Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
= Playing Fields The playing fields are to be excavated or filled with bulk material as described in section 3.4.2 and 3.4.3 above to a level of 250mm below the finished surface levels. The final 250mm shall be made up from the stockpiled topsoil. If insufficient topsoil is available, the thickness of the topsoil layer shall be modified with agreement of the Superintendent. The final trim for the playing fields is to be completed to ensure the grades shown on the plans are achieved. In addition, the vertical tolerance of setout points shall shown on the plans be +/-15mm. Conforming survey is to be provided to the Superintendent prior to commencement of the playing fields amelioration. The playing fields are to be free of any depressions or humps and shall be free draining. The amelioration of the playing fields cannot commence until the Superintendent has approved the final trim of the surface. 3.4.6 Unpaved Areas Footpaths and other unpaved areas shall be left free from rubbish, stones, felled timber and brush, and left smooth and clean, true to the grade and levels shown on the drawings. The allowable variation on design level at any point shall be 50 mm provided that all areas are free draining and no ponding of water occurs. 3.5 Quality Control Testing The cost of all testing of materials to ensure quality control during construction shall be borne by the Contractor. If processed samples are unsatisfactory, costs of additional necessary testing will also be bome by the Contractor. Testing of subgrade CBR shall be carried out a minimum of 10 working days prior to the placement of sub-base pavement material. The frequency of testing to be carried out shall be the maximum of either one (1) test per 1000 square metres of subgrade, or one (1) test per identifiable soil type with a minimum number of three CBR tests to be carried out for any project. The cost of all subgrade CBR testing shall be borne by the Contractor. 3.6 Utility Services Where any valve, hydrant or other surface fitting of a utility service occurs in the area to be constructed, the Contractor shall ensure it is not damaged by the Contractor's operations. The Contract provides for the Contractor to adjust the levels of cast iron boxes and fittings to suit new footpath levels. Generally all these items are to be left flush with the final footpath levels or 25 mm above non-paved areas at the completion of the Project. 3.7 Erosion and Sediment Control During construction and upon completion of earthworks the Contractor is to undertake erosion and 41/22382/11840 Girraween Sports Precinct 21 Earthworks Package
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.