTRICITY
at. hoe mE mm EERISTING ELECTRICITY 402 | $09207.229 |7076744.430] 17.310
Rawaratnarnt Vg, Sy OLD STS Aas
Tet reetaetno rat7senaéersa 603 | $09208.017 | 7078762.125 | 18.238
G tu imasgigns. x
GHD soune avesag 404 | 509233.396 | 7078766.308] 19.663
Drawn B JOHNSON Gasignod 8 JOHNSON 405 | 509258.960 | 7078761.334 } 19.661
EENIE CREEK RO
FUTURE
CRITERIUM TRACK
eee yes [Bee ae 406 | 509297.271 |7078760.449| 20.329
:
EXISTING
FOOTPATH
Approved aoe Row 0 2 4 6m we S|
1 407 §09310.167
bate ct sife ro7a7e9.710 | 21.701 ms
Scale 1:100 @At goa | 509326.7a9 | 707795.231 | 22.876
PSMNo | STN99977 0 5 10 18m SECTION
(AHD)RL| _RL.24.294 toms. EXISTING ELECTRICITY =
ae) Scale 1:250 @A1 SCALE 1100
SURVEYED | SCRC
E DRAWN TRANSPORT & ENGINEERING SERVICES . EENIE CREEK RD - NOOSA HEADS} (37.
Al e PRO WEeT REVEW eee nambour fen ORTH) [Sunshine Coast GIRRAWEEN SPORTS PRECINCT - EARTHWORKS CONTRACT 1 2 106
ENG. CERTIFICATION Comer of Bury Strest Nambour. Regional Counci
aL Bare REVSONE 7c APPR. EQ Nol EET Pomny —]_‘OMSGEERT? San Cnn es Nano. SITE FRONTAGE BUND SETOUT C009
Page 78
8 VS a EARTHWORKS SETOUT TABLE
se FRONTAGE BUND, 7 Pt | €asting | Northing | Level COMMENT
“ 200 | so9te9.245 | ro7e706.626 | 14.733 KENTRE OF SWALE
205 | so9z00,69% | 7078715.651 | 14.050 LENTRE OF SWALE
202 | So9zto.ase | 7078775.164 | 14.950 CENTRE OF SWALE
ce lege . 203 | 509220.651 | 7076717.069 | 15.050 CENTRE OF SWALE
S ee a a SET msc 20% | S09230.028 | 7078720.5¢1| 15.150 KENTRE OF SWALE
yee = aa + ow neater ro existe reotparn / 205 | so9239.390 | 7078720.055| 15.250 Top OF WER
” TE FRONTAGE BUND, 206 | 509237.801 | 7078726.396 | 15.050 BIORETENTION SETOUT
__ REFER DRG NO, (009 207 | s09208.476 | 7078731.316 | 15.050 BIORETENTION SETOUT
208 | 509257.556 | 7078732.761 | 15.050 BIORETENTION SETOUT
(OO TR Oe NE RACK 209 | so92se.2n6 | 7078730.369 | 15.050 BIORETENTION SETOUT
REFER ORG NO, C012 & C013 210 | 509258.990 | 7078727.768 | 15.050 BIORETENTION SETOUT
2m | 509253.063 | 7076725.106 | 15.050 BIORETENTION SETOUT
2iz__| $09263.542 | 7078717.965 | 15.050 BIORETENTION SEToUT
213 | So9240.940 | 7078721.773 | 15.050 BIORETENTION SETOUT
2m | 509215.944 | 7078705.577 | 15.867 [TOE OF BATTER
218 | so9z1s.e17 | 7078704.685| 16.195 [roP oF BATTER
TER OrAES one we coe 216 | 509225.963 | 7078705.687 | 15.946 TOE OF BATTER
217 | $09225.480 | 2078702.127 | 16.995 [top OF BATTER
218 | s09235.5% | 7078707.690| 16.033 [foe OF BATTER
219 | 509235.380 | 7078701.883 | 17.443 [oP OF BATTER
220 | 509263.780 | 7078711559 | 15.093 [TOE OF BATTER
(we) 2a | 509244.367 | 7078706.192 | 17.726 [TOP OF BATTER
222 | $09250.331 | 7078718,600 | 16.121 OE OF BATTER
223. | 509252.807 | 707871,554 | 18.439 TOP OF BATTER
22, | 509258.104 | 707a724.867| 16.297 TOE OF BATTER
225 | $09261.294 | 7078716.843| 19.037 TOP OF BATTER
226 | 509268.877 | 7076723.097 | 19.703 oP OF BATTER
227 | 509270.528 | 7078732.735| 19.846 TOP OF BATTER
228 | 509261990 | 7078733.931| 16.502 [TOE OF BATTER
229 | sogz6x.eas | 7078736.516 | 16.086 [TOE OF BATTER
aN 230 | $09270.191 | 7078737.182 | 20.175 [top OF BATTER
PREVENT WATER PROM CROSGING PENCE (20) a | so92e6.e12 | 7078677.127 | 20.71
PRELIMINARY \\ CARPARK SETOUT TABLE nz | 509277.283 | 7078691.924 | 20.585
NOT FOR CONSTRUCTION \ pr | tasting | Northing | tevet || 113 | $09276.093 | 7078722.592} 20.553
| * woo | 509279.930 | 7078734.137 | 20.559 || 1% | So9z9s.299 | 707a722.398| 20.158
cD GUIENTS | PEOPLE | PERFORMANCE 101 | 509267.61 | 7078730.451| 19.761 15 | $09299.995 | 7078725.105 | 20.077
une @ @) 4 SENIOR SOCCER 102 | s09293.5e4 | 7078734.272| 19.620 ]| 116 | Sooave.as1 | 707a734.697| 20.431
ree aplon arr oan sip LEGEND \\ ‘ FIELD 103 | $09309.668 | 7078744.655} 19.991 7 509321861 | 7078719.441) 20.164
Gu ose acnsee % a roe | 509396579 | 7078743.15a| 20.303 |] 18 | Sogao1.764 | 7078706.500| 19.622
Brawn 8 JOHNSON Oosigned 8 JOHNSON EXISTING PROPERTY BOUNDARY 105 | 509319.936 | 7078737.946] 20.551 9 | 509294.571 | 7078701884 | 19.791
pre usw leet * Gm) SETOUT POINT TT TE OF BATTER 106 | S09331.018 | 707a720.736| 20.703 || 120 | Sov267.sea | 7o7a6a8.665 | 18.760
a © deche a Ta TERS — STORMWATER LINE AND PIT, an aR — EXISTING STORMWATER LINE 107 | $09330.066 | zo7e70.860 | zo.730 || 121 | sov2ss.s97 | 7078677.587| 18.066
, — —— TS = roture rootpati 108 | 509326.262 | 7078708.95| 20.705 |{ 122 | 509232.133 | 7078601.815 | 17.577
eaune Srweeer? —-—————-— FUTURE CARPARK SETOUT ir —— —_peisting FOOTPATH et 5015" [ios | s09329.186 | 7078704.41%| 20.678 || 123 | sog2u2.im | 7078703.229| 17.765
SURVEYED| SCRC TOP OF BATTER Scale 1:250@A1 110 | 509390.751 | 7078692.563| 20.286 |] 124 | 509264.569 | 7078717.324 | 19,387
5 ce TRANSPORT & ENGINEERING SERVICES EENIE CREEK RD - NOOSA HEADS| 37
Al £ PROJECT REVIEW Nambour ES ) Sunshine Coast GIRRAWEEN SPORTS PRECINCT - EARTHWORKS CONTRACT 12106
Comer of Bury Sueet & Currie Street, Nambour. i ne 0
none REVISIONS, Rec hor] Reco no 6881 {Brian Posbies) ee NerEeur GROOM EATS ESO cE BHO Regional Counc CARPARK SETOUT PLAN . C010.
Page 79
SPORTS FIELDS EARTHWORKS SETOUT TABLE
> Pt Easting Northing Level LOMMENT
300 | 509146365 | 7o78616,601 | 15.554 FIELD SETOUT
301 | $09192.391 | 7078545.207 | 15.465 FIELD SETOUT
JUNIOR 302} $09158.643 | 7078624,581| 15.700 FIELO SETOUT
SOCCER FIELD 303 | 509206.667 | 7078553.111 | 15.590 FIELO SETOUT
30% | 509161.662 | 7078687.316 | 16.057 FIELO SETOUT
305 | 509169.563 | 7078675.039 | 16.203 FIELO SETOUT
306 | $09189.331 | 7078644.350] 16.188 FIELD ARC CENTRE
307 | 509212.344 | 7078608.613 | 16.168 FIELD SETOUT
308 | 509235.357 | 7078572.876 | 16.107 FIELD ARC CENTRE
309 | 509255.121 | 7078542.18¢ | 16.092 FteLD SETOUT
310 | So9263.026 | 7079529.910 | 15.946 FIELD SETOUT
JUNIOR 311 | $09220.021 | 7078664.114 | 16.681 FIELO SETOUT
SOCCER FIELD 312 | $09266.045 | 70785S92.640| 16.596 FIELO SETQUT
313 | S09286.040 | 7078566.330 | 16.296 FIELD SETOUT
31% | $09296.160 | 7070572.846 | 16.252 EARTHWORKS SETOUT
315 | 509278.311 | 7078600.563 | 16.519 EARTHWORKS SETOUT
aie | 509z61,782 | 7078657.288 | 16.598 EARTHWORKS SETOUT
317 | 509221908 | 7078686.089 | 16.531 EARTHWORKS SETOUT
SENIOR 318 | 509293.626 | 7078610.030 | 20.900 EARTHWORKS SETOUT
SOCCER FIELD 319 | 509294465 | 7078610.572 | 20.900 EARTHWORKS SETOUT
mao 320 | s093z3.401 | 7076563.789 | 20.400 EARTHWORKS SETOUT
321 | $09326.262 | 7078564.330| 20.400 EARTHWORKS SETOUT
322 | $09329.287 | 7078567.579 | 19.650 FIELD SETOUT
323 | 509299.509 | 7078613.820 | 19.650 CLUBHOUSE KERB INVERT
324 509292.066 | 7078625.378 | 19.720 CLUBHOUSE KERB INVERT
325 | S09zae.620 | 7078636.941] 19.580 ELUBHOUSE KERB INVERT
326 | 509277.176 | 7070648.504 1 19.720 LLUBHOUSE KERB INVERT
327 | 509269.731 | 7078660.062 | 19.560 KLUBHOUSE KERB INVERT
328 | 509387.299 | 7078604.936 | 20.637 FILED SETOUT
329 | $09357.521 | 7078651178 | 20.636 FLED SETOUT
REFER SECTION F DRG NO. C006 330 | $09327.744 | 7078697.419 | 20.636 FILED SETOUT
FOR OVERFLOW SWALE DETAIL 331 | 509331947 | 7078700.126 | 20.537 FILED SETOUT
setout PONT 332 | 509947.257 | 7078677.276 | 2.287 FELD INLET SL
\ 333. | 509350.795 | 7078665.570 | 20.537 BWALE RIDGE
PRELIMINARY , NT 334 { $09362.527 | 7078653.563 | 20.287 FIELD INLET SL
NOT FOR CONSTRUCTION KERB SETOUT POINT 335 | S09371.101 |7078640.249| 20.537 BWALE RIDGE
Gp CLIENTS | PEOPLE | PERFORMANCE LEGEND 336 | 509377.036 | 7078631.035 | 20.287 FELO INLET SL
a REVISED PRUPERTY BOUNDARY 337 | $09384.237 | 7078620.030 | 20.537 BWALE RIDGE
San acter omen a €)) SETOUT POINT 33a | 509391437 | 7078609.026 | 20.287 FIELD INLET SL
r a 339 | 509391,503 | 7076607.643 | 20.537 FIELO SETOUT
G6 foe ae sera wa 340 | 509396.086 | 7078602962 | 20.537 FIELD SETOUT
me pea = a: ee ——_EARTRMORKS HINGE UNE 341 | 509365.601 | 7078653.407| 20.537 FIELD SETOUT
ee I> Fi TH En — — STORMWATER UNE, PIT 342 | $09362.896 | 7078657.611 | 20.537 FIELD SETOUT
Dato tylesho 1 oT ToT TOP OF BATTER 343° | 509330.409 | 7078706.056 | 20.537 FIELO SETOUT
Sanne Sinooar 10 20° 30m — —— ~~ __ © zottom of Barrer 344 | 509366.039 | 2078729.713 | 21.337 FIELO SETOUT
(AHD)RL| RL24.394 Scale 1:500 @At Tuan STEEL FENCE [SENIOR FIELOD a45 | 509396.52 | 707a679.268| 21.337 FIELD SETOUT
SURVEYED | SCRC 346 | $09399.231 | 7078675.064 | 21.337 FIELD SETOUT
é DRAWN ;
© CRESRED cee eR od Sey NOR RUCES ; EENIE CREEK RD - NOOSA HEADS] 45756
A 1 ¢ SROIECT REVIEW Nambour Offies Sunshine Coast GIRRAWEEN SPORTS PRECINCT - EARTHWORKS CONTRACT a
A ENG. CERTIFICATION Comer af Bury Street & Currie Sueet, Nambour, i i -
t Rf DATE [REVISIONS FREC._ APPR: RPEQ No} 6681 (Bian Peabies) ‘oNamteu PRION OATS GOT" tan(OT) 8061 0 Regional Counel SPORTS FIELD SETOUT PLAN C011
Page 80
CONTROL LINE TRACK 01 SETOUT €T | 263.893] $09166.422[7078719.784] 14.900 |253°1612” 550.000 509249800] 7078501432) 12.640 | 81°09°37"
Pt {Chcinage Easting | Northing | Level | Bearing Rad/s SPI") ALength 250.000] 509160,575 |7078718.022| 14.812 |253°14°12" TC [67.946 }509267.533|7078504.190} 13.008 | 81°09'37"
wr | 0.000 /509379.550|7078737.089| 26.625 TC | 258.058) $09152.859| 7076715.698} 14.684 |253°14°12" (P12 | 569.881 |509290.714 |7078507.795 50.000 | -43.869
Tc | 25,000 {509365.% 76] 7078757.751] 24.205 B25°44°26" (PT | 278.500] $09130.70717078709.026| 35.000 | -40.886 600.0001509295.555| 7078518.595} 14.251 |24°25°66"
. 50.000 }609345.496) 7076771.885| 22.641 P64°49'S4" CT = | 296.942} $09128.165 | 7078685.031! 13.979 |186°18'30" 611.816 |509302.757|7078527.927! 14.861 | 30°S3°24~
IP2 | $6.527 [S09340,608)7078796.262 35.000 | -63.058 300.000 | 509128.069/7078684.980} 13.96% |186°18'30" 1P13, [620.992 |509307.579|7078535.987 35.000 18.353
ct | @.054 |S09310.752|7078761.703] 19.519 | 222°3111" TE | 317.179 | $09126.162 |7078667.995| 13.677 |186°18°30" CT | 630.168 1509315789 |7078540.550} 15.810 | 60°S6'01"
Tc 98.900 |$09303.422|7078753,709| 18.629 | 222°31 1" IPB | 337.023} 509123.968|7078648.066) 150.000 | -39.687 650.000 ]599333,123/7078550.185| 16.836 | 60°S6°0I"
100,000 |509302.666]7076752.910| 18.539 |224719°13 350.000| 509126.139 | 7078635.150} 13.249 |173°46718" 700.000 [509376.826|7078574.476| 19.423 | 60°S6°01"
3 | 111.588 |50929¢.450]7078743.925| 35.000] 25.377 CT |356.866} 509927.039/7078628.343] 13.179 |171"08°57" 59.000 09420,529 [078598,767 pL861 0°S6'01"
CT | 126.277|509261.246]7076742.551] 16.883 [264°03°42" Te | 383.074] 509139,072 /7078802.448] 12.97% |171°08°S7" irc fss.198 09425.072 078601292 b2.075 porsa‘or"
TC {149.859 |50925S.801|7076739.905} 15.809 p64703°%2" 400.000} 509136.31|7078586.477} 12.89% ]151765°12" Pi 164,542 509433.439 7078605.943 B5.000 | 18.687
150.000 |509255.661|7078739.890| 15.805 [263°56'00" IPg | 400.615 | 509933.887 17078584, 368] 50.000 | -35.082 CT 73.886 f09436.275 ro76614.204 2.778 f0°20°31"
we | 164.131 |509241.207 |7078738.367 50.000 | -2a,546 CT | 418.156 [509147.708}7078572.3761 12.838 |130°56'S3" irc P74.609 09436.640 ra7ests.e28 2.803 B0°20°31"
ct {179.403 |509229,748|7078729.223) 15.414 |23121"09" 450.000] 509171.760 |7078551.506| 12.743 |130°S6'53" PIS 294.340 509449.817 77078633.924 BS.000 | 39.463
TE 178,008 |$09229.744|7078729.220| 15.414 [231°21'09" TC |456.268]509176.696 }7078547.398| 12.724 |130°S6'53" B00.000 509442.765 7078639.321 23.577 BU8"GE'34"
IPS | 193.197 |509297.528|17078719,252 36.990 | 29.018 {P10 |477.529] $09192.66t|7078533.370 150.000 | 42.522 ET B14.072 509437.361 P078652.211 23.919 B25°44'26"]
2 200.000 |509209.900| 7078721615 | 15.330 266°42°34" 498.790 [509204 .259'7076515.380] 12.596 |167°124" B50.000 609417.136 PO766B1.906 24.516 B25°44'267)
g CT | 207,826 ]509202.102 |2078722.040] 15.280 |279°31'27"| $00.0001509204.932|7078514.375} 12.593 |145°12°31" fro0.000 fo9386.989 [1078723.231 24.709 B25°44'26]
. 8 TC | 207.831 |509202,098|7076722.040] 15.280 |279°31'27") in | 518.957 | 509216.582 |7078496.265 35.000 | -40.335 P¥6 916.767 509379.550 078737.089 24.625
mx We | 225,862 |509183.997 |7078725.077 78.600 | -36.062 CT | 539.425 ]509239.05¢]7078499. 761) 12.531 | 81°09'°37"
hg ~
' tI ’ \
| .
i i | -
|
+ i
1 | 4
: ; 2
f 5 3
! ' 5 z
: “ ‘ ! . 5
. : é 2 5
il ! ; = DESIGN SURFACE z 2
4 ‘ x 3 gz
i { i a &
: 5 g
: I i : = 5
| | on fo PS 3
' : q $
4 | : ' 2 hoy | tF f 7 2
{ { : | ' -- | i 1 &
4 tr + g
| ; | | | = 3
Lt i ‘ : ‘ Vt 2
tf b i i 4] Ss
| \ | 2
DATUM RL. 6.00 { i } N ( 4 ! 8
Les1,5im 7 ° roe 7 ” 7 L122
VERTICAL ALIGNMENT PNB aun SS oe
f Gras us GHOI%
L=25.00rn, ts62 06m 230. =25, is25 Sam = = 21 - : 2 : 22 rm
HORZONTAL ALIMENT 2k ee OS ae a a
LEVEL DIFFERENCE : - " J
CUT-/FILL+ 5 35 2 ek £3 3 5 38 3 gas zz ¢ 235 gs 8 #2 2 aR 2 3
DESIGN SURFACELeveL | ae 8 B 88 g & 2 z ae 2 £2 8 gB OE z28 3 z 2 gz gg a 3
x a5 8 2 22 ¢ #2 2 2 22 3 z2 = ge 2 gas = s x a ss sof =e
EXISTING SURFACE LEVEL |e 2 5 > - na _ : - — 'GHD) CLIENTS | PEOPLE | PERFORMANCE
custssuneaceieve, lp gg 233 88 2 fF 88 8 588 a5 ce a8 88 28 ad
— - + = = = + = = = ¥ ~ - Konara rr Vitbe. een 104578 Aaeas
CHAINAGE 8 g 2 @8 RB & 8 g 22 z 3s s zg 6s gBs 5 g 2 aR 28 2 8B ‘nena
8 gag gg 2 6 = - 88 § 3828 gE: RAS a 8 33 8 as Torr expen rent ser 0199
© teatmal@ghd com W wine ght.
LONGITUDINAL SECTION - TRACK 01 SHO eons ae
Orewn B JOHNSON Designed B JOHNSON
PSMNo | STN99977 0 2 4 6m Vert. 1:100 @A1 5 :
1: —
(AHD)RL| _RL.24.294 § chess A aa on
SURVEYED| SCRC 20 40 60m Harz. 1:1000 @A1 Approves o— ‘
Dawe +ffolHto .
E ORAWN TRANSPORT & ENGINEERING SERVICES EENIE CREEK RD - NOOSA HEADS Project Number
c CHECKED DESIGN SERVICES (NORTH) ; ° 1 ?1 06
uns h ine oast GIRRAWEEN SPORTS PRECINCT - EARTHWORKS CONTRACT
B PROJECT REVIEW Nambour Office
A Corer of Bury Street & Currie Sireet, Nambour. i ‘ TRACK 01 LONG SECTION Drawing Sheal No.
ENG. CERTIFICATION n Regional Council
Locked Sag 72, Sunshine Coast Mall Centre, Nambour, QLD 4560
Ry DATE REVISIONS REC. APPR. RPEQ.No| 6681 (Brian Peables) Nambow ph(07) 54758501 tax(07)$441 SHEET 1 OF 2
Page 81
RETAINING WALL LENGTH 40m NOM,
REFER 20B SPEC. C82
7
eS
RL 15.480
_
RETAINING WALL, REFER
JOB SPEC. (1.8.2
TUBULAR STEEL FENCE TYPE 1-4,
REFER IPWEAO ORG NO. G-044
HEIGHT VARIES
TRACK 01
FUTURE CRITERIUM TRACK
4.0 4.0
3%
CONTROL LINE TRACK 01 TYPICAL SECTION
CH 462.0 - CH 502.0
SCALE 150
2 S
2 s
¥ & zt
RETAINING WALL SETOUT 3 3 e
/E\ DETAIL Fy *. FUTURE CRITERIUM TRACK
\ coos 7 SCALE 1250 3
: 4.0 6.0
= j 4 { \ Lio -3 nay om DESIGN SURFACE
DESIGN SURFACE [ Lf ' | i i | lay
4 : t a ~
“ oy | ! |
\ | | ! i i CONTROL LINE TRACK 01 TYPICAL SECTION \ satan SURFACE
\ 4 ' CH 35.0 - CH 462.0
~ | ume sur | : CH $02.0 - CH 760.0
z i - / ' i | ‘ | | : SCALE 150
‘ seh oy :
2 : [j ye | i
8 ® : ‘ : | { | 1
ga | in ‘y | =
et oy : l l =
& | | : | | { { x >
2 i : to f { < Q
s i : j | ! | { & 2
DATUMRL. 9.00 | \ | | ! — i ut | | : J FUTURE CRITERIUM TRACK _—___ *
VERTICAL ALIGNMENT iis thas aa SS af - ed
: - : $.0 5.0 et
HORIZONTAL ALIGNMENT | E202. ate. Lethsin 1s128600n ERO een 4230270 oO _ -
: . —
crits Bs 38 ge 3 8 a 52008 88 8 3 a8 8 eee PRELIMINARY
” — J NOT FOR CONSTRUCTION
DESIGNSURFACELEVEL (2 9&8 Re & 8 8 a 85 g g2 8 8 @a oe. CONTROL LINE TRACK 01 TYPICAL SECTION
ese =z: 2 2 2 BR 5 RR oz z zz z CH 0.0 - CH 35.0 -——~
existing supracetevel le = 9 2 3 5 & 2 ae R ee 8 4 = 6 8 CH 760.0 - CH 916.8 a CLIENTS | PEOPLE | PERFORMANCE
—— e 3s a : fs 8 88 ffs SCALE 15 a.
CHAINAGE 8 a8 8 8 = g 8 g zg 28 5 a 2 8 & Kasana Gusiram Vip, Giiny9 QLO 4575 Aspe
a RG Bos #3 3 fa of as = 5 a8 OE errata fence
GHD Job No, 41-22382
LONGITUDINAL SECTION - TRACK 01 0 1 kam 8st} tem lemme Teen bomen
PSMNo| STN99977 A: ‘ ‘ ? = a
aor RL.24.294 ‘ ‘ 2 - ven ens Scale 1:50 @A1 Scale 1:250 @A1 ast ASW lest EX fav
SURVEYED scRG 0" 20 40 ~—-6Om_Hore. 1:1000 @At eho 1
E oA TRANSPORT & ENGINEERING SERVICES . EENIE CREEK RD - NOOSA HEADS 432106
c DESIGN SERVICES (NORTH) Sunshine Coast GIRRAWEEN SPORTS PRECINCT - EARTHWORKS CONTRACT
Al PROJECT REVIEW Nambour Office 7
e ENG. CERTIFICATION Comer of Bury Street & Curie Stret, Nambour, Regional Council TRACK 01 LONG AND TYPICAL Drawing Shei No,
aif DATE RETSIONS nec ere] PEG No| ~@681 Bran Foam) eee SRORSTE SN RMT Ee - ___] SECTIONS - SHEET 2 OF 2 C013
Page 82
GIRRAWEEN SPORTS PRECINCT STORMWATER CALCULATIONS JOB NO. 41-22382
Page 83
STORMWATER CALCULATION TABLE
o w w
(%) apes adig 21) - | 8 |B
alafja fola
ol; a }alo
azig adig cic}; ec lela
Lo [Ww wu Q Qo
RIN] S&S wo w
eo 1) m vt t
(sa) o> [eo | st 1a |co JN In |
oO
MOl4 PaUruIog |" | |] [09 | ta [ey
(SA) so} In | lou |st [a [oo jt
quewyayeg qns CD fr |U ]60 | [10 | ON [oo
(eueay 1818/9 /0/B/B isle
ATS SIN Je fe [fe
WIWYIIVD ANS [515 |O/Fld|slolo
yours Weis iSIBIs Bigs
JO WAIIA-0D 19 S15 |Sid |G |S/G
3 163 | 1S Ly 1S [3 18
Aysuaquy peywensfes [os les he los [i lo Ie
|r - = |e 109
"OUOD JO auUL fio [19 |B JQ IQ | [wo
luv Ubisag H{-|-|8|-|8]-|8
= ~
nud ISS S]) 848
Page 84
al
CLIENTS|PEOPLE|PERFORMANCE - - CALCULATIONS
Ctient SCRC Job no. Ut- 22382 Sheet ' of
Projet Carta ueen Sports Frecin et Calcs by BYT Date }
>) sie Stormuvater Coles Checked by Date
, PB
“ Arecn = 0.25 naw
Te = BOmn (Quom Fig 4.07)
Go? 0.53 (QUDM Bhle 4.05.2 bS
C, 72 O.S%x OQeO, 414
roa ? OSB x 1.2* 0.636
) 7°T, 2 78. Lhe
20 32 1BS-SErmn| he
using Rchone\ Mehod,
Q.: 580
) . Ghd x T3.22O.25
soo2m{s = 22/5
0. 636xI8S. SGKO- 15
Q lag = REO
= 0.08Imifs = 82 b/s
Page 85
=
J ). CLIENTS|PEOPLE|PERFORMANCE_ ce ee RR PAE pe en 8
CALCULATIONS .
r ~_ TOT Rem ae oe ce ER Ey
| Client . SERG . . : Job no. ui- 12392 Sheet of oe
I roies Girrouseem Sports Complex - Colesby BMT
Checked by
YL Setiee Stormwater Ges
Prt if2
Bren? ©.226he
a) be: 1.0
S19 * 0.90
Cy: O20K0.% = 0.77,
; fo 2 Soma
) SL, = (19 Sanne
ua ay Redrera\ Metnod
0.72% 124.83 ¥ 0.226
Qy = S60
2 0.0 8a {5 = S~W cfs
“Malet Capacity (A00%s00 Fede Wet)
Qa BFxI.66 Lye
7 O.S« 1.66% 3.6% 0.17
| = 0.6%4m!s = ay O/s
, Pit 2f2-
| Ares 6SOm” = 0,065 ha
Qs O12
T= (253eelbe
| O.714,\79.53 xB.08S
Q= 360
) = 11elg
Page 86
= CED CLIENTS|PEOPLE|PERFORMANCE | Clie «= SCRE ; Girra ween Sports Prean + Project CAG yf Subiea Stormwater Coles — I 1 Pits tl 4, 24, 34, 44 . ‘mow’ Letcnincnt. Brea #O-SIha ee 1 eins "Values ok Dit C os per Pt ifs sina, Retinal Mehroa, : 0.424 x 13:2x0-52 Qi? 360 = 2.045 m/s = 45 ffs CALCULATIONS ~ Job no. a -2L392 Sheet Cales by BM T Date _ Checked by Oy > BF < 166 ch (Quem 7.08) , . 2 OS< Nob eLdvo. = 0.063 = 63¢/s
Page 87
GHD} isons ‘AL CULATIONS @Q~ CALCULATIONS $C €c Job no. 4i- 22372 Sheet .!. of . Client Project Girromer Sports Precinct : Cales by BMI Date 22/3 [io ) Subject Bio . Retortion Arcas , - Checked by. Date Impervious Brea to be treated = pavement ATEN = Appr 6 COOm? From Girtow een Stor muater Moreaenent Pio Fealoaics EngincesS , Tegvirentuenl 2S fo inkilvation orem. are 2% bioretastion t O Bio celantion Area reg = 120m Infiltration Areon reg. = %0Om* with Im depth Use sulle as Infiltration Arca 0.350 ) pigr 7 20n an LL 4S @ 357mm deep approx Bor is requifed as in fil Ot Or, 459 bong sncte isto he Wed.
Page 88
rhs nm Wie we ANY ,.. IN an - . fay ote cyicg fie 6 gt fz poet ws Sunshine Coast Regional Council Specification for Girraween Sports Precinct Earthworks Package March 2010
Page 89
= 41/22382/11840 Contents 1. Preliminaries 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 Location of Site Site Facilities Australian Standards Quality Assurance Inspection, Testing and Testing Fees Traffic Excavation Diverting Water Setting-Out 1.10 Public Utilities - Regulations, Notices and Fees 1.11 Site Meetings 1.12 As-Constructed Data, Compliance/Certificates 2. Local Authority Requirements 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 General Development Approval Compliance Standards for Construction Standard Specifications and Drawings Prestart Meeting Inspections by the Sunshine Coast Regional Council (SCRC) On-Maintenance Inspection Off-Maintenance Inspection 3. Clearing, Grubbing and Earthworks 3.1 3.2 3.3 3.4 3.5 3.6 3.7 Scope of Works Clearing and Grubbing Stripping of Organic Matter Earthworks Quality Control Testing Utility Services Erosion and Sediment Control Girraween Sports Precinct Earthworks Package = oon wmnwmen eae ase as = = oo = nN 2a ep oa eo an an on a WwW WN DY LY = oa mM NM we = =a = Ss=53 4535 N0aQ
Page 90
41/22382/11840 Pavements 4.1. Gravel Pavements 4.2 Subsoil Drains Stormwater Drainage 5.1. Culverts and Pipework 5.2 Excavation 5.3 Bedding 5.4 — Laying and Jointing of Pipes 5.5 Backfilling 5.6 Inlet Drains, Outlet Drains and Open Unlined Drains 5.7 Concrete Kerbs and Kerb and Channel 5.8 Reinforced Concrete 5.9 Stone Pitching 5.10 Manholes and Kerb Inlet/Gully Pits 5.11 Headwalls, Wingwalls and Aprons 5.12 Gross Pollutant Traps 5.13 Geometric Tolerances Concrete Work 6.1. Materials and Construction Requirements 6.2 Concrete Strength Criteria 6.3 Rejection of Concrete 6.4 Testing and Assessment for Compliance of Concrete Specified by Compressive Strength 6.5 Costs for all Testing 6.6 Reinforcement 6.7 Handling and Placing of Concrete 6.8 Compacting of Concrete 6.9 Construction Joints 6.10 Formwork 6.11 Curing of Concrete 6.12 Surface Finish Topsoiling and Grassing 7.1 General Girraween Sports Precinct Earthworks Package 24 24 25 28 28 28 29 29 30 31 31 32 32 33 33 34 34 35 35 35 35 35 36 36 36 38 38 39 40 41 42 42
Page 91
a 7.2 Topsoil Operations 42 7.3 Playing Field Surfacing Construction 42 7.4 Irrigation System 43 7.5 Grass Seeding 44 7.6 Hydroseeding 44 7.7 Turfing 44 8. Retaining Walls 46 8.1 Rock Retaining Walls 46 8.2 Concrete Block Masonry Retaining WallsError! Bookmark not defined. 8.3. Timber Retaining Walls Error! Bookmark not defined. 8.4 Fencing of Retaining Walls Error! Bookmark not defined. 9. Two Coat Seal — Prime Coat 47 9.1 General 47 9.2 Authority to Commence Priming 47 9.3 Plant 47 9.4 Application 47 9.5 Aggregate 48 9.6 Acceptance Tolerances 48 9.7 Test Certificates for Sprayed Primes and Seals 49 41/22382/11840 Girraween Sports Precinct Earthworks Package
Page 92
= 1. Preliminaries 1.1 Location of Site The Site of the works is located off Eenie Creek Road, Noosaville. 1.2 Site Facilities The Contractor shall provide statutory and necessary amenities and sanitary facilities for workers and other persons lawfully on the Site, and remove them on completion of Works. The location of establishment of the Contractor's Site facilities shall be to the approval of the Superintendent. The Contractor shall make all arrangements and pay ail charges in connection therewith, for any temporary services that may be required for the execution of all works under this Contract. 1.3 Australian Standards Australian Standards referenced in this document are to be the latest/current issue of that standard unless noted otherwise. 1.4 Quality Assurance 1.4.1 Requirement The Contractor shall implement a quality management system under this Contract in accordance with the requirements of AS/NZS ISO 9002: The Contractor shall comply with this Specification, Quality Assurance Requirements. 1.4.2 Quality Assurance Representative The Contractor shall nominate a suitably qualified Quality Assurance Representative (QAR) who has authority to effectively control the Quality System as implemented on the Site. 1.4.3 Quality System Documentation The Contractor shall submit to the Superintendent a copy of the following documents within 14 days of the award of the Contract: » Quality System Certification to AS/NZS ISO 9001; » Corporate Quality Manual (for review and return to the Contractor); » Two controlled copies of the Project Quality Plan. The Contractor shall also provide the Superintendent with access to inspect Corporate Quality Procedures applicable to this Contract. The Project Quality Plan shall follow the guidelines of interim Australian and International Standard 41/22382/11840 Girraween Sports Precinct 1 Earthworks Package
Page 93
= AS/NZS ISO 9004.5: Part 5. Guidelines provided by Australian Standard AS/NZS ISO 3905: shall also apply. The Project Quality Plan shall cover all quality system elements required by the appropriate Quality Systems Standard as specified, that are applicable to this Contract. As a minimum the Project Quality Plan shall contain the following information: » A Project Organisation Chart or list of nominated Project Personnel showing their positions, lines of communication and details of the responsibilities of the positions. » Details of the qualifications and experience of the following positions: — Project Manager; - Contractor's Quality Representative (QAR); — Surveyor; ~ Foreman, Supervisor(s). » A.Lot Plan, or the methods by which lots will be identified. » Inspection and Test Plans for the various phases during manufacture, construction and commissioning, as applicable to the project, to be submitted at least 7 days prior to commencement of relevant activity. » Acopy of the NATA Terms of Registration for the Contractor's Compliance Testing Laboratory (Internal or Sub-Contract). » Project specific operating procedures or descriptions outlining as a minimum, details of activities, who is responsible for implementation/verification, identification of relevant Quality Records and distribution and of such records, to be submitted at least 7 days prior to commencement of relevant activities. » A Register of all intended Quality Records to be used on the project, together with proformas. 1.4.4 Inspection and Test Plans Inspection and Test Plans shall contain at least the following information for each significant activity identified in the relevant process: » Description of activity; » Specification requirements/reference; » Person responsible for activity (title); » Hold Points and Witness Points; » Activity checklists; » Inspection and test type; » Tolerances or other acceptance criteria; » Identification of relevant procedure and quality records; 4142238211840 Girraween Sports Precinct 2 Earthworks Package
Page 94
= » Test/inspection frequency; » Work item or work lot identification. Inspection and Test Plans and examples of their relevant activities checklists established for this Contract shall be submitted to the Superintendent for review. Where considered necessary the Superintendent may request the Contractor to insert additional Hold Points or Witness Points. Provisions shall be made for the Contractor and Superintendent to sign off at these points. 1.4.5 Identification and Traceability All work under this Contract including manufacture, Site construction and commissioning, shall be subdivided into distinct work lots or work items. Work lots or work items shall be chosen by the Contractor, consistent with any specified requirements, but shall be subject to approval by the Superintendent. Each work lot or work item shall be assigned a unique identification number, and the Contractor shall maintain a register of all allocated work lot or work item numbers. This register shall contain, as a minimum, the following information: » Brief description of the work lot or work item; » Location reference (3 dimensional where applicable); » Lot or item status (conforming or non-conforming). The Contractor shall ensure that traceability is maintained throughout all documented records under this Contract. All test results where applicable under this Contract shall be positively identified with their respective work lot or work item number. The Contractor shall notify the Superintendent in writing 24 hours prior to commencing a new work lot or work item. 1.4.6 Conformance Reports Conformance Reports shall be prepared for each designated work lot or work item, and made available to the Superintendent on request. Conformance Reports shall include a verification statement certifying that the relevant work lots or work items have been inspected and/or tested in accordance with the Contractor's Inspection and Test Plan(s) applicable to this Contract and that they comply with the specified requirements of the Contract Documents. Conformance Reports shall be accompanied by the following documents: » All relevant signed off Inspection and Test Plans and associated Checklists; » NATA certified compliance test results (where applicable). Note: in cases where test results are not available within this period (eg. 28 day concrete strengths), the Contractor shall submit preliminary results or previous analytical data of the same mix type which statistically indicates a high probability of conformance. Submission of such information does not absolve the Contractor from its responsibilities under this Contract should actual results subsequently identify nonconformance of the work lot or work item. 41/22382/11840 Girraween Sports Precinct 3 Earthworks Package
Page 95
or » Survey and measurement compliance data (where applicable). In any statement of an amount for payment in a Progress Certificate issued under Clause 42.1 of the General Conditions of Contract, the Superintendent shail not be obliged to include in any such certificate and the Principal shall not be obliged to pay for, any work for which evidence of conformance has not been submitted as set out in this clause. Certification and payment shall not be unreasonably withheld, however, where the relevant evidence of conformance has not been submitted due only to the normal delays in processing, testing, analysis and reporting. In this case the Contractor's payment claim shall set forth the lots claimed for payment but for which conformance reports have not been submitted and certifies that conformance reports for those lots will be submitted prior to the next payment claim. 1.4.7 Nonconformance Reports The Contractor shall submit a Nonconformance Report to the Superintendent within 24 hours of detecting nonconforming work. The Contractor's Nonconformance Report shail clearly detail but not be limited to the following items: » The nature and extent of the nonconformance; » The work lot or work item number it relates to including the precise boundaries of the nonconforming work; » Any relevant information, data, test results and/or measurements (as applicable); » The corrective and preventive actions the Contractor proposes to take; » The time frame within which the nonconformance will be rectified. The method of isolating/dentifying nonconforming work, applying and releasing hold points, etc, shall be clearly stated in the Project Quality Plan. The proposed corrective action shall be subject to approval by the Superintendent. 1.4.8 Default by the Contractor Failure by the Contractor to submit either a Conformance Report or a Nonconformance Report within the nominated time frame shall constitute a substantial breach of the Contract and may, at the Superintendent's discretion, be subject to a stop work order. As a result of such action by the Superintendent, and in addition to the Contractor's responsibility to rectify the nonconforming work, the Contractor shall be responsible for its own costs for any time delays due to such breach of Contract. 1.4.9 Hold Points and Witness Points A Hold Point is defined as a position in the progress of the work under Contract, beyond which further work shail not proceed without mandatory verification by the QAR or the Superintendent. A Witness Point is defined as a position in the progress of the work under Contract, where the Contractor must notify its QAR, the Superintendent prior to proceeding and the option for attendance for witnessing 41/22382/11840 Girraween Sports Precinct 4 Earthworks Package
Page 96
= of inspection and test may be exercised. If any do not attend, then work may nevertheless proceed, unless otherwise instructed. Witness Points shall apply to verify compliance of the constructed works with the approved design drawings. Mandatory Hold Points shall include, but are not limited to, those listed below and shall apply to this Contract to ensure compliance with the intent of the designs and with other specified requirements, and to ensure that critical and/or irreversible activities are not constructed incorrectly. Mandatory Hold Points: » Subgrade inspection, after boxing out but prior to installation of the side drains, » Pre-Seal pavement inspection (shall include inspection prior to the placement of any asphalt, concrete or pavers); » Reinforcement detailing (shall take place before any concrete is placed, and shall include dowels/jointing in concrete pavements); » Playing fields finished surface levels. Prior to commencement of the surface amelioration the Superintendent shall inspect the works and give approval to proceed; » On-Maintenance inspection, after works are completed; » Off-Maintenance inspection, at the end of the 12-month defects liability period. » Witness Points: » Stormwater (shall take place after pipework / conduits are laid, but prior to backfilling); Mandatory Hold Points shall apply prior to commencement of designated work lots or work items. To obtain authorisation to proceed, the Contractor shall ensure the following: » That all work lots or work items affected by the lot or item in question are conforming, » That all Conformance Reports for all work lots or work items affected by the lot or item in question have been submitted at least 24 hours prior to the tine the Contractor intends to proceed with the lot or item in question, thus ensuring that defective works are not built-in. Design and Construct Elements The contract involves design and construct elements as follows: » Irrigation system; » Playing fields growing media remediation. The proposed design shall be submitted to the Superintendent for approval prior to commencement of construction. 1.4.10 Compliance Inspections and Testing All compliance inspections and tests shall be based on work lots or work items unless otherwise 41/22382/1 1840 Girraween Sports Precinct Earthworks Package
Page 97
= specified in the contract documents. The costs for all such inspections and tests shall be borne by the Contractor and included in the Contract Sum. All compliance testing shall be carried out by a NATA registered laboratory certified for the tests specified in this Contract. The Contractor shall advise the Superintendent of the work lot or work item number and the location within the lot or item, prior to any testing of the lot or item. The Contractor shall submit a Nonconformance Report and the proposed corrective action for any nonconforming test result. No further testing shall be permitted until approval by the Superintendent. For compliance inspections the Contractor shall nominate responsible persons, who are not directly involved in performing the work. The frequency of compliance testing shall be in accordance with the minimum requirements of the Contract Documents. , The Contractor shall submit to the Superintendent any preliminary results of compliance tests carried out for each work lot or work item with 24 hours of completion of tests. 1.4.11. Subcontracted Work The Contractor shall ensure that subcontracted works and procured supplies are subject to appropriate quality assurance standards when incorporated into the works in order to comply with the requirements of this Contract. If requested by the Superintendent, the Contractor shall provide evidence of appropriate quality assurance for subcontracted work or procured items incorporated into the works under this Contract. This shall include verification by the Contractor. 1.4.12 Quality Records The Contractor's quality system shall include sufficient quality records to provide objective evidence that the requirements of the Contract are met. This shall include Subcontractor's and Supplier's records relevant to this Contract. The Contractor shall, when requested by the Superintendent, provide access to all quality records relevant to the Contractor's quality system under this Contract. Within 28 days of the Date of Practical Completion, the Contractor shall forward a complete and bound clean copy of at least the following records to the Superintendent. Previously submitted documents may be selected as appropriate. » ~The Work Lot or Work Item Register for the Contract; » All Conformance and Nonconformance Reports; » All Inspection and Test Plans and associated Checklists; » All test results, analyses, reports, measurements and observations; 41/22382/11840 Girraween Sports Precinct 6 Earthworks Package
Page 98
= » The original Project Quality Plan and any changes made to the Contractor's Quality System. Records shall be maintained by the Contractor for a minimum period of two years from the Date of Completion or in accordance with the Contractor's statutory requirements if the latter exceeds the minimum period required for this Contract. Records for equipment and parts subject to inspection and approval by the relevant regulatory authority shall be made available on Site at the time of arrival of all relevant items at Site, or after inspections have been carried out on Site (if applicable). 1.4.13 Quality Audits The Contractor shall submit an audit schedule to the Superintendent at the time of submission of the Contractor's Quality System documentation. This shall include internal audits and external audits on Suppliers and Subcontractors. The Contractor shall carry out at least one audit on each of these groups over the duration of the Contract, and submit all audit records including objective evidence for any necessary follow up corrective actions attached to close out corrective action reports. 1.4.14 Certifications To Accompany Each Payment Claim Each Payment Claim shall be accompanied by a Conformance Report from the Contractor in respect of the works completed to the date of the claim and the subject of the claim, certifying that the works as constructed are in full accordance with the Contract requirements. At Practical Completion Prior to the Date of Practical Completion, the Contractor shall submit a Conformance Report certifying that the works have been constructed in accordance with the specification and drawings or approved revisions there-to. 1.5 Inspection, Testing and Testing Fees The Superintendent shall have the right to enter, for the purpose of inspection and testing at any time during working hours, any premises where articles for inclusion in the works are being manufactured or stored. The Contractor shall afford the Superintendent every opportunity to inspect any article which is manufactured or stored off-Site prior to delivery to the Site for inclusion in the works. The Contractor shall supply all labour and equipment and render all assistance required to enable carrying out of all tests and inspections which are necessary for the purposes of this Contract. The Contractor shall perform all inspections and tests required by the Contract and such other inspections and tests as are necessary for proper compliance with the Project Quality Plan and good construction practice. The Superintendent reserves the right to order additional samples and testing to satisfy itself that the requirements of the Contract are being met. The Contractor shall arrange for carrying out of testing 41/2238 2/11840 Girraween Sports Precinct 7 Earthworks Package
Page 99
= and/or the obtaining of samples by a testing Authority nominated by the Superintendent. In the event that the tests indicate compliance with the requirements of the Contract, payment will be made for testing on a prime cost basis. The Contractor shall be responsible for the costs of all testing which demonstrates that the works do not comply with the requirements of the Contract. If the Contractor fails to perform any of the foregoing obligations with regard to testing, the Principal shall be at liberty to perform/undertake any testing or inspection at the Contractor's works or elsewhere, and all costs and expenses incurred in the matter shall be payable by the Contractor to the Principal on demand, or may be deducted and retained by the Principal from monies due or that may become due to the Contractor under the Contract. 1.6 Traffic The Contractor shall provide for continuous operation of normal traffic along all roads and pedestrian and vehicular access to properties included in the Contract or intersected by works under the Contract. The Contractor shall be responsible for any necessary approvals for the transport of any earthworks and road building materials. The Contractor shail be held entirely responsible for the safety of all pedestrian and vehicular traffic and shall provide all necessary watchmen, lights, barriers, notices and signs and shall provide and maintain the same to the satisfaction of the Superintendent and/or the Local Authority. Signs shall conform to the current DTMR Manual of Uniform Traffic Control Devices (Qld). The Contractor shall not unnecessarily in its operations obstruct any side road, branch track, drain or watercourse and shall not break down any fences or gates without prior notification to the Superintendent, but when such obstructions or breakages cannot be avoided, shall remove such obstruction or repair such breakage as soon as possible. In the event of the Contractor failing to comply with its responsibilities under this Clause the Principal shall have the power, without further notice, to take such steps as the Superintendent considers necessary to provide for the passage and safety of traffic or to remove any obstruction or to repair any damage including, if it considers it necessary, the employment of workmen and watchmen and the cost thereof will be deducted from any monies due to the Contractor under this Contract. Notwithstanding any action the Superintendent may take in this regard, the Contractor shall be liable for damages arising out of any accident in connection with the carrying out of the Contract. 1.7 Excavation The Contract Sum shall include excavation in all materials. No extra payment shall be made for excavation irrespective of the materials or conditions encountered. 1.8 Diverting Water The Contractor shall do all work necessary to divert any water interfering with the progress of the works, keep the excavations free from water while the works are in progress, and prevent any injury to the works by water due to floods or other causes. The Contractor shall provide, where considered 41/22382/11840 Girraween Sports Precinct 8 Earthworks Package
Page 100
necessary by the Superintendent, sand traps on the discharge line of any pump to prevent the deposit of material in channels and stormwater drains. Where water is diverted from the Site it shall be confined to existing drainage paths and away from adjacent private property. 1.9 Setting-Out Construction works set-out including road centreline pegging will be provided by the Contractor. The Contractor is responsible for his own set-out using the plan coordinates and set-out details and the Principal's survey information provided. The Contractor is responsible for maintaining all survey controls during the course of the Contract. The cost of maintenance and reinstatement is the Contractor's responsibility. Survey information showing property and construction levels, dimensions and datum for levels is shown on the drawings. All work shall be set out by the Contractor in accordance with the information supplied. The Contractor shail accept full responsibility for all setting-out and levelling and shall be responsible for making good and bringing to required line and/or level any works which are wrongly built whether due to error in transference of levels or dimension or to any other cause during setting-out. The Contractor shall offset all essential engineering pegs during the works to enable the Superintendent to carry out checks on line and level and to enable works to proceed in accordance with the program. 1.10 Public Utilities - Regulations, Notices and Fees The Contractor shall carry out all work under this Contract in accordance with the provisions of this Specification, and in addition shall comply with the latest requirements of the following and pay all necessary fees: » Local Council » Australian Standard AS 3000 — (SAA Wiring Rules) » Division of Occupational Safety and Weights and Measures » The Building Act » Inspection of Machinery Act » Workplace Health and Safety Act » Energex » Any other Authority having jurisdiction over the work Where overhead public utility lines and surface drainage works and/or underground pipes, conduits, or cables exist in the vicinity of the works, the Contractor shall take care to protect such facilities from damage and, in the case of any damage occurring to such facilities, the matter shall be immediately reported to the department or company concerned and to the Superintendent. The cost of the necessary 41/22382/11840 Girraween Sports Precinct 9 Earthworks Package
Page 101
= repairs or renewals shall be bome entirely by the Contractor. If itis found to be necessary to alter the location or level of any existing mains or services to conform with construction under this Contract then the Contractor shall notify the Superintendent immediately. Should relocation of existing services be specified or directed by the Superintendent the Contractor shall arrange for the work to be carried out by the appropriate Service Authority. Charges payable to the Service Authorities will be paid as Dayworks. 1.11 Site Meetings The Contractor shall provide for and attend meetings between the Contractor, appropriate Sub Contractors and the Superintendent for the duration of the Contract. The frequency of these meetings shall be fortnightly. The Superintendent shall chair the meetings, record the minutes and circulate to attendees. 1.12 As-Constructed Data, Compliance/Certificates Drawing Preparation As-constructed drawings are required for: » earthworks » roadworks » drainage (including roofwater) » irrigation » telecommunications services As-constructed surveys and preparation of the as-constructed drawings shall be the responsibility of the Contractor. The Contractor shall engage a Registered Surveyor to prepare the as-constructed drawings and to certify that the survey information contained thereon represents the true and accurate location of the relevant construction element presented in the data. The as-constructed drawings shall contain sufficient details to satisfy the requirements of Sunshine Coast Regional Council. Finished surface level information is required to show surface levels and site contours at 0.5 metre intervals. All levels are to be shown as Reduced Levels to the Australian Height Datum (AHD). The As-Constructed Drawings shall be submitted in: » Two (2) hard copy A3 plans; and » Digital ADAC form (the design drawings are available as a base to the contractor from the Principal). The digital form shall be provided on a CD-ROM or alternative medium approved by the Superintendent. The data shall be supplied in an ‘AutoCAD’ drawing. The Contractor shall certify the drawings for 41/22382/11840 Girraween Sports Precinct 10 Earthworks Package
Page 102
accuracy of the information by its endorsement on the drawing and digital file. Marked-up prints of the electrical drawings, Telstra conduits and Energex Gas conduits are to be supplied by the Contractor to the Superintendent, highlighting any deviations from the designs. Miscellaneous Project Documentation The Contractor shall supply two (2) copies of all other project documentation to the Superintendent. Copies of all test results shall be retained for all tests required to conform to the Local Council Standard Specifications and this Specification. While not a complete listing, the following details some major components to be included: fill compaction test results subgrade CBR's subgrade replacement material quality subgrade replacement material compaction test results subsoil drain filter media quality statements (or gradings where required) subbase course and base course material quality statements subbase course and base course compaction test results prime or primer seal spray and application rates AC core test results (including relative compaction, thickness measurements, percentage voids and percentage bitumen content) any concrete testing required by the technica! specifications pipework material quality statements for all pipework material (stormwater, etc) geotextile material quality statements any other testing results or statements required to conform with the Local Council Standard Specifications any other job specific testing carried out or ordered by the Superintendent, if used. The documentation should be presented in a logically assembled and bound document including a table of contents confirming completeness. 41/22382/11840 Girraween Sports Precinct 1 Earthworks Package
Page 103
= 2. Local Authority Requirements 2.1 General The local authority responsible for the works under this Contract is the Sunshine Coast Regional Council. It is a requirement of the Contract that all works under the Contract be accepted by the SCRC, initially ‘on-maintenance’ and ultimately ‘off-maintenance’. The Superintendent may delay issue of the Certificate of Practical Completion for each separable part until the works are accepted ‘on-maintenance’ by the Council, and similarly may delay issue of the Final Certificate until the works are accepted ‘off- maintenance’. 2.2 Development Approval Compliance The Contractor is responsible for compliance with all conditions of the development approval. These conditions may include, but are not limited to: » Environmental Management Plan » Erosion and Sediment Controi Plan » Site Based Stormwater Management Plan » Referral to State Agencies for advice or compliance » Air Quality Assessment » Noise Impact Assessment » Vegetation Management Plan » Acid Sulfate Soil Management Plan 2.3 Standards for Construction The Contractor shall use current SCRC standards for the supply of all materials and the execution of the works. Where no SCRC standard exists, the following order of precedence of standards shall apply: » Queensland Department of Transport and Main Roads standards; » Local Government Engineers’ Association standards; » Australian Standards; » British Standards; » Standards consistent with the best engineering and construction practice. Where there is dispute over the standard that applies, the Superintendent shall nominate the standard to be applied. 41/22382/11840 Girraween Sports Precinct 412 Earthworks Package
Page 104
= 2.4 Standard Specifications and Drawings The Contractor shall maintain on site all relevant standard specifications and drawings issued by the SCRC. 2.5 Prestart Meeting Seven (7) days notice shall be given prior to commencement of construction. The following people are required on site for a Prestart Meeting: » Contractor's Engineer/Project Manager; » Contractor's Site Supervisor; » Project Superintendent; » Council's Engineer/Inspector 2.6 Inspections by the Sunshine Coast Regional Council (SCRC) Officers of the SCRC may make random inspections of the works at any time. The Contractor shall co- operate fully with Council Officers making inspections. Specific approvals from the SCRC that will be required include: Roadworks and Drainage » Pavement design approval, based on soaked CBR tests arranged by the Contractor; » Subgrade inspection, after boxing out but prior to installation of the side drains; » Pre-seal inspection, after placement pavement before the pavement is primed; » On-maintenance inspection, after works are completed; » Off-maintenance inspection, at the end of Council's twelve-month maintenance period; At least 48 hours prior to the time when the works will be ready for testing or inspection in relation to any of the tests required by Council, the Contractor shall contact the Superintendent to arrange a mutually acceptable time for such testing or inspection to be carried out. The Contractor shall allow for all necessary inspection, testing and approvals in the works programme and no extension of time will be granted for delays so resulting. If reinspection is required where the works are not approved or a test fails, the Contractor shall be responsible for any re-inspection fees or charges that may be charged by the Council. 2.7 On-Maintenance Inspection Prior to Council inspection, the Contractor shall arrange for all roads to be cleaned, gutters swept, footpaths reinstated and all drainage systems to be flushed and cleaned and costs shall be included in the Tender Lump Sum. 41/22382/11840 Girraween Sports Precinct 13 Earthworks Package
Page 105
or The ‘on-maintenance' inspection shall be attended by at least the following personnel: » Superintendent; » Contractor; » Council's Subdivision Engineer/Inspector. Acceptance by Council does not constitute practical completion or acceptance ‘on-maintenance’ by the Principal. The general requirements to be met prior to Council's acceptance of the works ‘on-maintenance’ are as follows: » the site is clean, tidy, free of rubbish, rocks, sticks, unauthorised stockpiles, etc.; » earthworks and site grading to be free draining and in accordance with the approved design; » sediment and erosion control works in place to the satisfaction of Council; » maintenance security deposit lodged; » ‘As Constructed’ submission lodged for approval seven (7) days prior to ‘on-maintenance’ meeting. 2.8 Off-Maintenance Inspection At the end of 12 months from the ‘on-maintenance’ approval date, an ’off-maintenance’ inspection is to be arranged with Council. The ’off-maintenance’ inspection is to be attended by: » Council's Subdivision Engineer/inspector » The Superintendent; » The Contractor. During the 12 month maintenance period, it is the responsibility of the Contractor to rectify any works found to be defective or found to exhibit faults attributed to the performance of the construction activities in terms of quality and conformance with the design and specifications. At completion of the maintenance period and prior to the Council inspection the Contractor shall arrange for all roads to be cleaned, gutters swept, footpaths reinstated and all drainage systems to be flushed and cleaned and costs shall be included in the Tender Lump Sum. All costs during the maintenance period for defects rectifications as well as attendance at the ‘off- maintenance’ inspection are to be allowed for by the Contractor in his tender prices. 41/22382/11840 Girraween Sports Precinct 14 Earthworks Package
Page 106
= 3. Clearing, Grubbing and Earthworks 3.1 Scope of Works Work covered in this section of the Specification includes the requirements for clearing and grubbing and all aspects of earthworks and shall be carried out in accordance with AS 3798 unless specified otherwise in the following clauses. All work shall be undertaken in accordance with the Erosion and Sediment Control Plan. 3.2 Clearing and Grubbing 3.2.1 Clearing The whole area as defined below shall be cleared of all logs, undergrowth, noxious weeds, grass and alt obstructions and rubbish of every description, trees, undergrowth and grass being cut as close to the ground as possible. The area to be cleared shall be the entire area over which roads, drainage works, embankments, playing fields, excavations and services installations are to be constructed. No other trees on site are to be removed unless identified. Trees to be preserved will be identified on site by the Superintendent and these trees shall not be disturbed in any way during the construction operations. Trees currently identified to be preserved are shown on drawing C004.. All engineering and RP survey pegs are to be protected from damage during clearing work. 3.2.2 Grubbing Grubbing shall mean the removal from the ground of all trees, roots, stumps, surface rocks and obstructions to a depth of 200 mm below natural ground surface. Ungrubbed rocks under embankments. may be left undisturbed providing there is a depth of at least 600 mm of earth covering over them when the filling operations are completed. Grubbing shall be carried out over the full cleared area specified herein. All grub holes shall be refilled with approved backfill and compacted to at least the same standards as adjacent undisturbed ground. 3.2.3 Disposal of Cleared Material All rubbish, timber, rocks and other joose materials generated as a result of clearing and grubbing operations shall be removed from the site and disposed of at an approved disposal site. The Contractor shall be responsible for all damage to grass, cultivation, fences, buildings, or stock, by 41/22382/11840 Girraween Sports Precinct 15 Earthworks Package
Page 107
= fire, falling timber and any other causes arising from his operations. Any fences damaged during the execution of the work shall be immediately repaired to the satisfaction of the superintendent at the Contractor's expense. 3.2.4 Topsoil Operations Topsoil material stripped from the site, where possible shall be stockpiled for later use in spreading on the playing fields. Nominally 150 mm depth of topsoil is to be removed over the site for reuse. The topsoil shall be respread over the playing fields in preparation for amelioration in accordance with Section 3.4.5. 3.2.5 Tree Protection The Contractor shall protect existing trees, as identified by the Superintendent on site. Harmful Materials Do not store, stockpile, dump or otherwise place under or near trees bulk materials and harmful materials including oil, paint, waste concrete, clearings, boulders, plant and the like. Do not place spoil from excavations against tree trunks even for short periods. Prevent wind-blown materials such as cement from harming trees. Damage Prevent damage to tree bark. Do not attach stays, guys and the like to trees. Work Under Trees Do not remove topsoil from within the drip line of trees unless otherwise specified. If it is necessary to excavate within the drip line, use hand methods such that root systems are preserved intact and undamaged. Open up excavations under tree canopies for as short a period as possible. Roots Do not cut tree roots exceeding 50 mm diameter unless permitted by the Superintendent. Where it is necessary to cut tree roots, ensure all such cuts are clean and even so that the cutting does not unduly disturb or rock the remaining root system. Immediately after cutting, apply an approved bituminous fungicide sealant to the cut surface to prevent the incursion of root rot disease. 3.3 Stripping of Organic Matter In addition to any clearing and grubbing, the whole of the surface upon which any earthworks, roadworks, drainage or services installation is required as well as on allotments shall be stripped of all vegetable and organic matter. All stripped materia! shall be stockpiled on the site, where approved by the Superintendent and replaced on embankment slopes, footpaths and service trenches following completion of earthworks and backfilling. The Contractor shall allow in his tender for stripping 150 mm of topsoil that incorporates organic matter to 41/22382/11840 Girraween Sports Precinct 16 Earthworks Package
Page 108
the areas defined above. 3.4 Earthworks 3.4.1 General Earthworks shall be carried out in accordance with AS 3798 for large scale operations. The Contractor shall engage a NATA registered testing authority to undertake geotechnical testing to a level 1 standard in accordance with AS 3798 except that: » The Contractor is to arrange for testing and for recording of the position and level of the tests. » The soil tester shall select the test sites at random. » The soil tester shall show position and level of tests on their test certificates. Earthworks shall include all operations necessary to excavate materials as required, construct embankments including materials from borrow areas, place selected fill, place backfill for culverts, structures and pipelines unless separately designated, construct drains, remove and replace unsuitable materials, shape and trim the site including drains, all as shown on the Drawings and in the Specification and as may be directed by the Superintendent during construction. The following are definitions of terms referred to in this section of the Specification: Subgrade The in situ material below the underside of the pavement and concrete driveways or fill. Subgrade — Fields The in situ material below the underside of the topsoil later. Imported Fill Material brought onto the site. Where referred to in this Speciftcation, the degree of compaction specified shall be given as a minimum relative compaction being the dry density ratio calculated in accordance with AS 1289. All testing shall relate to Standard Compaction in accordance with AS1289. The existing natural surface levels shown on the drawings or provided otherwise to the Contractor were the levels of the surface at the time of survey and the accuracy of these levels cannot be guaranteed. The Principal will not consider any claim from the Contractor due to such information and calculated quantities proving to be at variance from actual conditions encountered. The Contractor shall be deemed to have taken into account all variances occurring in natural surface levels between surveyed cross sections and surveyed points. 3.4.2 Earthworks Survey Controls Before starting earthworks, the Contractor shall offset any pegged centreline or traverse line with clearly marked and levelled offset pegs, clear of the limits of the earthworks and in addition shall set any other line and/or level pegs as necessary for effective control of earthworks, pavement construction and general formation. 41/2238 2/11840 Girraween Sports Precinct 17 Earthworks Package
Page 109
gp During normal working hours the Contractor shall ensure the continuous presence of a person capable of and responsible for the control of line and level of earthworks. The necessary template and levels shall be kept on the site for the purpose of checking the work during its progress. 3.4.3 Excavation from Cuttings General The cuttings shall be so worked that the best material available, which in the opinion of the Superintendent is suitable material, shall be placed in embankments. Generally all material from cuttings, including drains, which in the opinion of the Superintendent is suitable material, shall be placed in embankments. When material that, in the opinion of the Superintendent, is unsuitable for embankments is encountered in excavation of cuttings and/or the material in the subgrade of the cutting is unsuitable, and/or material from cuttings is in excess of requirements for embankments the material shall be excavated and stockpiled. The Contractor shall be deemed to have satisfied himself as to the full nature of all material to be excavated prior to tendering. No extra payment will be made on account of the nature or condition of the material encountered, other than as may be specifically provided for in the Specification. Batters The sides of cuttings shall be battered and trimmed to a clean and sharp profile, carried around bends in even curves all to lines and slopes as shown on the drawings or as approved by the Superintendent. Any loose rock or material affected by the Contractor's operation which in the opinion of the Superintendent is unstable, shall be trimmed and removed at the Contractor's expense. Undercutting of batter slopes shall not be permitted. Class of Excavation The rate included in the Schedule of Lump Sum Tender shall be deemed to cover excavation in all classes of material irrespective of type and claims will not be considered by the Principal or Superintendent on account of any hard material or rock or any weak material in any excavation. 3.4.4 Construction of Embankments Compaction of material below ground surface under embankments The ground surface shall be compacted to 95% relative dry density (standard compaction) to a depth 150 mm below ground surface. For sand, the ground surface shall be compacted to a density index of not less than 70%. The frequency of testing this compaction shall be at the rate of 1 test per 1,000 m? of surface area. Unsuitable Foundation Material Where in the opinion of the Superintendent the material exposed after stripping on which embankments 41/22382/11840 Girraween Sports Precinct 18 Earthworks Package
Page 110
= are to be constructed is unsuitable, such material shall be removed and replaced by approved fill material. Any soft or saturated areas shall be surface drained. Fill Material Only material approved by the Superintendent shall be used from cuttings in the construction of embankments. Generally the material used shall comply with the following: Maximum particle size 75mm Percentage passing 0.075mm Not greater than 25% Liquid Limit Not greater than 40% Plasticity Index Not greater than 15% For sand material the figures above and do not apply. Sand fill material shall be approved for use by the Superintendent and shall be free of all deleterious material listed below. Borrow pits and cuttings shall be so worked that the best material available, in the opinion of the Superintendent is made to form the upper layers of embankments. All materials used in embankments shall be to the approval of the Superintendent. Materials which are not to be used in embankment construction are vegetable matter, organic clays and silts, ashes, coal or the like, free draining material susceptible to scouring, dispersible clays, material which is unstable when subject to moisture variation. Embankments Filling shall be carried out in uniform horizontal layers of not more than 200 mm of loose material and compacted as specified. For sand material a maximum layer thickness of 300 mm is applicable. Each layer shall be free of ruts before successive layers are placed. During construction the surface of the embankment shall be shaped so that it is kept higher at the edges, sloping towards the centre to permit safe passage of hauling, rolling and other construction equipment as close to the edge as possible and to ensure that the edges are compacted to the same density as the other parts of the embankment. At the close of work each day, the surface shall be shaped to a crown in the centre to ensure that the surface is well drained. During construction, the differential level of adjacent layers across the embankment shall not exceed 600 mm. Where the ground surface on which an embankment is to be constructed has a transverse slope steeper than 1 on 8 a horizontal step not less than 300 mm high shall be cut into the ground surface at the toe of the batter on the low side. Where the ground surface has a transverse slope steeper than 1 on 3 a series of horizontal steps not less than 300 mm high shall be cut into the ground surface covered by the embankment. These steps 41/22382/11840 Girraween Sports Precinct 19 Earthworks Package
Page 111
on shall be continuous longitudinally and continuous transversely. Embankments shall be compacted to 95% relative dry density (standard compaction). Where the material is sand is shall be compacted to a density index of not less than 70%. The frequency of testing of embankments shall be in accordance with Table 8.1 of AS 3798 for large scale operations. 3.4.5 Subgrade Unsuitable Subgrade Material Unsuitable and sensitive materials such as silt and or organic matter shall be removed from subgrades to the extent directed by the Superintendent. Soft clay normally will not be regarded as being unsuitable material. Holes so formed shall be backfilled with selected fill from excavations, or imported select fill material. Payment to the Contractor for the excavating and replacing unsuitable subgrade will be made only for the extent of work agreed to by the Contract Administrator prior to the work being undertaken. Roads As compaction proceeds, the subgrade shall be shaped to the profile required, any making up required being done by the addition of approved material. The surface of the subgrade shall be compacted, trimmed, profiled and check tevelled prior to placing of pavement materials. The alignment of any excavation for the pavement shall be such that the depth of the finished pavement thickness is nowhere less than the dimension shown in the drawings. The surface of the finished subgrade shall be graded to within the tolerance specified below in accordance with the levels of the grade line shown in the drawing, or calculated from data given in the drawings, due allowance being made for the thickness of the pavement required. The Tolerances appropriate to the construction of subgrade and to subgrade replacement material shall comply with the following: » Design Level Tolerance +15 mm /-30 mm » Shape Tolerance of 25 mm maximum deviation from a 3 m straight edge laid in any direction. The crossfall of the surface of the finished subgrade shall be maintained within 12 mm of that shown on the drawings. The subgrade (top 300mm below subgrade level) shall be compacted to 100% relative dry density (standard compaction) to a depth of 150 mm. The frequency of testing to confirm this compaction shall be 1 test per 1,000 square metres of subgrade, with a minimum number of three (3) tests per sample area being tested. Where the subgrade material is sand is shal! be compacted to a density index of not less than 80%. 41/22382/11840 Girraween Sports Precinct 20 Earthworks Package
Page 112
= Playing Fields The playing fields are to be excavated or filled with bulk material as described in section 3.4.2 and 3.4.3 above to a level of 250mm below the finished surface levels. The final 250mm shall be made up from the stockpiled topsoil. If insufficient topsoil is available, the thickness of the topsoil layer shall be modified with agreement of the Superintendent. The final trim for the playing fields is to be completed to ensure the grades shown on the plans are achieved. In addition, the vertical tolerance of setout points shall shown on the plans be +/-15mm. Conforming survey is to be provided to the Superintendent prior to commencement of the playing fields amelioration. The playing fields are to be free of any depressions or humps and shall be free draining. The amelioration of the playing fields cannot commence until the Superintendent has approved the final trim of the surface. 3.4.6 Unpaved Areas Footpaths and other unpaved areas shall be left free from rubbish, stones, felled timber and brush, and left smooth and clean, true to the grade and levels shown on the drawings. The allowable variation on design level at any point shall be 50 mm provided that all areas are free draining and no ponding of water occurs. 3.5 Quality Control Testing The cost of all testing of materials to ensure quality control during construction shall be borne by the Contractor. If processed samples are unsatisfactory, costs of additional necessary testing will also be bome by the Contractor. Testing of subgrade CBR shall be carried out a minimum of 10 working days prior to the placement of sub-base pavement material. The frequency of testing to be carried out shall be the maximum of either one (1) test per 1000 square metres of subgrade, or one (1) test per identifiable soil type with a minimum number of three CBR tests to be carried out for any project. The cost of all subgrade CBR testing shall be borne by the Contractor. 3.6 Utility Services Where any valve, hydrant or other surface fitting of a utility service occurs in the area to be constructed, the Contractor shall ensure it is not damaged by the Contractor's operations. The Contract provides for the Contractor to adjust the levels of cast iron boxes and fittings to suit new footpath levels. Generally all these items are to be left flush with the final footpath levels or 25 mm above non-paved areas at the completion of the Project. 3.7 Erosion and Sediment Control During construction and upon completion of earthworks the Contractor is to undertake erosion and 41/22382/11840 Girraween Sports Precinct 21 Earthworks Package
Page 113
= sediment control measures to the satisfaction of the Superintendent and the Local Council. The Contract documents include a drawing indicating suggested Sediment and Erosion Control measures. Notwithstanding the detail shown on the drawings, the Contractor shall be solely responsible for planning and managing the works to minimise erosion and silt migration from the site. It is expected that control measures will include the following: » Control over surface runoff by: — construction of interception drains to divert runoff from undisturbed areas around the works area: — installation of temporary drains; - early stabilisation of floodways; — use of straw bales, silt fences, swales, contour ploughing or ripping, dozer cleat impressions, spreader banks. » Limitation of movement of equipment and vehicles to: ~ asingle entrance of stabilised construction; — prepared parking areas delineated by temporary fencing. » Minimisation of the area exposed by: — staging of clearing operations; — progressive stabilisation of the works as completed; = provision of temporary grassing; - contour ploughing to disturbed areas. » Construction of sediment control measures such as: - sediment retention ponds; — sediment basins; — sediment traps; - silt fences; - buffer zones. Where the control measures include sediment retention ponds: » the ponds shall be kept empty of water for the longest possible duration; » the Contractor shall remove and dispose of accumulated materials from the ponds as often as is necessary to maintain their interception capacity at least at 90% of the design volume of the pond. Specific erosion control measures shall include the following: Protection of road formations Road formations shail be protected from the effects of erosion and deposition. Earthworks shall be graded to drain without ponding at all stages. Where runoff must cross the formation, the Contractor shall ensure that the stream is a broad sheet flow that crosses roughly perpendicular to the alignment 41/22382/11840 Girraween Sports Precinct 22 Earthworks Package
Page 114
= and minimises the likelihood of subgrade softening. Stockpiles Where locations are not otherwise nominated in the Contract, stockpiles shall be placed to minimise effects on site and adjacent areas. Stockpiles shall be clear of natural drainage lines, and temporary drainage shall be provided where necessary. Protection of Completed Earthworks In areas where earthworks, including open drains, have been completed and no further treatment is specified other than topsoiling and grassing or hydroseeding, then such topsoiling and grassing or hydroseeding shall be carried out at the earliest practicable date. In no case shall earthworks be left unprotected for more than 28 days after formation. Reinstatement Any temporary drains or drainage structures shall be removed when no longer required. The sediment and erosion control measures are required to be provided, operated, maintained and replaced by the Contractor as necessary, until issue of the Final Certificate. All costs incurred by the Contractor as a result of complying with requirements for installation of erosion and sediment control measures shall be borne by the Contractor. The cost of such works shall be deemed to be included in the Contractor's Tendered Lump Sum and no extra payment will be made for these works. 41/22382/11840 Girraween Sports Precinct 23 Earthworks Package
Page 115
= 4, Pavements 4.1 Gravel Pavements 4.1.1 Materials Pavement materials shall be of uniform approved quality and may be rejected if they contain quantities of earth, clay or vegetable matter that, in the opinion of the Superintendent, render them unsuitable. The quality and thickness shown or ordered for each course shall be the minimum allowable thickness for that particular course. Pavement materials shall conform to the Local Council specification requirements as follows: Base Queensland Department of Main Roads Type 2.1 Sub base Queensland Department of Main Roads Type 2.3 The Contractor shall submit test certificates for the paving materials he proposes to use and the materials shall be approved by the Superintendent before paving is commenced. 4.1.2 Compaction of Pavements Paving materials shall be compacted at a suitable moisture content to a density that shall be not less than 100% relative dry density (standard compaction). Rolling shall start at the edges and finish at the centre of the pavement and successive passes shall overlap. Rolling of each layer shall continue until the specified compaction is obtained. Paving shall be compacted in layers of not less than 75mm and not more than 200mm compacted thickness. After compaction of the pavement the whole of the surface shall be watered then rolled with a steel wheel roller to give a hard, dense, tightly locked, stone mosaic surface that is free of lenses, compaction planes and caking. For pavement, the following geometric tolerances will apply: Course Design Primary Layer Thickness Level Tolerance Tolerance Subbase +20mm + 40mm - 20mm - 20mm Base +10mm +15mm -10mm - 15mm 4122382111840 Girraween Sports Precinct 24 Earthworks Package
Page 116
S oe Additional Tolerances » The deviation from a 3m long straight edge placed anywhere on the surface of the base layer shall not exceed 25mm for subbase and 15mm for base layer. Transverse to the centre line and between any two points more than 2m apart, the crossfall shall not depart from the crossfall shown in the documents by more than 0.5% absolute. 4.1.3 Final Trim Following placement and compaction of the base course material, the whole of the surface of the base course shall be final graded and trimmed to the specified tolerances so as to leave a hard, dense, tightly packed surface free of lenses, compaction planes and caking. Asphaltic concrete surfacing shall not be commenced until the profile, surface, compaction, quality and finish of the pavement have been inspected and confirmed satisfactory. 4.1.4 Quality Control Testing The cost of all testing of materials to ensure quality control during construction shall be borne by the Contractor. If processed samples are unsatisfactory, cost of additional necessary testing will also be bome by the Contractor. The Contractor shall comply with the Quality Assurance requirements as specified herein. » Pavement Quality Tests as follows: ~ Gradings, Atterbergs and Soaked CBRs (for each pavement course, 1 test for each 400m of material); - Tests to determine properties in accordance with Local Council specification (for each pavement course 1 test for each source of material supplied). » Pavement Compaction Tests: — Test each pavement course layer at the rate of 1 test per 1,000m? with a minimum of three (3) tests per sample area. » Pavement Geometric Tolerances: — Primary Level (along centreline at every chainage cross section given in plans or every 25m, whichever is lesser of the two); — Straight Edge Deviation (left and right hand side at every chainage cross section given in plans or every 25m, whichever is the lesser of the two). - Crossfall (ss above). 4.2 Subsoil Drains 4.2.1 Construction Subsoil drainage shall be constructed in accordance with the construction drawings provided. 41/22382/11840 Girraween Sports Precinct 25 Earthworks Package
Page 117
= Subsoil drains of the type specified or as directed by the Superintendent shail be installed at same grade as kerb and channel. Unless specified otherwise, subsoil drainage trenches shall incorporate geotextile material lining the trench. in areas where the natural soil could cause blockage of the geotextile material and the ultimate failure of the Pavement Subsoil Drainage system, the Superintendent may advise the following if applicable: » Whether the trench shall incorporate geotextile material. » What type of alternative subsoil drainage backfill material (in accordance with this specification) shall be used. » Whether the spacing of the subsoil drainage clean out points can be decreased from the specified requirements. Subsoil Drainage clean outs shall be constructed in accordance with the construction drawings provided, and shall preferably be located with the upstream flushing point internally within a stormwater gully pit or manhole. The maximum spacing of subsoil drainage clean outs shall be not greater than 50 metres apart. No construction equipment shall stand or travel! directly on subsoil drain material or constructed drains without approval. Payment shall be made at the rate shown in the Schedule for the actual length installed. Minimum cover for various compacters over the drain shall be unless approved otherwise: Hand Held Units - 100 mm Units <15 Tonnes - 200 mm Units >15 Tonnes - 300 mm 4.2.2 Material Requirements Trench backfill material shall be crushed or granular material that conforms to the grading requirements shown below: AS Sieve Size (mm) | Percentage Passing by Mass 19.0 85-100 9.5 0-20 4.75 0-5 1.18 : 0.30 - 0.15 - 41/22382/11840 Girraween Sports Precinct 26 Earthworks Package
Page 118
las Sieve Size (mm) Percentage Passing by, Massii, 0.075 0-2 Column 1 backfill material may be used in trenches either incorporating geotextile material or not incorporating geotextile material. This material is consistent with the requirements for a 20mm concrete aggregate in accordance with AS 2758.1 Drainage pipes and associated fittings and jointing procedures shall comply with the requirements specified in the following reference: » Plastic pipes (Perforated) : AS 2439-Part 1 ‘Perforated Drainage Pipe and Associated Fittings’ Perforations shall not exceed 0.7mm diameter or width. 4.2.3 Subsoil Drainage Geotextile Material Geotextile material used in subsoil drains shall be a non-woven type and shall have the following properties prior to exposure to sunlight at the site. » Geotextile strength rating (G) of greater than 900 » Flowrate under 100 mm constant head as determined using the Permittivity Test procedures stated in AS 3706.9 of greater than 50 Um?*s. » Equivalent opening size (EOS) of the geotextite as determined using the procedures stated in AS 3706.7 of less than 200 micro metres for granular soils (i.e., D50s greater than 75 micro metres) and the EOS of less than 85 micro metres for cohesive soils (i.e., D50s less than 75 micro metres). 41/22382/11840 Girraween Sports Precinct 27 Earthworks Package
Page 119
or 5. Stormwater Drainage 5.1 Culverts and Pipework Gully pits, pipe ends and grates shall comply with the requirements of the drawings and the standards of the Local Authority and IPWEAQ. Reinforced concrete pipes shall be of the class and joint type as shown on drawings. All pipes shall be supplied and delivered in accordance with the requirements of AS 4058. Installation shall conform to the requirements of AS 3725. Fibre reinforced concrete pipes may be considered an alternative and shall conform to the AS 4139. Pipes of the same diameter and class can be used in lieu of Reinforced Concrete Pipes. Where rubber ting joints are specified the ‘V’ section rubber ring shall be used and is to be jointed using the manufacturer's lubricant. Installation of FRC pipes shall be in strict accordance with the Manufacturer's specifications. Reinforced Concrete Box Culverts shall be of the ‘Inverted U’ type unless specified otherwise and shall confomn in all respects to the current edition of AS 1597. 5.2 Excavation The trench width for both trench condition and embankment condition shall be as shown on the drawings. For an embankment installation, the positive projection of the pipe shall be 0.9 times the pipe outside diameter, or less. Where the projection of the pipe above natural ground surface is greater than 0.9 times pipe outside diameter, it will be necessary to construct the embankment to a height above top of bed level at least equal to 0.1 times pipe outside diameter, prior to laying the pipe, and to a width equa! to at least of 1.0 times pipe nominal diameter on each side of the pipeline trench wall. The embankment shall be constructed in accordance with the specification for earthworks. A trench is then to be cut through the constructed embankment. The required trench for the installation, to the width and depth shown on the drawings, shall be excavated centrally through the above compacted select fill material. Excavation shall be to line and level shown on the drawings, to provide for a pipe bed zone, for the following trench width and thickness:- » 100mm for pipe nominal diameter < 1 500mm » 150mm for pipe nominal diameter > 1 500mm Should the excavation to the required foundation at the bottom of the bed evel reveal material, which in the opinion of the Superintendent is unsuitable, the trench shall be over-excavated to a depth required to remove the unsuitable material and refilled with compacted material conforming to the requirements for the Bed Zone. 41/22382/11840 Girraween Sports Precinct 28 Earthworks Package
Page 120
= At all times the requirements of the Workplace Health and Safety Act shall be complied with and all works shall be made safe during the performance of such activities. During construction all care should be taken to ensure any water that may interfere with the progress of the works shall be diverted to keep the trenches and excavations free from water so as to prevent any damage to the works due to flooding or other causes. The necessary pumping items shall be kept on hand to ensure the excavation is constantly dewatered during the progress of the works. 5.3 Bedding Pipes are to be bedded in 5-10mm crushed rock screenings. Bedding material shall be placed as detailed on the design drawings and/or in accordance with Local Authority Standards. Where soft unstable foundation material is excavated below the invert, backfill material shail consist of gravel, crushed stone or other suitable material. All material directly in contact with the pipe shall be within a pH range 4-9 and have a resistivity greater than 500 ohm cms. Select fill may be cement stabilised. Details of the proposed stabilised material shall be approved by the Superintendent prior to installation. The Bed Zone shall be placed to the final required thickness. The bed material shall extend over the full width of the trench and shall be compacted by tamping, rolling and/or vibration to a minimum Density Index (Dl) of 50. Compaction achieved shall be monitored by field testing as directed by the Superintendent. The bed leve! shall be graded to provide for a uniform fall to the discharging end of the pipeline, with line and leve! as shown on the drawings. For pipes with sockets protruding beyond the barrel outside surface, chases shall be dug into the bed and foundation if necessary, in the appropriate positions, so that each pipe is supported along the full length of the barrel and the socket is not subjected to point loading. 5.4 Laying and Jointing of Pipes 5.4.1 Concrete and Fibre Reinforced Concrete Pipes Pipe laying shall begin at the downstream end of the line with the socket or grooved end of the pipe facing upstream. When the pipes are laid, the barrel of each pipe shall be in contact with the bedding material throughout its full length. External joints shall be taped with the manufacturer's supplied tape or rubber external sand bands upon final bedding and alignment. Lifting holes in pipes shall be plugged with 3:1 sand cement mortar, precast tapered concrete plugs, tape 41/22382/11840 Girraween Sports Precinct 29 Earthworks Package
Page 121
= surrounded, or other approved means prior to backfill material being placed. Joints shall not be made under water. The trench must be dewatered to facilitate joint making and inspection. Precautions must be taken to prevent erosion of joint material by moving currents of water. Drainage lines shall be constructed with a tolerance of 10mm in line or level over any section 30m in length (providing each pipe unit has a fall in the direction of flow) from the alignment and levels shown on the drawings. All concrete used in drainage works shall, unless otherwise specified or shown on the drawings, be Class N25 concrete in accordance with AS 3600. §.4.2 Reinforced Concrete Box Culverts The base of the box culvert shall be laid true to line and grade before the upper U Portion of the box culvert segments are laid. All construction methods, tolerances and requirements for box culverts shall conform to the requirements detailed in Queensland Transport Standard Specification MRS 11.03. 5.5 Backfilling 5.5.1 Backfill Unless shown otherwise in the construction drawings, backfill material shall generally be selected fill material, not markedly different in character from the surrounding soil and free from large stones, lumps of clay, topsoil, tree roots and other rubbish. It shall have an even grading free of lumps retained on a 75mm sieve and free of stones retained on a 25mm sieve. §.5.2 Concrete and Fibre Reinforced Pipes Backfilling requires great care, and lack of attention to its selection, placement and compaction may lead to damage to a new pipeline or to other underground services adjacent to the pipeline or to neighbouring structures. The trench should be backfilled as soon as possible after pipes are laid. Compaction standards for Backfill material shall conform to the following requirements. The level of compaction required shall be as follows: Note: Compaction requirements are with reference to the relevant Test Methods contained in AS 1289. For trench installations, mechanical compacters shall be used. Where impact tampers are used, caution must be exercised not to allow a direct blow on the pipe. The material should be compacted at near optimum moisture content and should be brought up evenly in layers not exceeding 150mm on both sides of the pipe up to 150mm over the pipe. It should not be bulldozed into the trench nor dropped directly on the pipe. Heavy mechanical equipment must not be used for tamping of backfill or be permitted to run over 41/22382/11840 Glirraween Sports Precinct 30 Earthworks Package
Page 122
(2) pipelines at shallow depths except at prepared crossing places and where approved. For normal trench conditions the remainder of the trench shall be refilled to natural surface level with ordinary fill material. It shall be placed evenly in 150mm to 300mm layers, and be tamped thoroughly. The backfilling should be completed as soon as possible after pipe laying, and before the pipeline is charged with water. This will avoid the risk of pipes floating if the trench becomes flooded. Testing to confirm that the backfill has been compacted shall be carried out at the rate of at least 1 test per 100 metres length of trench. Refilling of sheeted trenches shall be carried out to the following requirements: » No struts, waling or other supports shall be removed until the top of compacted refilling has reached the level of these supports. » No wall sheeting is to be totally removed from the trench until the level of the compacted refill is within 150mm of the surface. » No wall sheeting is to be removed, in dewatered trenches, until the level in water table between natural ground and natural refill material is less than 500mm. » The wall sheeting is to be withdrawn or removed in such a manner that the pipe and compacted bed and haunch support are not disturbed during such withdrawal or removal. 5.6 Intet Drains, Outlet Drains and Open Unlined Drains Inlet and outlet drains and open unlined drains shall be formed for such lengths, widths, depths and gradients as will ensure complete drainage, where shown on the drawings. Catch drains to field inlets shall be constructed to the detail and in the locations shown on the drawings and as directed by the Superintendent. The Superintendent may approve slight variations in alignment where necessary to avoid natural obstacles such as large trees. 5.7 Concrete Kerbs and Kerb and Channel The profites of the kerbs and kerb and channel shall comply with the details shown on the drawings. The concrete kerbs and kerb and channel shall be laid on the compacted subbase gravel true to line and tevels shown on the drawings. Subbase gravel pavement under the kerb and channel! shall be no less than 100mm compacted thickness or as shown on the drawings. The concrete used shall be Class N32 and its manufacture and placement shall comply with the requirements of AS 1379 — Ready-mixed Concrete. Where a kerb and channel machine is used, the maximum slump shall be 20mm and additional fines may be needed to produce a satisfactory result. Kerbs and kerb and channel shall be constructed by means of an approved concrete extrusion machine. Shortly after placing with the machine, the kerbs and kerb and channel shall be neatly grooved at 3m intervals around the exposed faces of concrete. The groove shall be made with a trowel or similar tool to a depth of 40mm into the newly laid concrete. The groove shall be perpendicular to the line of the kerb 41/22382/11840 Girraween Sports Precinct 31 Earthworks Package
Page 123
= over the whole of its length and shall not be more than 6mm wide. Kerbs and kerb and channel shall be laid so that the surface does not vary more than 10mm from the line and level shown on the drawings and any irregularities shall not vary more than 10mm from the bottom edge of a 3m straight edge, due allowance being made for any specified vertical curvature. Also the difference between the deviations from correct levels at any two points 30m apart shall not exceed 30mm. Kerb and channelling damaged during any phase of the work shall be removed from the site by the Contractor at his own expense. The actual sections of damaged kerb and channel to be removed will be indicated by the Superintendent. The Contractor shall replace all damaged sections with new kerb and channel of matching profile at his own expense, all work being to the satisfaction of the Superintendent. 5.8 Reinforced Concrete Materials and construction requirements shall conform to AS 3600. 5.9 Stone Pitching Stone pitching shall be !aid where shown on the drawings or where directed by the Superintendent and shall be composed of sound igneous, metamorphic or approved sedimentary rock which will not disintegrate in water. The stone shall be not less than 0.015m° and generally no dimensions shall be less than 200mm but, where the superficial area of the stone is 1 000cm’ or greater, the depth may be reduced to 150mm. The stones shall be properly bedded to even planes on a bed of mortar of 25mm minimum thickness and wedged together with broken rock and shall be grouted with cement mortar. Stones shall be placed so as to form irregular joints. All stone shall be interlocked and wedged with smaller size rock as necessary, so that no single rock may be easily dislodged and no large voids remain between rocks. All stone pitched faces must be stable prior to grouting with mortar. The mortar shall consist of 1 part of Portland cement to 3 parts of approved sand by volume. Materials shall be as specified in the attached drawings. The mortar shall be applied by means of a trowel and shall be worked between the stones so that the interstices are completely filled. The grouted stone must be shaded and kept damp for at least 48 hours. After the mortar has set, if any stones are not firmly held in position, the mortar shall be removed around such loose stones and the area regrouted. Rock surfaces shall be cleaned free of any coating of cement mortar exposing the faces of the rock. The area of cement grouted stone pitching for the purposes of payment shall be taken to be the net exposed or upper surface area and payment will be made at the Schedule rate only for the quantity which is actually ordered by the Superintendent and laid. 41/22382/11840 Girraween Sports Precinct 32 Earthworks Package
Page 124
= 5.10 Manholes and Kerb Inlet/Gully Pits Kerb inlet pits shall be built to accommodate pipes as shown on the drawings and standard drawings. Concrete shall be Class N25. Manhole step irons shall be made to the pattern shown on the drawings. After fabrication they shall be hot dip galvanised. The joints between gullies/manholes and pipes shall be made watertight using cement mortar. The mortar shail be used within one hour of mixing and shall not be retempered. The joints shall be finished to provide smooth surfaces, uniform with the inner surfaces of the structure. Concrete benching shall be shaped to the shapes specified and shall have smooth, even surfaces and neat edges. Step irons shall be installed horizontal, vertically in line, and shall project uniformly from the walls, where the depth of the structure is greater than 1.5m. Where step irons are not cast-in-place, they shall be epoxy mortared into drilled holes. The joints between the step irons and the walls shall be completely filled so that the step irons are held rigid and the joints are watertight. Manhole covers and frames shall be of the best grade cast iron, sound without twists and free from sand, air holes, blisters, flaws or other defects to the dimensions shown on the drawings. They shall seat evenly all around the frame without any tendency to pinch or pivot about a point. Grates for pits shall be supplied and installed as shown on the drawings. Temporary inlet pits shall be provided with adequate barriers to satisfy the Workplace Health and Safety Act. Concrete top slabs in Manholes shall be jointed to the walls using cement mortar or epoxy mortar. The opening in the top slab shall be closed with temporary covers, after which excavations shall be backfilled. Cast in situ concrete surrounds shall be constructed on the top slabs to encase the frames. Alternatively, precast concrete surrounds may be employed, using epoxy mortared joints. Temporary covers to Gullies and Manholes may remain in position and installation of the frames and surrounds deferred until pavement construction has reached a stage where the frames and surrounds can be positioned accurately. Where construction is in a staged format, the joint between each pour shall be suitably roughened to ensure an adequate bind and seal is achieved between the successive concrete pours. §.10.1 Field Inlets Field inlets of types scheduled shall be constructed to the details shown on the standard drawings. Temporary inlet pits shall be provided with ‘childproof’ grates and adequate barrier fencing. 5.11 Headwalls, Wingwalls and Aprons 5.11.1 Precast Concrete Units Precast concrete units shall be proprietary products manufactured by a recognised, quality assured 41/22382/11840 Girraween Sports Precinct 33 Earthworks Package
Page 125
= company. The units are to be delivered and installed undamaged in accordance with the manufacturer's recommendations and as shown on the design drawings. §.11.2 Cast In Situ Where necessary, localised excavations shall be carried out to allow construction of cast in situ end structures. Cast in situ endwalls, wingwalls and aprons shall be constructed to the dimensions and other requirements shown on the Design Drawings. Concrete work shall comply with the requirements specified in Section 6 - Concrete Work. Construction of endwalls and wingwalls shall include the construction of integral cutoff walls, where required. 5.12 Gross Pollutant Traps Gross pollutant traps are to be built according to the manufacturer’s specifications and are to meet Australian and New Zealand Environment Conservation Council (ANZECC) guidelines. The gross pollutant traps shall be built to accommodate pipes and pipe grades as shown on the drawings. Gross pollutant traps shall comply with the following technical requirements: Capture of gross pollutant > 3mm 98% Capture of gross pollutant > 0.211mm 98% Collection of free oil and grease at design flow 97% Treatable flow rate for structure E7/2 0.299m*/s (1 in 20 year event) Treatable flow rate for structure E7/5 0.182m*/s (1 in 20 year event) 5.13 Geometric Tolerances The tolerances for the construction of Stormwater Drainage Works shall comply with the following: Invert Levels + 10mm - 10mm Surface Levels + 50mm - 50mm Structure Locations within 100mm of design on the site within 50mm of design longitudinally along roadway within 10mm of design at right angles to road centreline Crest and Spillways of Detention Basins | shall be trimmed to + 10mm, - 10mm of design 41/22382/11840 Girraween Sports Precinct 34 Earthworks Package
Page 126
6. Concrete Work 6.1 Materials and Construction Requirements Materials and construction requirements for concrete shall be in accordance with Section 19 of Australian Standard AS 3600. Materials used for concrete work shall comply with Australian Standards listed in Clause 19.1 of AS 3600. All concrete used in this contract shall be manufactured in accordance with AS 1379. All concrete to be incorporated in the works shall be sourced from a quality assured Readymix Concrete Supplier. Concrete materials shall be proportioned so that when manufactured in accordance with AS 1379 and transported, placed, compacted, finished and cured in accordance with AS 3600 and this Specification, the hardened concrete will satisfy the design requirements for strength, serviceability and durability. Type GP cement shall be used. A manufacturer's certificate in the form of a delivery docket in accordance with AS 1379 shall be supplied for each batch and shall be retained by the Contractor. Such certificates shall be held and maintained in the Contractors quality records for the project. Further, the Contractor shall obtain a statement from the manufacturer qualifying the quality standard of the concrete in accordance with the requirements as specified herein. No admixtures shall be used without the written approval of the Superintendent. The Contractor shall submit full details of the mix proportions intended to be used for this contract. The Contractor shall advise the Superintendent of the name of his intended concrete supplier for the Superintendent's review and approval, if acceptable. The Contractor shall advise whether his concrete supplier's manufacturing plant complies with AS 3600, in regard to production of standard strength grades of concrete. All aggregates shall comply with the requirements of AS 2758.1 "Concrete Aggregates". 6.2 Concrete Strength Criteria All concrete work is specified as normal class concrete or special class as shown on the Notes on the drawings. 6.3 Rejection of Concrete The provisions of Clause 19.1.7 of AS 3600 shall be read in full as part of this specification. 6.4 Testing and Assessment for Compliance of Concrete Specified by Compressive Strength All concrete shall be subject to production assessment in accordance with AS 3600 Section 19. Prior to the commencement of concrete work, the Contractor shall advise which procedure is to be used for 41122382/11840 Girraween Sports Precinct 35 Earthworks Package
Page 127
= production assessment in accordance with Section 19 of AS 3600 and submit satisfactory evidence that the qualifications for a controlled strength grade have been met, if appropriate. All concrete shall also be subject to project assessment of strength in accordance with Section 19 of AS 3600. The frequency of sampling shall not be less than the following: Size of concrete pour No. of samples 0-5m° 1 5-10m° 2 10 - 25m? 3 Greater than 25 m? 3 for the first 25 m* plus 1 for each additional 25 m°. Note that two (2) test cylinders are required from each sample. 6.5 Costs for all Testing The Contractor shall be responsible for the performance of all tests and shall meet the cost of all testing associated with the concrete work for all classes of concrete specified including normal and special grades. All testing shall be carried out in a laboratory registered by NATA and test certificates shall be issued to the Superintendent within two (2) working days after test results have been received from the testing authority. In particular this refers to the compression testing of concrete specimens. Testing for consistency of concrete by the slump test shall be performed on site on every batch of concrete delivered to the site. The target slump for all concrete shall be 70-90 mm unless specified otherwise in this specification. The slump tests shall be performed by a person approved by the Superintendent and competent to perform these tasks in accordance with the Australian Standard method. All costs are the responsibility of the Contractor. All concrete slump tests shall be recorded in a "Concrete Records book" kept on site by the Contractor. 6.6 Reinforcement The material and construction requirements for reinforcing steel shall be in accordance with Clause 19.2 of AS 3600. The Contractor shall be responsible to ensure that reinforcement is placed and held in position during a concreting operation. The tolerance on position of reinforcement shall comply with Clause 19.5.3 of AS 3600. Reinforcement shall be 500N grade to AS4671. If reinforcing is in storage on the site, it shall be covered to protect it from the weather and shall be stored off the ground. 6.7 Handling and Placing of Concrete No concrete shall be placed in water without the permission of the Superintendent. Before placing any concrete, all debris of any description shall be removed from the spaces to be occupied by the concrete, all reinforcement and the surfaces of the forms shall be cleaned and the forms 41/22382/11840 Girraween Sports Precinct 36 Earthworks Package
Page 128
shall be thoroughly wetted. When concreting is scheduled in exposed, hot locations, such wetting shall continue until the temperature of reinforcement and forms is not higher than 32°C. No concrete shall be placed until the positioning and fastening of the reinforcement, forms and supports, or the foundation as the case may be, have been inspected and approved by the Superintendent. Any flow of water into an excavation shall be diverted through proper side drains to a sump, or be removed by other approved methods that will avoid washing the freshly deposited concrete. If directed by the Superintendent, water vent pipes and drains shall be filled by grouting or otherwise after the concrete has thoroughly hardened. Concrete shall be handled from the mixer to the place of final deposit as rapidly as practicable by methods that prevent the separation or loss of ingredients. Mixing and transporting equipment shall be free from hardened concrete and foreign materials on the inner surface. The concrete shall be deposited in the form as near as practicable in its final position to avoid rehandling. It shall be so deposited as to maintain, until the completion of the unit, a surface approximately horizontal. The depositing of large quantities of concrete at any one point and running or working it along the forms will not be allowed. Concrete shall be gently placed in position and shall not be poured from a height greater than 1.2 m into the forms unless suitable chutes approved by the Superintendent are provided. Such chutes shall be of metal, or metal-lined, and the angle and shape of the chutes shall allow the concrete to flow without separation of the ingredients. Chutes must be properly baffled or hooded at the discharging end to prevent separation of the aggregates. The delivery end of the chute shall be as close as possible to the point of deposit. The chute shall be thoroughly flushed with water before and after each run, the water used for this purpose being discharged outside the forms. Concrete shall be deposited continuously and as rapidly as practicable until the unit of operations approved by the Superintendent is completed. Any concrete which has taken its initial set shall be tejected and under no circumstances shail concrete remain longer than 60 minutes after mixing before being used. Concrete that has partly set shall not be used and retempering or the addition of more water will not be permitted after concrete has left the mixer or mixing board. Concrete shall not be placed if the ambient air temperature is likely to be greater than 45°C during placement or within two (2) hours subsequent to placement. If the ambient air temperature measured at the point of placement is likely to exceed 35°C during placing and finishing operations, the Contractor shall take practical precautions to ensure that the concrete can be placed and finished without defects, otherwise it shall be rejected. Typical precautions include those listed below. 4. At the Concrete Manufacturing Plant » Shading aggregate stockpiles; » Painting water tanks white; » Insulating or burying delivery lines; 41/22382/11840 Girraween Sports Precinct 37 Earthworks Package
Page 129
= Adding crushed ice to replace mixing water (in part) or chilling the water; Injection of liquid nitrogen into the mixer. 2. At the Site » Cooling the formwork by dampening with water sprays; » Shading the work areas; » Erecting wind breaks; » Minimising the time for placing and finishing; » Use of evaporation retarding curing oil. Special attention shall be paid to providing early curing for hot weather concreting operations. The concrete shall have a temperature not higher than 35°C when placed, which shall be achieved by using the above precautions if necessary. 6.8 Compacting of Concrete Concrete during placing shall be thoroughly compacted using immersion vibrators of approved type and such spading tools or measures as necessary to ensure the elimination of segregation and voids and to compact the concrete around the reinforcement and into the corners of the forms. The Contractor shall keep in hand on site one spare vibrator for emergency use. Depth and rate of placement of concrete shall be such that preceding layers shall remain in a soft and plastic state when covered by each succeeding lift or layer. Vibration and other compaction measures shall extend through full depth of each layer of fresh concrete and into the preceding layer to completely compact successive batches and merge them with each other. The vibrator shall not be allowed to penetrate into partially hardened concrete or to disturb reinforcement. Vibration shall not continue for more than 30 seconds in one position. If pools of grout, water or laitance form readily during vibration the concrete mixture shall be modified as ordered by the Superintendent. 6.9 Construction Joints Construction joints shall be made where shown on the drawings or in locations approved by the Superintendent. In general, concrete pours shall be made in as large a section as possible to minimise the number of construction joints required. Where stoppage of concreting operations occurs for any treason, construction joints shall be placed either horizontally or vertically as needed, provided with keys to resist shear, and dowels to develop bond as directed by the Superintendent. All reinforcement shall continue through construction joints. Before depositing new concrete against concrete which has hardened, the forms shall be re-tightened and the surface of the old concrete shall have all loose projecting aggregate, laitance, and other objectionable substances removed, shall be roughened by scabbling or other suitable means as required by the Superintendent, and shall be thoroughly washed and saturated with clean water. After excess 41/22382/11840 Girraween Sports Precinct 38 Earthworks Package
Page 130
fl. water has been removed, a layer of cement mortar of similar composition to that embodied in the new concrete, excluding the large aggregate and of plastic consistency, about 12 mm in thickness shall be thoroughly broomed and brushed over the prepared surface and worked into all crevices and depressions after which the new concrete shall be placed immediately so as to make a thoroughly bonded and watertight joint. 6.10 Formwork Formwork shall be in accordance with SAA Formwork Code AS 3610. The Contractor shall supply, erect and maintain in good condition all forms necessary for shaping the concrete. All plans of forms and falsework must be submitted to the Superintendent for approval before their construction is undertaken. All forms must be approved by the Superintendent before concrete is placed and forms found unsatisfactory in any respect shall not be used. Notwithstanding the approval of forms and falsework by the Superintendent, the Contractor shail bear full responsibility for the safety of all forms and falsework, and for carrying out the work in full accordance with the drawings and this specification. All forms shall be constructed of wood or metal and shall be built mortar-tight and of sufficient rigidity to prevent distortion due to the pressure of the concrete and other forces incidental to the construction operations. Forms shall be constructed and maintained so as to prevent warping and the opening of joints due to shrinkage of the timber. All timber used in the manufacture of the forms must be approved by the Superintendent, and where timber is used for formwork for exposed surfaces, the forms shall be made of dressed timber of uniform thickness. The forms shall be substantial and unyielding and shall be so designed that the finished concrete will confom to the shape, lines and dimensions as called for on the drawings. All exposed concrete edges shall have a 20 mm chamfer unless otherwise indicated and this shall be obtained by the use of angle fillets in the angles of the forms. Exposed re-entrant corners shall have a 20 mm fillet unless otherwise indicated. The inside of forms shall be coated with non-staining mineral oil or other approved material which shall be applied before the reinforcement is placed. The method for holding forms in position shall be approved by the Superintendent. Any bolts supporting forms shall be so greased and arranged that they may be removed from the concrete after removal of forms without excessive jarring or hammering and without injury to the concrete surfaces by spalling or otherwise. When the bolts have been withdrawn, the holes shall be filled with cement mortar and well rammed into position. Tie wires passing through the concrete will not be permitted. Where bolts or rods acting as internal ties are to be left in position, they shall be so arranged that when the forms are removed no metal shall be within the clear cover requirements of any surface. Resulting cavities shall be packed with cement mortar. 41/22382/11840 Girraween Sports Precinct 39 Earthworks Package
Page 131
= Forms may be used repeatedly provided they are maintained in a serviceable condition and are thoroughly cleaned and re-oiled before being re-used. The removal of forms shall not be commenced until the concrete has attained the necessary strength to support its own mass and any construction live loads. Uniess otherwise specified, forms and falsework shall remain in position until the times stated below have elapsed after completion of concreting. » Non structural concrete: — Until such time as the concrete has reached 50% of the characteristic 28 day strength or a period of 3 days, whichever is the lesser. » Structural concrete: Soffits of slabs, headstock and diaphragms — Until such time as the concrete has reached 70% of the characteristic 28 day strength of 7 days, whichever is the lesser. Side forms on structural concrete - 3days minimum. Forms shall be removed with a minimum of hammering, !evering or wedging. Forms of vertical walls and foundations may be stripped forty-eight (48) hours after placing of the concrete unless otherwise required by the Superintendent, but no force of any kind shall be applied to the concrete for seven (7) days after the placing of the concrete. Forms for horizontal slabs shall not be removed for a minimum of seven (7) days after pouring. Loosening of forms in preparation for stripping shall in no case be commenced prior to the elapse of the appropriate minimum period as specified above. 6.11 Curing of Concrete All concrete surfaces, when not protected by forms or approved membrane curing compounds, must be kept constantly wet for a period of not less than seven (7) days after concrete is placed. If wooden forms are left in place they shall be wet at all times during the curing period. Wet curing of vertical surfaces of concrete after removal of forms may be accomplished by covering with hessian kept continuously wet. Horizontal surfaces may be wet cured by the same methods or by covering with a layer of sand or sawdust kept continuously wet, or by ponded water. Membrane curing may be substituted for wet curing when approved by the Superintendent. Membrane curing compound shall not be applied to the surface of construction joints or bearing areas where concrete or grout is subsequently to be placed. Only approved non-staining liquid membrane-forming compounds are to be used. The compound shall be applied in strict accordance with the manufacturer's specification and shall be sprayed on as soon as the surface water has disappeared. 41/22382/11840 Girraween Sports Precinct 40 Earthworks Package
Page 132
= The compound shall be applied by spraying with pressure tank equipment having provision for continual agitation of contents during application. Where forms are removed during the curing period the exposed concrete shall be lightly sprayed with water and such moistening continued until the surface will not readily absorb more water, and as soon as the moisture film has disappeared the curing compound shall be applied to the concrete surface. 6.12 Surface Finish All concrete surfaces shall be true and free from stone pockets, depressions or projections beyond the surface. All arrises shall be perfectly sharp and true and all mouldings evenly mitred. Care shall be exercised in removing forms to ensure this result. As soon as the forms are removed, all rough places, holes and porous spots shall be repaired by removing defective work and filling with stiff cement mortar having the same proportions of cement and sand as was used in the concrete, and brought to an even finish. Bolts shall be removed and the cavities filled as described in Clause “ Formwork” Concrete surfaces shall comply with the following classes set out in Australian Standard AS 1510 Part 1. Contro! of Concrete Surfaces - Formwork or as required below. » Formed exposed surfaces - Class 2 » Formed backfilled surfaces - Class 5 » Top Surfaces - steel trowel For Class 2 surfaces blow holes greater than 12 mm are not permitted. All exposed surfaces shall be even and true to shape, free from mortar fins, form marks or other irregularities. All Class 2 surfaces shall be protected from staining due to mortar runs or splashing, reinforcement exposure, timber or curing processes. Any Class 2 surfaces not complying with this standard are to be brought to a smooth even textured finish by bag rubbing and grinding as required. Any staining to surfaces exposed to view shall be removed by rubbing with a carborundum block and water until a uniform textured surface is achieved. The paste formed in the process is to be rubbed off after drying with a dry hessian or canvas. Plastering and mortar capping to concrete will not be permitted. 41/2238 2/11840 Girraween Sports Precinct 41 Earthworks Package
Page 133
= 7. Topsoiling and Grassing 7.1 General The Contractor shall topsoil and grass all bare areas remaining within the area affected by earthworks as detailed in the drawings. This shall include cuts, fills, batters and drainage works. The tendered sum shall include all operations necessary to produce grass cover in accordance with this specification. Grass seeding shall be carried out to all of the topsoiled areas unless noted otherwise. The Contractor shall be responsible for maintenance of the areas grassed until (a) the end of the Defects Liability Period; or (b) handover of playing fields to Council. Maintenance of the grassed areas shall include mowing, watering as necessary, and top-dressing where required to ensure an even grass surface. 7.2 Topsoil Operations 7.2.1 Topsoil Treatment Generally, topsoil for use on the Site shall be obtained by stripping the original topsoil from those areas affected by earthworks. The stripped topsoil is to be tested and conditioned prior to replacing. Additional testing of the topsoil at time of earthworks is to be undertaken to confirm soil conditioning required and this cost of this testing is deemed to be included in the tendered lump sum. tmported topsoil will only be required if ordered by the Superintendent. The topsoil shall be of good quality to achieve the necessary grass cover and to the satisfaction to the Superintendent. Payment for imported topsoil will be made for the in situ volume using the rate specified in the appropriate Provisional Item in the Schedule of Tender Lump Sum. If no such item exists, payment shall be made at a rate agreed between the Principal and the Contractor. Topsoil shall be temporarily stockpiled onsite, but no stockpile shall exceed 1.2m in height. No vehicle shall be permitted to travel on the stockpile. Unless otherwise shown on the drawings or otherwise specified, topsoil shall be spread at a thickness of 100mm. The thickness for the playing fields shall be as determined in Clause 3.4.5. 7.3 Playing Field Surfacing Construction The playing fields shall be ameliorated by a specialist contractor in accordance with the following procedure. In conjunction with the amelioration and seeding of the playing fields, an irrigation system shall be installed in accordance with Clause 7.4. Step by step procedure* for construction of playing field surfacing: » Final trim of playing fields is to be approved in accordance with section 3.4.5; 41/22382/11840 Girraween Sports Precinct A2 Earthworks Package
Page 134
(2) » Soil tests shall be undertaken and assessed by a specialist contractor for assessment of required ameliorants; » Design of the proposed ameliorant quantities shall be completed, with final cost and submitted to the Superintendent for approval; » The irrigation system shall be installed (excluding the irrigation head) as per the approved design (Clause 7.4); » All composted organic matter and dolomite lime shall be spread via top dressing unit. Potassium sulphate and DAP are to be spread via fertiliser spreader; » The fields shall be cultivated (to a depth of 240mm) using a tractor operated RotaDairon (or approved equivalent). The surface shall then be levelled off using a drag mat to remove any visible depressions or humps; » The irrigation system installation shall be completed; » The contractor shall nominate a type and spread rate of proposed grass seed for approval by the Superintendent. The approved grass seed is to be placed at the approved rate. * this procedure is based on information supplied by Perfect Earth. Maintenance Period The playing fields shall be the subject of a performance based specification whereby the fields will only be accepted by the Council at such time as 95% cover has been achieved. The maintenance of the fields up until such time is solely the responsibility of the contractor. A maintenance schedule shall be supplied by the contractor and approved by the Superintendent prior to the placement of any grass seeding. This shall include a maintenance regime for establishment of grass cover until handover, and a longer term maintenance regime to be adopted by Council after handover. It is expected (subject to seasonal variation) that the fields will be handed over to Council 3 months from the completion of the seeding operation. 7.4 Irrigation System An irrigation system shall be designed with the design submitted for approval by the Superintendent for the playing fields. Recycled water will be available at the nearby water treatment plant with design and construction of the system from the take-off point at the plant included in this project. The ultimate irrigation system shall include a 130,000 litre holding tank at the water treatment plant which will deliver Class A water. The tank is sized to allow a full irrigation cycle of water. The holding tank will be installed by others. In lieu of provision of the holding tank, this project shall include a temporary takeoff point from the existing UV Filter at the treatment plant. This will include a submersible pump. The two Senior Soccer Fields (and athletics facility) only are required to be irrigated with this contract. However, the irrigation design is to include capacity to irrigate the junior fields and take off points to allow future connection shall be installed. 41/22382/11840 Girraween Sports Precinct a8 Earthworks Package
Page 135
= The irrigation system shall be capable of supplying 25mm of water to all fields per week within a 4 day 4 hour window. At present only Class B recycled water is available (it meets all requirements for Class A water, except for the added chlorine). The water management plan dictates that no access to the fields is available for 2 hours after completion of watering or if ponded water is present. Therefore, the watering cycle is to be complete by 10am to allow use from midday. The system must be configurable to allow the users to change the watering pattern should access be required before midday on any given day. The system shalt be controlled by a suitable controller placed on site, powered from the treatment plant (control cable to be installed alongside the irrigation line). The controller shall include a rain sensor, soil moisture sensor and flow sensor. The design of the irrigation system shall be submitted to the Superintendent for approval prior to installation works commencing. 7.5 Grass Seeding 7.5.1 Balance Area Grass seed shall be selected so as to achieve a long term cover of green “speedy” couch. Prior to issue of On Maintenance, grass cover shall average 100%. Coverage shall be determined using a 1m? piece of F41 reinforcing mesh placed directly over the area to be measured and counting the number of 100mm x 100mm squares where at least one strike has been achieved. At least one strike in each square represents 100% cover. An appropriate seed mix shall be used with due regard to the time of year. Fertiliser and water may be applied by the Contractor to achieve the necessary cover. 7.6 Hydroseeding Hydroseeding shall be used where shown on the drawings or directed by the Superintendent. A thoroughly mixed slurry of seed, fertiliser, mulch, water and binder shall be applied to the area to be grassed. The mixture is to be spread evenly over the prescribed area. Grass cover at issue of Off Maintenance is to achieve 100% cover as defined above. 7.7 Turfing Turf is to be provided in accordance with the drawings (i.e. at the edge of concrete footpaths) or as directed by the Superintendent. Unless otherwise specified, "A" grade “Wintergreen” couch turf is required, with a minimum thickness of 25 mm. The turf shall be supplied by a commercial grower of cultivated turf, and shall be handled and installed so as to avoid drying. All areas to be turfed shall be treated with pre-emergent sprays at the recommended mix strengths application intervals. It is essential that these playing areas have first priority in establishment. lmigation equipment must be functional prior to turfing. 41/22382/11840 Girraween Sports Precinct 44 Earthworks Package
Page 136
At issue of On Maintenance, the area turfed shall be healthy, green and free from bare earth areas or weeds. 41/22382/11840 Girraween Sports Pracinct Easthworks Package 45
Page 137
on 8. Retaining Walls The contractor shall design and construct the retaining walls, including any foundations or footings necessary, in the locations, and to the heights and slopes detailed in the Contract drawings, and shall undertake all testing on which to base the design. The contractor shall design the walls so that they conform to, and are acceptable to, the Local Council Standards. 8.1 Rock Retaining Walls Boulder retaining walls shall be located as shown on the landscape drawings and within the bio-retention basin. The Contractor shal! supply a design for the retaining walls and nominate the proposed rocks before commencing construction. The Superintendent shall approve the design of the retaining, with certification (where required) by the Contractor. Retaining walls shall be a maximum of 1m in height. 8.2 Crib Wall A concrete crib wall is required on the south west comer of the athletics track above the criterium track. The Contractor shall be responsible for design and certification of the wall. The Contractor shall supply the wall design for approval by the Superintendent prior to commencing construction. 41/22382/11840 Girraween Sports Precinct 46 Earthworks Package
Page 138
9. Two Coat Seal — Prime Coat 9.1 General The final seal design shall be done by the Contractor and submitted to the Contract Administrator for approval before application. 9.2 Authority to Commence Priming Priming shall not be undertaken until the Contract Administrator or the Contract Administrator's representative has inspected the pavement and approved the works to proceed. 9.3 Plant 9.3.1 Spraying Equipment All spraying equipment shall comply with the requirements of the NAASRA ‘Specification for Performance Requirements for Mechanical Sprayers of Bituminous Materials’. When requested by the Contract Administrator, the Contractor shall provide a current certificate and calibration chart issued by the Queensland Department of Main Roads before commencing spraying operations. 9.3.2 Rollers The following rollers may be used: » Three point self-propelled steel roller of minimum 8 tonnes mass; » Self-propelled rubber tyred roller minimum 15 tonnes mass, 9.3.3 Trucks Sufficient numbers of single or tandem-axle trucks with tipper bodies should be made available. The trucks should be fitted with approved tailgate-mounted metal spreaders. In addition, at least one truck with drop-sided or tray body for the manual application of aggregate should be provided (as required). 9.3.4 Brooms A mechanical broom capable of removing all dust and debris from the surface of the road (prior to spraying), and a drag-broom, capable of evenly spreading aggregate but not so as to dislodge stones from the mat, should also be provided. Drag-brooming should be avoided if at all possible and only carried out under strict control after approval by the Contract Administrator. 9.4 Application The primed base course shall be sufficiently dry with sealing not to be carried out during inclement 41/22382/11840 Girraween Sports Precinct 47 Earthworks Package
Page 139
= weather conditions unless special provisions are made to the approval of the Contract Administrator. Before priming, the pavement shall be broomed free of all loose material, dust and caked material, and any defects made good. A clean, mosaic, tightly bound surface shall be presented. Should conditions require, and if approved by the Contract Administrator the surface may be lightly watered immediately prior to priming. The following seal design is an estimate only. The Contractor shall carry out seal designs and submit to the Contract Administrator for approval prior to sealing. The first coat seal shall be cutback binder consisting of 90% bitumen and 10% power kerosene applied at an estimated rate of 1.5 I/m?, measured at a temperature of 15°C and applied at a temperature between 168°C and 178°C. The binder is to be covered with aggregate within 10 minutes after spraying. The second coat seal shall be cutback binder consisting of 90% bitumen and 10% power kerosene applied at an estimated rate of 0.9 I/m?, measured at a temperature of 15°C and applied at a temperature between 168°C and 178°C. The binder is to be covered with aggregate within 10 minutes after spraying. The bitumen shall be modified with 0.40% wet fix or similar approved during wet weather laying. Seal designs using emulsion-based binder will also be considered for approval by the Contract Administrator. 9.5 Aggregate Aggregate shall be crushed from hard, sound, durable rock. The percentage loss as measured by the Los Angeles Abrasion Test shall not exceed 30. All aggregates shall be free of excess dust, and the Contract Administrator may order the pre-washing of dusty aggregate. Aggregate test procedures are to be in accordance with Queensland Main Roads Standard Specification MRS 11.22. Unless otherwise approved, the first coat seal blinding shall be a nominal 14mm pre-coated aggregate, applied immediately after spraying at an estimated rate not less than 1 cubic metre per 90 square metres and sufficient to prevent lifting of the sealed surface by vehicles. Unless otherwise approved the second coat seal blinding shall be a nominal 10mm pre-coated aggregate applied at an estimated rate not less than 1 cubic metre per 100 square metres and sufficient to prevent lifting of the sealed surface by vehicles. The surface is to be rolled until the aggregate is firmly embedded in the binder. All surplus aggregate shall be swept up and removed from site not less than seven days after the completion of the rolling or as approved by the Superintendent. 9.6 Acceptance Tolerances The width of the prime shall not vary by more than + 150mm - 0mm. 41/22382/11840 Girraween Sports Precinct 48 Earthworks Package
Page 140
Acceptance of sealed surfaces will be subject to the availability of certified records of the works carried out. Actual rate of application of binder shall be in the range of 95% to 110% of the ordered rate. If the application rate is less than 90% or more than 110% the surface shall be resealed (unless otherwise directed). 9.7 Test Certificates for Sprayed Primes and Seals » A Supplier's certificate detailing material supplied and quality. A certificate for each coat per run is required. » Abitumen spray record detailing actual bitumen application rate, temperature and area sprayed for each run. » Anapplication record of cover application rate for each aggregate run. 41/22382/11840 Girraween Sports Precinct 49 Earthworks Package
Page 141
() GHD 4-6 Innovation Parkway, BIRTINYA QLD 4575 PO Box 1540, BUDDINA QLD 4575 T: 61 75413 8100 F: 61 7 5413 8199 E: [email protected] © GHD 2010 This document is and shall remain the property of GHD. The document may only be used for the purposes for which it was commissioned and in accordance with the Consultancy Agreement for the commission. Unauthorised use of this document in any form whatsoever is prohibited. Document Status Reviewer Approved for Issue ne Author . Name Signature Name Signature Date 0 K. Gibson 41/22382/11840 Girraween Sports Precinct Earthworks Package
Page 142
(GHD) CLIENTS|PEOPLE|PERFORMANCE Sunshine Coast Regional Council Girraween Sports Precinct Environmental Management Plan (Construction) May 2010 INFRASTRUCTURE | MINING & INDUSTRY | DEFENCE | PROPERTY & BUILDINGS | ENVIRONMENT
Page 143
() 412238212186 Contents 1. Introduction 1.1. Background 1.2 Environmental Context of Site 1.3. Scope of Work 1.4 Definitions 1.5 Reporting Requirements 2. Legislation, Approvals and References 2.1 Relevant Legislation 2.2. Approvals 2.3 Reference Guidelines 3. General Site Establishment 3.1 Site Access 3.2 Site Amenities 3.3 Sensitive Areas 4. Vegetation Protection 4.1. General 4.2 Objectives 4.3. Requirements 4.4 Responsibilities 5. Fauna and Habitat Protection 5.1. General 5.2 Objectives §.3 Requirements 5.4 Responsibilities 6. Weed & Pest Control 6.1 General 6.2 Objectives 6.3. Requirements 6.4 Responsibilities 7. Soil Erosion and Sediment Control Girraween Sports Precinct Environmental Management Plan (Construction) a hw os a oon Om 11 1 11 11 12 12 12 12 13 14 14 14 14 15 16 16 16 17 17 18
Page 144
41/22382/12186 7.1 Objectives 7.2 Requirements 7.3. Responsibilities 8. Water Quality Protection (Surface & Groundwater) 8.1 General 8.2 Objectives 8.3. Responsibilities 9. Air Quality Protection 9.1 General 9.2 Objectives 9.3 Requirements 9.4 Responsibilities 10. Acid Sulfate Soils 10.1 General 10.2 Objectives 10.3 Requirements 10.4 Responsibitities 11. Waste Management 11.1 General 11.2 Objectives 11.3 Requirements 11.4 Responsibilities 12. Noise Management 12.1 General 12.2 Objectives 12.3 Requirements 12.4 Responsibilities 13. Cultural Heritage Management 13.1 General 13.2 Responsibilities 14. Bushfire Control 14.1 General 14.2 Objectives Glrraween Sports Precinct Environmental Management Plan (Construction) 18 18 19 20 20 20 20 22 22 22 22 22 24. 24 24 24 24 26 26 26 26 26 27 27 27 27 27 29 29 29 30 30 30
Page 145
a
14.3. Requirements
14.4 Responsibilities
15. Storage and Use of Plant and Materials
15.1 Hazardous Chemical/Material Usage and Storage
45.2 Plant and Machinery Storage
16. Environmental Incident Management
16.1 General
16.2 Objective
16.3 Requirements
16.4 Responsibilities
17. Engagement and Training of Personnel
17.1 Site Induction Procedures
17.2 Staff Training
17.3 Workplace Health and Safety Site Plan
Table Index
Table 1 Acronyms and Terms
Figure Index
Figure 1 Locality Map of Girraween Sports Precinct Site
Figure 2 Mapped Regulated Regrowth in the Northwest of
the Site
Appendices
A Development Approval and Conditions
Rainbow Bee-eater Management Plan
C_ Site Reporting Form
D_ Erosion and Sediment Contro! Pian
E Due Diligence Report
41/22382/12186 Glrraween Sports Precinct
Environmental Management Plan {Construction}
30
30
31
31
32
33
33
33
33
34
36
36
36
36
Page 146
& 1. Introduction 1.1 Background GHD has been commissioned by the Sunshine Coast Regional Council (SCRC) to provide environmental management documentation for the construction of Girraween Sports Precinct, Noosaville. Construction will be undertaken by contractors appointed by SCRC. The development involves the construction of a sports ground including soccer fields, associated infrastructure and car parks. A locality plan identifying the site and surrounds is presented as Figure 1. The majority of works will be located on Lot 1 on $P177650, which is a freehold tenured property owned by SCRC. Some works will also be required on the local government controlled Eenie Creek Road reserve. 1.2 Environmental Context of Site The site is on the south side of Eenie Creek Road, Noosaville and is accessed from the roundabout at Langura Street. The site is bordered by: » vegetation on a gentle slope grading to Burgess Creek to the east; » native bushland regrowth to the west adjoined by Council's Noosa sewage treatment plant further to the west; and » the Girraween Nature Refuge to the south. The site is surrounded by several sensitive environmental areas including: » Noosa National Park; » Lake Weyba Wetlands; » Noosa-Maroochy Wallum Area; » Burgess Creek — Eastern arm (approximately 75 m to the east and southeast); and » Burgess Creek —- Western arm (approximately 100 m to the west) ~ this creek appears as a drainage channel as it receives treated effluent from Council's municipal sewage treatment plant. Other potentially sensitive receptors in the area include: » Two schools: ce Sunshine Beach High School located approximately 500 m east; o Sunshine Beach Primary School located approximately 500 m east; » The Noosa Aquatic Centre and tennis centre are adjacent north of the high school; and » Alarge residential precinct is north — north west of the site with the nearest houses approximately 350 m from the construction site entrance. 41/22382/12186 Girraween Sports Precinct 1 Environmental Management Plan (Construction)
Page 147
0500 00000 LEGEND Project Extent Regional Ecosystem CL] Cadastral Boundary i Of Concern - dominant Conservation Estate ‘a Least Concern Non-remnant 16,000 (at A3) ‘0 20 | | ) Metres Map Projection: Transverse Mercator Nerzoral Dalen Gnocentc Daim of Austin (GDA) c F Map Grid of Australia 1984, Zone 56 Sunshine Coast Council Job Number |41-22382 Girraween Sports Precinct Revision |A Date | MAY 2010 Locality Map Figure 1 vation Parkway, Birtinya QLD 4575 16175413 8100 F 6175413 8199 E Wwwwghd.com au
Page 148
= 1.3 Scope of Work This construction environmental management plan (CEMP) has been prepared for SCRC to assist the Construction Contractor and other parties associated with the project to undertake site work in a manner that is compliant with local government requirements, relevant statutes, guidelines and legislation, performance requirements of the contract and best-practice environmental management. This CEMP addresses the management of the following potential environmentally sensitive issues expected to be associated with the construction phase: » legislative compliance; » vegetation protection; » fauna and fauna habitat protection; » weed & pest control; » soil erosion and sediment control; » water quality protection; » air quality protection; » acid sulfate soil management; » waste management; » amenity management; » cultural heritage management, and » bushfire control. > This CEMP nominates specific actions to be undertaken by the Construction Contractor (or nominated sub-contractor(s)) throughout the construction phase of the development to ensure full compliance with statutory requirements in respect to all activities undertaken. It should be noted that the CEMP may be used as a guide for the Construction Contractor or nominated sub-contractor(s) to develop and implement their own provisions that accord with the objectives of the plan and the principles of best- practice environmental management. The Rainbow Bee-eater Management Plan, which is attached to this CEMP as Appendix A, must be adhered to in order to provide protection to populations of this species. Measures to mitigate impacts to this species are necessary to comply with the objectives of the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act). The CEMP is open to periodic review in response to updated knowledge and techniques gained during the course of operations, changed community standards and occurrence of environmental incidents, which may show deficiencies in this document. Proposed changes to the CEMP should be developed and implemented in consultation with relevant authorities. 41/22382/12186 Girraween Sports Precinct Environmental Management Plan (Construction)
Page 149
or 1.4 Definitions Within this document, the following definitions apply: » Construction Manager is deemed to be the Construction Contractor (or nominated sub-contractors) for the site; » Site Foreman is any person appointed by the Construction Manager to act in the capacity as Site Foreman for the site; and » Environmental Management Officer (EMO) is any person appointed by the Construction Manager to act in the capacity of an EMO. Additional abbreviations, acronyms and terms used in this document are defined in Table 1. Table 1 Acronyms and Terms acti el aiialiacel) ASS Acid sulfate soils CEMP Construction Environmental Management Plan DERM Department of Environment and Resource Management (formerly EPA and NRW) EMO Environmental Management Officer EPBC Act Environment Protection and Biodiversity Conservation Act 1999 EPP (Air) Environmental Protection (Air) Policy 2008 EPP (Noise) Environmental Protection (Noise) Policy 2008 EPP (Waste) Environmental Protection (Waste) Policy 2000 EPP (Water) Environmental Protection (Water) Policy 2009 ERA Environmentally Relevant Activity Koala Plan or SEQ Koala Conservation SPRP Nature Conservation (Koala Conservation) Plan or superseded by SEQ Koala Conservation State Planning Regulatory Provisions (currently draft) LPA Land Protection (Pest and Stock Route Management) Act 2002 MSDS Material Safety Data Sheet NCA Nature Conservation Act 1992 PPE Personal Protective Equipment QASSIT Guidelines for Sampling and Analysis of Lowland Acid Sulfate Soils (ASS) in Guidelines Queensland 1998 (Department of Natural Resources and Mines) QPWS Queensland Parks and Wildlife Service Queensland Primary Industries and Fisheries (within the Department of Employment, Economic Fisheries Development and Innovation) 41/22382/12186 Girraween Sports Precinct 4 Environmental Management Pian (Construction)
Page 150
Term Definition RE Regional Ecosystem SCRC Sunshine Coast Regional Council VMA Vegetation Management Act 1999 1.5 Reporting Requirements All non-conformance events which arise from non-compliance with the provisions of this CEMP will be duly and appropriately recorded by the Site Foreman and made available to the Superintendent within a 24-hour period. Typically, non-conformance issues will be recorded by the Site Foreman and forwarded to the Construction Manager who will be responsible for storing all records appropriately and providing records to the Superintendent. Where a non-conformance event occurs, the non-conformance report is to include the following information: » The location of the non-conformance event; » The time of the non-conformance event; » The time that the Site Foreman became aware of the non-conformance event; » The suspected cause of the non-conformance event; » The type of contaminant released (if any); » Adescription of the resulting impacts of the non-conformance event; » Actions taken to mitigate any environmental harm and or environmental nuisance caused by the non- conformance event; and » Proposed actions to prevent a recurrence of the non-conformance event. Additionally, all complaints received from members of the community regarding the operations and activities being conducted on-site will be recorded and addressed as relevant by the concerned authorities, namely the on-site works Contractor and the SCRC. All complaints shall be addressed as quickly as possible and treated in the most practical way. Complaints are to be recorded on a Site Activities Complaints Form. An example of the information required is provided in Appendix C. 41/22382/12186 Girraween Sports Precinct 5 Environmental Management Plan (Construction)
Page 151
ep 2. Legislation, Approvals and References 2.1 Relevant Legislation The statutory requirements which apply to the project and govern the content of this document are detailed below. 2.1.1 Environmental! Protection Act 1994 The Environmental Protection Act 1994 was created to protect Queensland's environment while allowing for development that improves the total quality of life, in a way that maintains the ecological processes on which life depends. The Act, which is administered by the Department of Environment and Resource Management (DERM, previously the Environmental Protection Agency) utilises a number of mechanisms to achieve its objectives. These include creating a general environmental duty, licensing environmentally relevant activities (ERAs), and issuing environmental protection policies which are briefly described below. General Environmental Duty Section 319 of the Act which conveys the general environmental duty, states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmentally Relevant Activities The legislation identifies a number of ERAs, which are listed in Schedule 2 of the Environmental Protection Regulation 2008. |t is an offence to conduct ERAs without an environmental authority (i.e. a registration certificate) issued by the DERM. Environmental Protection (Water) Policy 2009 Provisions contained within the EPP (Water) prohibit the deposit or release of certain things such as building waste, cement or concrete, rubbish and oil into a roadside gutter, stormwater drain or a place where it could have the potential to contaminate a watercourse. Given that construction works will be undertaken adjacent to Burgess Creek and Lake Weyba Wetlands, this policy will have bearing on the construction works. Water quality and hydrology management actions are provided in Sections 7 and 8 of this CEMP. Environmental Protection (Air) Policy 2008 The EPP (Air) covers environmental management decisions and air pollution dispersion modelling and monitoring of releases, management of certain sources of contamination, and nominates a whole-of- government approach to managing the air environment. Air quality indicators and goals for various contaminants are also stated. Air quality management actions are provided in Section 9 of this CEMP. Environmental Protection (Noise) Policy 2008 Provisions contained within the EPP (Noise) establish acoustic quality objectives and the abatement of unreasonable noise and is intended to provide measures and equipment suggested for making noise assessment. Noise management actions are included in Section 12 of this CEMP. 41/22382/12186. Girraween Sports Precinct 6 Environmental Management Pian (Construction)
The text continues on page 152.
Used in these records
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.