Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
__ el 3 General Site Establishment 3.1 Site Access Access throughout the construction phase will be gained from the roundabout at Langura Street and Eenie Creek Road. To ensure the safety of workers and to prevent unauthorised access by outsiders, appropriate traffic control, signage and barrier mesh may need to be established to assist in the management of the construction area. Provision will be made for managing vehicle and pedestrian movements by the public during the period of construction to minimise human health risks. 3.2 Site Amenities Site toilet facilities are likely to comprise chemical toilets during the construction phase. It is likely that a site office and lunch rooms may also be provided for the majority of construction works. 3.3 Sensitive Areas The site is surrounded by a number of sensitive areas (refer Section 1.2) and due consideration should be given to these areas when selecting site offices, access and lay down areas. 41/22382/12186 Girraween Sports Precinct Environmental Management Plan (Construction) 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.