Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Term Definition RE Regional Ecosystem SCRC Sunshine Coast Regional Council VMA Vegetation Management Act 1999 1.5 Reporting Requirements All non-conformance events which arise from non-compliance with the provisions of this CEMP will be duly and appropriately recorded by the Site Foreman and made available to the Superintendent within a 24-hour period. Typically, non-conformance issues will be recorded by the Site Foreman and forwarded to the Construction Manager who will be responsible for storing all records appropriately and providing records to the Superintendent. Where a non-conformance event occurs, the non-conformance report is to include the following information: » The location of the non-conformance event; » The time of the non-conformance event; » The time that the Site Foreman became aware of the non-conformance event; » The suspected cause of the non-conformance event; » The type of contaminant released (if any); » Adescription of the resulting impacts of the non-conformance event; » Actions taken to mitigate any environmental harm and or environmental nuisance caused by the non- conformance event; and » Proposed actions to prevent a recurrence of the non-conformance event. Additionally, all complaints received from members of the community regarding the operations and activities being conducted on-site will be recorded and addressed as relevant by the concerned authorities, namely the on-site works Contractor and the SCRC. All complaints shall be addressed as quickly as possible and treated in the most practical way. Complaints are to be recorded on a Site Activities Complaints Form. An example of the information required is provided in Appendix C. 41/22382/12186 Girraween Sports Precinct 5 Environmental Management Plan (Construction)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.