Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
6. Concrete Work 6.1 Materials and Construction Requirements Materials and construction requirements for concrete shall be in accordance with Section 19 of Australian Standard AS 3600. Materials used for concrete work shall comply with Australian Standards listed in Clause 19.1 of AS 3600. All concrete used in this contract shall be manufactured in accordance with AS 1379. All concrete to be incorporated in the works shall be sourced from a quality assured Readymix Concrete Supplier. Concrete materials shall be proportioned so that when manufactured in accordance with AS 1379 and transported, placed, compacted, finished and cured in accordance with AS 3600 and this Specification, the hardened concrete will satisfy the design requirements for strength, serviceability and durability. Type GP cement shall be used. A manufacturer's certificate in the form of a delivery docket in accordance with AS 1379 shall be supplied for each batch and shall be retained by the Contractor. Such certificates shall be held and maintained in the Contractors quality records for the project. Further, the Contractor shall obtain a statement from the manufacturer qualifying the quality standard of the concrete in accordance with the requirements as specified herein. No admixtures shall be used without the written approval of the Superintendent. The Contractor shall submit full details of the mix proportions intended to be used for this contract. The Contractor shall advise the Superintendent of the name of his intended concrete supplier for the Superintendent's review and approval, if acceptable. The Contractor shall advise whether his concrete supplier's manufacturing plant complies with AS 3600, in regard to production of standard strength grades of concrete. All aggregates shall comply with the requirements of AS 2758.1 "Concrete Aggregates". 6.2 Concrete Strength Criteria All concrete work is specified as normal class concrete or special class as shown on the Notes on the drawings. 6.3 Rejection of Concrete The provisions of Clause 19.1.7 of AS 3600 shall be read in full as part of this specification. 6.4 Testing and Assessment for Compliance of Concrete Specified by Compressive Strength All concrete shall be subject to production assessment in accordance with AS 3600 Section 19. Prior to the commencement of concrete work, the Contractor shall advise which procedure is to be used for 41122382/11840 Girraween Sports Precinct 35 Earthworks Package
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.