Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
S oe Additional Tolerances » The deviation from a 3m long straight edge placed anywhere on the surface of the base layer shall not exceed 25mm for subbase and 15mm for base layer. Transverse to the centre line and between any two points more than 2m apart, the crossfall shall not depart from the crossfall shown in the documents by more than 0.5% absolute. 4.1.3 Final Trim Following placement and compaction of the base course material, the whole of the surface of the base course shall be final graded and trimmed to the specified tolerances so as to leave a hard, dense, tightly packed surface free of lenses, compaction planes and caking. Asphaltic concrete surfacing shall not be commenced until the profile, surface, compaction, quality and finish of the pavement have been inspected and confirmed satisfactory. 4.1.4 Quality Control Testing The cost of all testing of materials to ensure quality control during construction shall be borne by the Contractor. If processed samples are unsatisfactory, cost of additional necessary testing will also be bome by the Contractor. The Contractor shall comply with the Quality Assurance requirements as specified herein. » Pavement Quality Tests as follows: ~ Gradings, Atterbergs and Soaked CBRs (for each pavement course, 1 test for each 400m of material); - Tests to determine properties in accordance with Local Council specification (for each pavement course 1 test for each source of material supplied). » Pavement Compaction Tests: — Test each pavement course layer at the rate of 1 test per 1,000m? with a minimum of three (3) tests per sample area. » Pavement Geometric Tolerances: — Primary Level (along centreline at every chainage cross section given in plans or every 25m, whichever is lesser of the two); — Straight Edge Deviation (left and right hand side at every chainage cross section given in plans or every 25m, whichever is the lesser of the two). - Crossfall (ss above). 4.2 Subsoil Drains 4.2.1 Construction Subsoil drainage shall be constructed in accordance with the construction drawings provided. 41/22382/11840 Girraween Sports Precinct 25 Earthworks Package
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.