Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
= 15. Storage and Use of Plant and Materials 15.1 Hazardous Chemical/Material Usage and Storage 15.1.1 General No significant quantities of hazardous or dangerous chemicals/materials will be used or stored at the construction site throughout the duration of construction activities. 15.1.2 Objectives » Toensure that all hazardous chemicals and materials are stored appropriately on the site so as to avoid possible spills and site contamination and subsequent risk to employees and sub-contractors and the surrounding environment. 15.1.3 Requirements » All hazardous chemicals/materials that are required to be stored on the site will be stored securely within an on-site storage container in a manner consistent with the relevant Australian Standard. This storage container will be locked after working hours to prevent unauthorised entry. » All hazardous chemicals/materials that are required to be stored on the site will be recorded on the on-site register of hazardous materials to be kept at the site. » All stored hazardous chemicals/materials will be clearly identified with name of substance, whether toxic in nature and toxicity rating. » Any contaminant spills (including oils and petrol) that occur on-site will be immediately contained and remediated. Spill kits that are appropriate to the chemicals/materials used will be kept in the work area. » Refuelling is to occur off-site or with appropriate controls taken by a fuel contractor. Proper environmental measures should be in place for avoiding any spillage during refuelling. » The Safety Plan for the construction site should feature emergency contact numbers such as nearest hospital, Poisons Information Centre, fire Station and any other relevant emergency number numbers. 15.1.4 Responsibilities Site Foreman The Site Foreman will be responsible for the following: » Ensuring that all hazardous or dangerous chemicals/materials used on the site are stored according to the provisions outlined above. » Prior to conclusion of working hours, the Site Foreman shall ensure that the storage container is securely locked so as to prevent unauthorised entry. » Ensuring that the hazardous materials register is updated regularly and kept in an easily accessible area in the site office. 41/22382/12186 Girraween Sports Precinct 31 Environmental Management Plan (Construction)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.