Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
= Adequate erosion and sediment control must be installed prior to clearing commencing and modified as required to prevent loss of soil. No burning of vegetation will be permitted on-site. Any landscaping or revegetation is to be done in accordance with clearing permit requirements and/or utilise local endemic species. Native vegetation cleared is to be mulched and used in revegetation/rehabilitation areas on-site. 4.4 Responsibilities 4.41 Construction Manager The Construction Manager is to be responsible for the ensuring the above provisions have been complied with. 4.4.2 Site Foreman The Site Foreman is to be responsible for: » Ensuring that all relevant protocols have been effectively implemented at the site; and » Advising the EMO of any deviation from the above provisions. 41/22382/12186 Girraween Sports Precinct 13 Environmental Management Plan (Construction)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.