Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
= 1.3 Scope of Work This construction environmental management plan (CEMP) has been prepared for SCRC to assist the Construction Contractor and other parties associated with the project to undertake site work in a manner that is compliant with local government requirements, relevant statutes, guidelines and legislation, performance requirements of the contract and best-practice environmental management. This CEMP addresses the management of the following potential environmentally sensitive issues expected to be associated with the construction phase: » legislative compliance; » vegetation protection; » fauna and fauna habitat protection; » weed & pest control; » soil erosion and sediment control; » water quality protection; » air quality protection; » acid sulfate soil management; » waste management; » amenity management; » cultural heritage management, and » bushfire control. > This CEMP nominates specific actions to be undertaken by the Construction Contractor (or nominated sub-contractor(s)) throughout the construction phase of the development to ensure full compliance with statutory requirements in respect to all activities undertaken. It should be noted that the CEMP may be used as a guide for the Construction Contractor or nominated sub-contractor(s) to develop and implement their own provisions that accord with the objectives of the plan and the principles of best- practice environmental management. The Rainbow Bee-eater Management Plan, which is attached to this CEMP as Appendix A, must be adhered to in order to provide protection to populations of this species. Measures to mitigate impacts to this species are necessary to comply with the objectives of the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act). The CEMP is open to periodic review in response to updated knowledge and techniques gained during the course of operations, changed community standards and occurrence of environmental incidents, which may show deficiencies in this document. Proposed changes to the CEMP should be developed and implemented in consultation with relevant authorities. 41/22382/12186 Girraween Sports Precinct Environmental Management Plan (Construction)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.