Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
fl. water has been removed, a layer of cement mortar of similar composition to that embodied in the new concrete, excluding the large aggregate and of plastic consistency, about 12 mm in thickness shall be thoroughly broomed and brushed over the prepared surface and worked into all crevices and depressions after which the new concrete shall be placed immediately so as to make a thoroughly bonded and watertight joint. 6.10 Formwork Formwork shall be in accordance with SAA Formwork Code AS 3610. The Contractor shall supply, erect and maintain in good condition all forms necessary for shaping the concrete. All plans of forms and falsework must be submitted to the Superintendent for approval before their construction is undertaken. All forms must be approved by the Superintendent before concrete is placed and forms found unsatisfactory in any respect shall not be used. Notwithstanding the approval of forms and falsework by the Superintendent, the Contractor shail bear full responsibility for the safety of all forms and falsework, and for carrying out the work in full accordance with the drawings and this specification. All forms shall be constructed of wood or metal and shall be built mortar-tight and of sufficient rigidity to prevent distortion due to the pressure of the concrete and other forces incidental to the construction operations. Forms shall be constructed and maintained so as to prevent warping and the opening of joints due to shrinkage of the timber. All timber used in the manufacture of the forms must be approved by the Superintendent, and where timber is used for formwork for exposed surfaces, the forms shall be made of dressed timber of uniform thickness. The forms shall be substantial and unyielding and shall be so designed that the finished concrete will confom to the shape, lines and dimensions as called for on the drawings. All exposed concrete edges shall have a 20 mm chamfer unless otherwise indicated and this shall be obtained by the use of angle fillets in the angles of the forms. Exposed re-entrant corners shall have a 20 mm fillet unless otherwise indicated. The inside of forms shall be coated with non-staining mineral oil or other approved material which shall be applied before the reinforcement is placed. The method for holding forms in position shall be approved by the Superintendent. Any bolts supporting forms shall be so greased and arranged that they may be removed from the concrete after removal of forms without excessive jarring or hammering and without injury to the concrete surfaces by spalling or otherwise. When the bolts have been withdrawn, the holes shall be filled with cement mortar and well rammed into position. Tie wires passing through the concrete will not be permitted. Where bolts or rods acting as internal ties are to be left in position, they shall be so arranged that when the forms are removed no metal shall be within the clear cover requirements of any surface. Resulting cavities shall be packed with cement mortar. 41/22382/11840 Girraween Sports Precinct 39 Earthworks Package
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.