Skip to the record
Accept no substitutions.

Council archive · source document

06/1168 - Change a Development Approval [As Published] · 132006.1168.02

of 199

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

=

1.3 Scope of Work

This construction environmental management plan (CEMP) has been prepared for SCRC to assist the
Construction Contractor and other parties associated with the project to undertake site work in a manner
that is compliant with local government requirements, relevant statutes, guidelines and legislation,
performance requirements of the contract and best-practice environmental management.

This CEMP addresses the management of the following potential environmentally sensitive issues
expected to be associated with the construction phase:

» legislative compliance;

» vegetation protection;

» fauna and fauna habitat protection;
» weed & pest control;

» soil erosion and sediment control;
» water quality protection;

» air quality protection;

» acid sulfate soil management;

» waste management;

» amenity management;

» cultural heritage management, and
» bushfire control. >

This CEMP nominates specific actions to be undertaken by the Construction Contractor (or nominated
sub-contractor(s)) throughout the construction phase of the development to ensure full compliance with
statutory requirements in respect to all activities undertaken. It should be noted that the CEMP may be
used as a guide for the Construction Contractor or nominated sub-contractor(s) to develop and
implement their own provisions that accord with the objectives of the plan and the principles of best-
practice environmental management.

The Rainbow Bee-eater Management Plan, which is attached to this CEMP as Appendix A, must be
adhered to in order to provide protection to populations of this species. Measures to mitigate impacts to
this species are necessary to comply with the objectives of the Environment Protection and Biodiversity
Conservation Act 1999 (EPBC Act).

The CEMP is open to periodic review in response to updated knowledge and techniques gained during
the course of operations, changed community standards and occurrence of environmental incidents,
which may show deficiencies in this document. Proposed changes to the CEMP should be developed
and implemented in consultation with relevant authorities.

41/22382/12186 Girraween Sports Precinct
Environmental Management Plan (Construction)

Used in these records

About this file

File size
20.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_1168 - Change a Development Approval [As Published].pdf · 20.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.